Power Your Drive for
City and County Parks

EV Charging Infrastructure Program

In a continued effort to reduce greenhouse gas emissions (GHGs) and air pollution, SDG&E® has adopted a new program that will bring 66 EV chargers installed at approximately 10 sites. The two types of chargers that will be installed include: Level 2 (208-240 volt) chargers that can provide up to 10-20 miles of range per hour of charging and DC fast chargers (480 volt) that can provide about 50-60 miles per hour of charging.  These chargers will accommodate existing EV drivers and encourage EV adoption. 

EV Charging Parks

Program Highlights 

Public Charging Option

  • To serve charging needs of the general public

No Cost Installation of EV Charging Infrastructure & EVSE

Versatile Site Design

  • A variety of available site configurations allows for site host flexibility including L2 and DC Fast Charging

SDG&E Ownership of EVSE

  • SDG&E will own, maintain and operate the EVSE

Program Eligibility Requirements

  • Must be a city or county park

  • Must be located in a disadvantaged community (DAC)

  • Agree to enroll in eligible Time-of-Use (TOU) pricing plan

  • Operate & maintain charging equipment for at least 8 years

  • Site must include an appropriate location to deploy the charging equipment in a cost-effective manner

  • Must provide charging data for at least 5 years

  • Own or lease property where chargers are to be installed or be the customer of record associated with meter

  • Provide an easement, if required

  • Agree to program terms & conditions

Interested in participating?

Contact us at [email protected].   To learn more about the assembly bills, check out the links below.