What is a WDAT Interconnection?

WDAT applies to all generating/storage facilities interconnecting to SDG&E’s Distribution System and selling at wholesale to the California Marketplace.

For interconnections of generating/storage facilities interconnecting to SDG&E’s Distribution System and selling only to SDG&E under Rule 21, refer to the Regla 21

Important WDAT Notices

WDAT Tariff Notices 

As a result of FERC’s approval of SDG&E’s compliance filing on Order No. 2023, the next proposed available cluster application window for interconnection requests to the WDAT Cluster Study Process (that parallels that of the CAISO) will be October 1 – October 15, 2026. SDG&E will update this notice as needed to reflect any new information as it becomes available.

WDAT Cluster Application Window Notices

As a result of the CAISO and SDG&E compliance filings for FERC Order No. 2023, the next proposed available cluster application window for interconnection requests to the WDAT Cluster Study Process will be October 1 - October 15, 2026. SDG&E will update this notice when the new information is available. 

WDAT Cluster Restudy Notices

 

Otros avisos

 

25.07 KB
DOCX
Transferencia entre interconexiones de la Regla 21 y WDAT – Actualizado el 1 de octubre de 2025
Transferencia entre interconexiones de la Regla 21 y WDAT – Actualizado el 1 de octubre de 2025

Rules/Tariff

Wholesale Distribution Access Tariff

WDAT tariff effective August 15, 2024, approved at FERC (“New and Current GIP”) in compliance with FERC Order 2023, subject to minor revisions ordered on compliance by FERC on November 20, 2025

2026 Compliance Filing for Order 2023 filed January 20, 2026

332.56 KB
(PDF)
WDAT Section 15 (Only section that changes in the WDAT Main Body), filed 1/20/2026
WDAT Section 15 (Only section that changes in the WDAT Main Body), filed 1/20/2026
1.72 MB
(PDF)
WDAT New Generator Interconnection Procedures ("New GIP) Attachment H, filed 1/20/2026
WDAT New Generator Interconnection Procedures ("New GIP) Attachment H, filed 1/20/2026
623.92 KB
(PDF)
WDAT New Small Generator Interconnection Agreement, Attachment E, filed 1/20/2026
WDAT New Small Generator Interconnection Agreement, Attachment E, filed 1/20/2026
797.66 KB
(PDF)
WDAT New Large Generator Interconnection Agreement Attachment G, filed 1/20/2026
WDAT New Large Generator Interconnection Agreement Attachment G, filed 1/20/2026
1.76 MB
(PDF)
Redline changes from 8/14/2024 GIP to 1/20/2026 GIP, filed 1/20/2026
Redline changes from 8/14/2024 GIP to 1/20/2026 GIP, filed 1/20/2026

2024 Compliance Filing for Order 2023 filed August 14, 2024

932.64 KB
(PDF)
WDAT Main Body and Attachments other than Attachment E, G, and H, filed 8/14/2024
WDAT Main Body and Attachments other than Attachment E, G, and H, filed 8/14/2024
1.75 MB
(PDF)
WDAT new Generator Interconnection Procedures (“New GIP”) Attachment H, filed 8/14/2024
WDAT new Generator Interconnection Procedures (“New GIP”) Attachment H, filed 8/14/2024
647.94 KB
(PDF)
WDAT new Small Generator Interconnection Agreement -  Attachment E, filed 8/14/2024
WDAT new Small Generator Interconnection Agreement -  Attachment E, filed 8/14/2024
1.01 MB
(PDF)
WDAT new Large Generator Interconnection Agreement – Attachment G, filed 8/14/2024
WDAT new Large Generator Interconnection Agreement – Attachment G, filed 8/14/2024
1.75 MB
(PDF)
WDAT new Cluster Study Agreement (excerpt from Attachment H), filed 8/14/2024
WDAT new Cluster Study Agreement (excerpt from Attachment H), filed 8/14/2024
653.89 KB
(PDF)
WDAT new Facilities Study Agreement (excerpt from Attachment H), filed 8/14/2024
WDAT new Facilities Study Agreement (excerpt from Attachment H), filed 8/14/2024
2.01 MB
(PDF)
Redline changes from “old GIP” to “new GIP” from 2024 Compliance filing, filed 8/14/2024
Redline changes from “old GIP” to “new GIP” from 2024 Compliance filing, filed 8/14/2024
225.62 KB
(PDF)
Transition plan to new GIP, effective August 15, 2024, filed 8/14/2024
Transition plan to new GIP, effective August 15, 2024, filed 8/14/2024

WDAT tariff prior to August 15, 2024 (“Old GIP”) 

2.24 MB
(PDF)
WDAT Main Body and All Attachments – effective from January 23, 2015 to August 15, 2024
WDAT Main Body and All Attachments – effective from January 23, 2015 to August 15, 2024
1.50 MB
(PDF)
WDAT Generator Interconnection Procedures (“Old GIP”) Attachment H
WDAT Generator Interconnection Procedures (“Old GIP”) Attachment H
376.37 KB
(PDF)
WDAT Small Generator Interconnection Agreement (SGIA) Attachment E
WDAT Small Generator Interconnection Agreement (SGIA) Attachment E
719.65 KB
(PDF)
WDAT Large Generator Interconnection Agreement (LGIA) Attachment G
WDAT Large Generator Interconnection Agreement (LGIA) Attachment G

¿Cómo presento una solicitud?

Application is made to SDG&E using the online interconnection portal .

WDAT Payment Instructions

Información de Contacto 

Correo electrónico: [email protected] 
Generación de clientes 
San Diego Gas and Electric Company 
8316 Century Park Court   CP52F 
San Diego, CA 92123-1582 
Telephone Number:  858-636-5581 

Additional WDAT Interconnection Request Information

Helps in Preparing to File an Interconnection Request

43.03 KB
DOCX
Formulario de solicitud previa a la solicitud
Formulario de solicitud previa a la solicitud
254.38 KB
(PDF)
Pre-application report information
Pre-application report information
WDAT Interconnection Request Form (log into the online application portal to view)
WDAT Interconnection Request Form (log into the online application portal to view)
Distribution Service Request form (log into the online application portal to view)
Distribution Service Request form (log into the online application portal to view)
312.38 KB
(PDF)
Standard Confidentiality and Non-Disclosure Agreement for use in WDAT Cluster Study Process
Standard Confidentiality and Non-Disclosure Agreement for use in WDAT Cluster Study Process
153.45 KB
(PDF)
Site Control documentation acceptable to SDG&E
Site Control documentation acceptable to SDG&E
104.28 KB
(PDF)
Site Control Minimum Acreage Requirements
Site Control Minimum Acreage Requirements
377.74 KB
(PDF)
SDG&E’s WDAT Interconnection Queue
SDG&E’s WDAT Interconnection Queue
21.23 KB
DOCX
Redacted WDAT Cluster Study reports TBD
Redacted WDAT Cluster Study reports TBD
21.23 KB
DOCX
SDG&E Criteria for using sub-groups in Cluster Studies TBD
SDG&E Criteria for using sub-groups in Cluster Studies TBD
21.10 KB
DOCX
Transfer between WDAT and Rule 21 Interconnections
Transfer between WDAT and Rule 21 Interconnections
284.31 KB
(PDF)
Site Control Definition of 'Regulatory Limitations'
Site Control Definition of 'Regulatory Limitations'

Acceptable Forms of Security

255.54 KB
(PDF)
Letter of Credit (commercial readiness)
Letter of Credit (commercial readiness)
311.74 KB
(PDF)
Garantía
Garantía
326.74 KB
(PDF)
Fianza de seguridad
Fianza de seguridad
255.40 KB
(PDF)
Letter of Credit (generic)
Letter of Credit (generic)
873.47 KB
(PDF)
Acuerdo de custodia
Acuerdo de custodia