2014 All Source RFO

Information Regarding SDG&E 2014 Energy Storage Solicitations

Descripción de la RFO

San Diego Gas and Electric (SDG&E) is issuing its 2014 All Source Request for Offers (“RFO”) to solicit bids  in accordance with Decision (D.) 14-03-004 – Decision Authorizing Long-Term Procurement for Local Capacity Requirements due to Permanent Retirement of the San Onofre Nuclear Generation Station (the “Track 4 Decision”).

SDG&E is requesting offers for the following resources:

  1. Eficiencia Energética (EE)
  2. Respuesta a la demanda (DR)
  3. Renovables
  4. Energía y calor combinados (CHP)
  5. Almacenamiento de energía
  6. Convencional
  7. Generación Distribuida (DG)

For more information, click on the link for each specific resource.  Resource-specific RFO forms, documents, schedule and frequently asked questions can also be found by clicking the links above.

The below diagram provides a high level overview of SDG&E’s procurement authorization for this RFO. 

High Level Overview of SDG&E's procurement authorization

As shown in the above diagram (from D.14-03-004, p. 98), SDG&E is authorized to procure up to 800MW of energy storage, up to 775MW of preferred resources (not including energy storage) or up to 600 MW from ‘any source’, such as conventional resources or some combination thereof totaling up to 800 MW. 

SDG&E has separately filed an application for Commission approval of a 600 MW bilateral contract with a conventional resource, the Carlsbad Energy Center (A.14-07-009). 

If approved, 600 MW of SDG&E’s need will be filled by this contract and SDG&E will be authorized to procure a minimum of 200 MW of preferred resources, including at least 25 MW of energy storage.  In this event, bidders will be notified that 600 MW of the need eligible under this RFO has been filled.

SDG&E is soliciting third party-owned, contracted resources for all of the product types listed above with the exception of energy storage.  For the energy storage product type, SDG&E is soliciting both third party owned, contracted resources and energy storage systems to be owned by SDG&E (more information on Utility owned storage can be found in the Energy Storage RFO document). 

SDG&E’s solicitation process is designed and intended to evaluate the different resource types (and ownership structures, in the case of energy storage) on an equivalent basis.  SDG&E will consider loading order ranking of the resource types as a qualitative factor.  

Limit on Number of Offers / Bids

Each Respondent is limited to six bids.  Bids may include multiple locations, hybrid technologies, or phased development as long as the package is priced as a single bid.   Variations in critical project details, like commercial operation date, contract term, energy deliveries, capacity, interconnection point, or operational constraints, must be submitted as separate bids.  For example, a project consisting of multiple 5 MW storage systems sited across San Diego to be installed in phases over the course of 2 years for one all inclusive price would be considered one bid.  However, a project consisting of one solar facility located at a specific substation with six different possible commercial operation dates would be considered 6 different bids. 

If the respondent has questions or concerns regarding bid limits, please contact SDG&E at:  [email protected]

Participación de diversas empresas

SDG&E anima a las Empresas Comerciales Diversas (“DBE”), “Empresas Propiedad de Mujeres” o “Empresas Propiedad de Minorías” o “Empresas Comerciales de Veteranos Discapacitados”, según se definen en GO 156[1], a participar en esta RFO de Todas las Fuentes. 

Además, SDG&E anima a los promotores a utilizar empresas propiedad de minorías y mujeres (DBE, por sus siglas en inglés) durante las distintas etapas del desarrollo y la construcción de los proyectos. Como parte de la Orden Gubernamental 156, SDG&E exigirá a los promotores que identifiquen y verifiquen sus gastos con contratistas o subcontratistas DBE, si los hubiera.

Puede encontrar información adicional sobre el programa DBE de SDG&E y la utilización de empresas DBE en:

http://www.sempra.com/about/supplier-diversity/

y http://www.cpuc.ca.gov/puc/supplierdiversity/

SDG&E’s DBE Program representatives will provide a presentation during the bidders outreach event on September 26, 2014.  DBEs can request additional information by contacting SDG&E at [email protected].

RFO Questions and Answers / Frequently Asked Questions

Q&A documents have been updated to include questions received at the Pre-Bid Conference on 9/26, please see each product type webpage for product type specific Q&A.  Some edits have been made to previously posted Q&A, these changes will appear in redline.

Preguntas generales

Evaluation Related Questions

Interconnection Related Questions

Credit Related Questions

Please submit questions to SDG&E’s RFO team by email at [email protected]

SDG&E’s initial responses will be available one week after the first bidder’s conference. 

SDG&E will post responses periodically thereafter.  The deadline to submit questions is November 14, 2014 and SDG&E will post its final responses on December 1, 2014

Calendario de la RFO

El siguiente cronograma y plazos se aplican a esta solicitud de propuestas.

SDG&E reserves the right to revise this schedule at any time and at SDG&E's sole discretion. Respondents are responsible for accessing the resource-specific websites on a regular basis for updated schedule and possible amendments/changes to the RFO or the solicitation process for a specific resource.

No.

Parámetro

Fecha

1.

RFO emitido

5 de septiembre de 2014

2.

Conferencia previa a la licitación / Eventos de captación de licitadores

  1. 26 de septiembre de 2014
  2. 24 de octubre de 2014
  3. November 10, 2014 (EE, DR and Energy Storage)
3.

FECHA LÍMITE PARA REGISTRARSE para acceder al sitio web de RFO / para descargar formularios y documentos de RFO

1 de diciembre de 2014

4.

FECHA LÍMITE PARA ENVIAR PREGUNTAS
Fecha límite para la presentación de preguntas.
Answers to all questions will be posted on the website no later than December 1, 2014

14 de noviembre.

5.

FECHA DE CIERRE:
Las ofertas deben cargarse y recibirse en el sitio web de RFO a más tardar el 1:00 Hora del Pacífico, 5 de enero de 2015.

Enero 5, 2015

6.

SDG&E inicia el proceso de evaluación de ofertas.

Enero 6, 2015

 

 

 

8.

NOTIFICACIÓN DE SELECCIONADOS
SDG&E notifica a los licitadores preseleccionados.

5 de junio de 2015

9.

ACEPTACIÓN/RETIRADA DE LOS LICITADORES SELECCIONADOS
Carta que deben enviar los licitadores preseleccionados indicando:

  1. Retirada de la licitación de SDG&E; O
  2. Aceptación de la preselección, incluyendo la cuota de aceptación de la preselección.

+10 Días
después de la notificación de preselección

10.

SDG&E emite notificaciones de agradecimiento a los demandados que no resultaron seleccionados.

+3 semana
después de que los postores preseleccionados acepten/retiren

11.

SDG&E inicia negociaciones contractuales

+11 días después de la notificación de preselección

12.

SDG&E presenta los acuerdos a la CPUC para su aprobación.

Q1 2016

 

* El tiempo de negociación variará dependiendo de las particularidades de la propuesta, incluidas las modificaciones contractuales propuestas.

 

Outreach Events/Pre-Bid Conferences

SDG&E will host three bidder outreach events:

  1. The first event is scheduled for September 26, 2014 which will be an in-person event (with dial-in / webinar available for those that cannot attend in-person). 
  2. The second event will be a conference call / webinar only and is scheduled for October 24th. 
  3. The third event will focus primarily on the demand response, energy efficiency and energy storage product types will be in-person (conference call / webinar available) and is scheduled for November 10th.  Participation in these events is NOT mandatory in order to submit an offer.

Please monitor the RFO website for further details (such as conference presentation materials, location details, and final arrangements).  SDG&E will also make an effort to notify bidders of outreach event details via e-mail. 

Any party interested in attending these events should email the following information to the RFO mailbox ([email protected]):

  • Nombre de la empresa y
  • Nombres, cargos e información de contacto de los asistentes

To Contact SDG&E Regarding this RFO

All questions or other communications regarding this RFO must be submitted via e-mail to [email protected]

The deadline to submit questions is November 14, 2014.  All questions and answers will be posted on this website (see RFO Questions and Answers Link, above).

 

[1] Ver http://www.thesupplierclearinghouse.com/eligibility/default.asp for the definition of a DBE.

150.06 KB
(PDF)
Preguntas generales
Preguntas generales
206.52 KB
(PDF)
Evaluation Related Questions
Evaluation Related Questions
112.15 KB
(PDF)
Interconnection Related Questions
Interconnection Related Questions
54.48 KB
(PDF)
Credit Related Questions
Credit Related Questions
2.21 MB
PPTX
All-Source Pre-Bid Conference Presentation - 9/26/2014
All-Source Pre-Bid Conference Presentation - 9/26/2014
1.07 MB
(PDF)
All-Source Pre-Bid Conference – E3 Tools Presentation - 9/26/2014
All-Source Pre-Bid Conference – E3 Tools Presentation - 9/26/2014
1.29 MB
(PDF)
All-Source Pre-Bid Conference Presentation - 10/24/2014
All-Source Pre-Bid Conference Presentation - 10/24/2014
1.13 MB
(PDF)
All-Source Bidder's Conference Presentation - 11/10/2014
All-Source Bidder's Conference Presentation - 11/10/2014