2012年度 CHP電力購入契約に関する提案依頼書
カリフォルニア州公益事業委員会(「CPUC」)が2010年12月16日に決定10-12-035で承認した適格施設および熱電併給プログラム和解契約および関連文書(CHPプログラム和解契約条件書を含む)(総称して「和解契約」)に従い、サンディエゴ・ガス・アンド・エレクトリック・カンパニー(SDG&E)は、和解契約で設定および定義されたメガワット目標(「MW目標」)および温室効果ガス排出削減目標を達成するために、2012年CHP提案依頼書(「RFO」)を発行します。このRFOは、適格エネルギー発生者であるCHP施設の所有者および運営者(「回答者」)からの提案を募るものです。回答者は、回答することにより、このRFOの条件に拘束されます。
2010年12月16日にカリフォルニア州公益事業委員会(「CPUC」)によって承認されたCHPプログラム和解に基づき、[ 決定10-12-035 ], SDG&E seeks to acquire a total of up to 160 MW of combined heat and power (“CHP”) nameplate capacity under Power Purchase Agreements (“PPAs” or “Agreements”) during the Initial Program Period (2011-2015) and 51 MW in the Second Program Period (2012-2020), both of which periods are defined in the [ Settlement Agreement Term Sheet ]. Through this RFO, the first of three solicitations to be held during the Initial Program Period, and various other procurement alternatives under the Settlement Agreement, SDG&E seeks offers to help meet its Initial Program MW Target of 160 MW by November 23, 2015.
This RFO is limited to existing, new, repowered, and expanded CHP facilities to seeking a CHP Pro Forma PPA with SDG&E and to existing CHP facilities that wish to change operations to convert the facility to a utility prescheduled generation facility. This RFO is not requesting bids for renewable energy credits, feed-in-tariff projects or other RPS procurement activities that exist or are being contemplated.
最新のアップデート
2012 年 3 月 14 日
-
ご登録はこちらから 追加されました
please register by March 30, 2011 -
オファーフォーム has been updated to reflect additional Curtailment Options
see ‘Contract Pricing’ tab -
RA Confirmation 投稿されました
2012 年 3 月 7 日
Pre-Bid Conference: March 7, 2012
9:30am - 12:30pm
In-Person Registration starts at 9:00am
エネルギーイノベーションセンター
Cabrillo Room ‘C’, 4760 Clairemont Mesa Blvd.
サンディエゴ、カリフォルニア州92117
電話番号:(800)613-8970
Complimentary parking is available on site
ウェビナー
Dial-In Number (Toll Free): (866) 835-8908
ウェブリンク: http://icsus.meeting-stream.com/030712_Sempra_1571344/
Participants will use this link to register and join the live event. After the live event, this link becomes the archive (recording) link.
| 発電施設 | CHP施設(「CHP」) | 公益事業事前計画施設(「UPF」) |
| 施設のビンテージ | 新規、既存、改修、拡張 | |
| 最大期間 | 7 Years for Existing for Repowered, 12 Years for new and Expanded meeting Credit requirements (Section 3). | As Negotiated |
| PPAタイプ | CHP プロフォーマ PPA | CHP UPF PPA |
| 銘板 | 5MW以上 | |
| 配達ポイント | カイソ | |
落札者は、RFO文書(下記参照)に記載された基準を満たす適格資源からのエネルギーおよび容量に関する電力購入契約(PPA)を締結するものとします。応募者は、提案パッケージの一部として提出された該当するPPAを、提案内容に付加価値を与える範囲で修正することができます。SDG&Eは、プロフォーマPPAの大幅な修正を推奨しません。
募集要項
Respondents must submit at least two (2) bids and may submit up to ten (10) offers per facility to this solicitation by submitting the forms listed below. The failure to provide the listed information may result in the offer being deemed non-conforming and may disqualify the offer from further consideration.
-
RFO (PDF)
必要なフォームと書類
-
オファーフォーム (xlsx) 入札者は、提案書およびその他該当する添付書類をすべて記入する必要があります。プロジェクトごとに1部提出してください。
Note: Respondents must submit more than one pricing option and less than 10 pricing options per project.The Offer Form should be completed in conjunction with the PPA form of contract when provided. In order for a PPA Offer to be considered, it shall include two GHG Compliance Cost options as set forth in the pro-forma CHP RFO PPA or Utility Prescheduled Facility (“UPF”) PPA, as applicable. -
プロジェクト説明フォーム (ドキュメント) – Submit one per project. A written description of the generating facility as well as the following information: (i) Nameplate of each generating unit, heat balance diagrams, thermal host and use, contractual arrangements, and description of all interconnection systems.
-
CEC-2843申請書 – 熱電併給システムの資格認定を申請する申請者の申請書のコピーをCECに提出してください。
-
Electric Interconnection Information – Please provide copies of completed studies (System Impact Study, Phase 1 interconnection study, WDAT, 等々), provide the name of the substation and interconnection voltage applicable to the facility as well as the nearest 230kV substation (if known) in the Offer Form (listed above).
-
借入申込書 (ドキュメント) - Submit one per project. A credit application will be required under all PPAs. Changes to terms and conditions will render the offer non-conforming and disqualify the project from further consideration.
-
サプライヤー多様性情報(文書) - カリフォルニア州公益事業委員会から受け取った認証書類のコピーを提出してください。申請は提案書の提出前に行うことができ、提案書の中で参照することができます。
- CHP プロフォーマ PPA (ドキュメント) OR UPF PPA (ドキュメント)
CHP Pro Forma PPA or UPF PPA include some terms that provide options (e.g. 12 year term). Respondent should provide a redline of the Model PPA that reflects the attributes of their proposed project by selecting the correct options. Terms that do not provide options are non-modifiable. SDG&E discourages extensive modification of the CHO Pro Forma PPA. - RA Confirmation (docx)
For Capacity Only Products (Resource Adequacy) please submit a redline version of the RA Confirmation form.
すべての提案は、締め切り日( RFOスケジュールを参照)の太平洋標準時午後1時までにRFOウェブサイトにアップロードする必要があります。プロジェクト説明フォームとモデルPPAはWordまたはWord互換形式(PDF不可)で提出してください。価格設定フォームはExcelまたはExcel互換形式(PDF不可)で提出してください。相互接続調査およびサイト管理文書の完成版はPDF形式で提出してください。
RFOコミュニケーション
All questions or other communications regarding this RFO should be submitted via e-mail to:
with copies to the Independent Evaluator at:
All questions and answers will be posted on this website anonymously. SDG&E will not accept questions or comments in any other form, except during the pre-bid conference. Respondents are encouraged to check this RFO Website periodically for updates, notices, and postings.
入札前会議
SDG&E will hold one pre-bid conference on March 7, 2012 in San Diego, California and will be available via webinar.
Participation in the pre-bid conference is NOT mandatory in order to submit an offer. Please monitor this website periodically as the venue will be posted as soon as arrangements are finalized. Please limit participation to two representatives per company.
By March 2, 2012 any potential Respondent interested in attending a pre-bid conference should send an email to:
メールには以下の情報を含める必要があります。
-
会社名
-
出席者の氏名、役職、連絡先情報
-
Facility Name & Nameplate Capacity (MW)
RFOのお知らせ
SDG&Eは、スケジュール変更やRFO(入札募集要項)の修正など、入札に関するすべての告知をこのウェブサイトに掲載しますので、定期的にご確認ください。
オファーを送信するには登録が必要です
Any party interested in submitting an offer must register on the RFO Website and upload the offer. To register, Respondents must fill-out and email an RFO Registration Form (available from the RFO Website) to:[メール保護].
SDG&E will process the form and provide the interested party instructions necessary to upload offers. A username/password combination will be issued allowing access to the offer upload link. All offers must be uploaded to the RFO Website no later than 1 PM, Local Prevailing Time, on the CLOSING DATE (see RFO Schedule).
If Respondents encounter technical difficulties with the uploading process, they should provide evidence of such difficulties (e.g. a screen shot of the error message) and email the bid to the RFO inbox by 3:00 PM., Local Prevailing Time, on the Closing Date. If the Respondent encounters technical difficulties with both the uploading process and the RFO inbox, they should provide evidence of such difficulties (e.g. a screen shot of the error message or a “sent email” notice with a time stamp before 3PM. on the Closing Date) and submit USB Thumb Drive or one CD of the bid package to SDG&E and the Independent Evaluator at the addresses below within 3 business days following the Closing Date.
サンディエゴガス&エレクトリックカンパニー
電気・ガス調達部
宛先: 2012 CHP RFO
8315 センチュリーパークコート、CP-21D
カリフォルニア州サンディエゴ 92123-1548
独立評価者
マイケル・カッツ
ヴァン・ホーン・コンサルティング
ブルックデールコート28番地
ラファイエット、カリフォルニア州 94549
RFOスケジュール
本RFOには以下のスケジュールと期限が適用されます。SDG&Eは、いつでも独自の裁量でこのスケジュールを改訂する権利を留保します。応募者は、最新のスケジュールおよびRFOまたは募集プロセスへの変更の可能性について、RFOウェブサイトにアクセスする責任があります。
|
いいえ。 |
Item |
日付 |
|---|---|---|
|
1. |
RFO発行済み |
2012 年 2 月 21 日 |
|
2. |
入札前説明会 |
2012 年 3 月 7 日 |
|
3. |
質問提出期限 質問提出締切日。 Answers to all questions will be posted on the website no later than March 26, 2012 |
2012 年 3 月 21 日 |
|
4. |
登録締切日 Those intending to bid must register to receive a username/password in order to upload electronic offers. |
2012 年 3 月 30 日 |
|
5. |
決算日: Offers must be uploaded to and received by the RFO Website no later than 1:00 PM (太平洋標準時) |
2012 年 4 月 6 日 |
|
6. |
SDG&Eが入札評価プロセスを開始 |
2012 年 4 月 6 日 |
|
7. |
EバインダーまたはCDの提出期限 回答者は、USBメモリまたはCDを1枚SDG&Eに提出してください。 回答者は、IEにUSBメモリ1個またはCD1枚を提出する。 |
2012 年 4 月 13 日 |
|
8. |
最終選考通過通知 SDG&Eが最終選考に残った入札者に通知 |
2012 年 5 月 23 日 |
|
9. |
最終選考に残った入札者の承諾/辞退 最終選考に残った入札者から以下の内容を示す書簡が提出される予定です。
|
+10日 ショートリスト通知後 |
|
10. |
SDG&E社、敗訴した被告らに感謝状を送付 |
+3週間 最終選考に残った入札者が承諾または辞退した後 |
|
11. |
SDG&E commences with PPA Negotiations |
最長24週間* |
|
12. |
PPAに関する助言書をCPUCに提出し、承認を得る。 |
+4週間 電力購入契約(PPA)の交渉と締結後 |
|
|
* 交渉にかかる時間は、施設の建設時期、提案された契約条件、および変更内容によって異なります。 |
|
Q1: Is SDG&E considering Capacity only products?
A: SDG&E will consider Capacity only (Resource Adequacy) products, but these products will be evaluated separately from the Pro-Forma and UPF Offers that have been received. SDG&E has uploaded a Resource Adequacy Confirmation onto the CHP website to allow for these products. The form has been uploaded to the RFO Website.
Q2: For a facility providing a hybrid combination of CHP must take and UPF Capacity, how is the required efficiency for the facility determined.
A: A hybrid offer (ie a CHP resource with limited dispatch capability) will be considered. The facility must comply with the eligibility set forth in the RFO Eligibility requirements. SDG&E will compare the efficiency of the “must take” resource to the efficiency of the settlement defined Double Benchmark resource to determine the GHG Reduction benefit. For the UPF portion (dispatchable portion) of the facility, SDG&E will assess the change in operation (from base load to dispatchable) in order to determine the GHG Reduction benefit. Please submit the hybrid combination as two separate bids and note that both bids are linked.
Q3: The CEC 2843 Application appears to establish eligibility for the AB 1613 feed-in-tariff which is only available to units < 20 MW. Our facility is much larger. Is this truly a requirement, or can we instead provide historical data?
A: If you do not have a copy or are not required to file the CEC 2843 Application, your bid will still be eligible. Please populate the Offer Form with historical data.
Q4: I could not find the link to the RFO Registration Form on the RFO website. Where can it be found?
A: The registration form has been uploaded to the website as of March 14, 2012 (ダウンロードフォーム). SDG&E will follow up with an username/password combination allowing access to the upload link.
Q5: Does the project have to be offered by the Operator or Owner? Can there be no transfer of Title to another company and then sale to SDG&E?
A: As long as SDG&E is entitled to all of the same protections that an owner/operator can offer, SDG&E will consider the marketer offer.
Q6: The Capacity Allocation Factors when applied to the formula is section 3(a) of the PPA Exhibit D yields payments very different than those obtained using SCE and PG&E Factors. Please explain how to determine the Capacity payment using the Capacity Allocation Factors listed in Exhibit D.
A: The steps listed below yield capacity payments in line with those calculated using SCE and PG&E factors.
-
Populate a 4 TOD Period x 12 month matrix with appropriate values from the SDG&E table in the PPA.
-
Create another 4 x 12 matrix with hours per TOD period per month. (We recognize that the number of TOD hours per month varies slightly from year to year.)
-
Multiply the values in step 1 by values in step 2. For example, for the cell corresponding to January On-Peak multiply the factor 0.013237 by 63 hours.
-
Divide each of the 48 results from step 3 by 100. After this step is performed the sum of the factors arranged in a matrix of 4 TOD periods by 12 months is 1.0.
-
Use the results from step 4 in the monthly capacity payment calculations for each TOD period.
Q7: Under the Economic Curtailment participation section, SDG&E can only exercise curtailment of the facility during times with CAISO Market Prices fall below $0/MWh. What if we wish to offer curtailment when the CAISO Market price is something その他 than $0/MWh?
You may do so. SDG&E has updated the Offer Form to allow the Seller to set the Market price (If other than a $0/MWh price) at which SDG&E can curtail generation. If the Seller would like to offer curtailment at any price input “Mkt” into cell C123 of the ‘9. Contract Pricing’ tab.