Calculating the Franchise Fees on Electric Energy Supplied by Others

Instructions to calculate the franchise fees on electric energy supplied by others

Customers Billing On A Non-Time-of-Use Rate

  1. Multiply the total number of kilowatt hours (kWhrs) consumed during the billing period by the percentage of power supplied by The Department of Water Resources (DWR). The result of this calculation represents the number of kWhrs supplied by DWR.
  2. Multiply the result of the calculation from step one above by the 現行価格 for electricity supplied by DWR.  * Please note the current price as of January 1, 2014 is $0.00.
  3. Locate the line item on your billing statement entitled “DWR Bond Charge” and add the amount to the result from step two above.
    • Note: Medical Baseline and CARE customers are not charged the DWR Bond Charge
  4. If you are a customer located within the City of San Diego, multiply the result of step three above by 6.88%. For all other customers not located within the City of San Diego, multiply the result from step three above by 1.1%.

計算例

Here’s an example of a calculation for a residential customer located outside the City of San Diego who used 1000 kWh on their October 2008 bill with a meter read date of 10/21/2008.

Fee Calculation for Customers Billing on a Non-Time-of-Use Rate

ステップ 1

1000

x

23.77%

=

238

           

ステップ 2

238

x

$0.09395 per kWhr paid to DWR

=

$22.36

           

ステップ 3

$22.36

+

$4.77 DWR Bond Charge

=

$27.13

           

ステップ 4

$27.13

x

1.10%

=

$0.30

           

 

$0.30

=

Franchise Fee on Electric Energy Supplied by Others

Customers Billing On A Time-of-Use (TOU) Rate

  1. Multiply the number of kilowatt hours (kWhrs) consumed during each TOU period by the percentage of power supplied by The Department of Water Resources (DWR) in the during each TOU period.
  2. Sum the results from each TOU period. This total represents the number of kWhrs supplied by DWR.
  3. Multiply the result of from step two above by the 現行価格 for electricity supplied by DWR.
  4. Locate the line item on your billing statement entitled “DWR Bond Charge” and add the amount to the result from step three above.
    • Note: Medical Baseline and CARE customers are not charged the DWR Bond Charge.
  5. If you are a customer located within the City of San Diego, multiply the result of step four by 6.88%. For all other customers not located within the City of San Diego, multiply the result from step four above by 1.1%.

計算例

Here’s an example of a calculation for a non-residential customer on a TOU rate schedule located outside the City of San Diego who used 3,280 kWh during on-peak, 15,040 during semi-peak and 16,320 kWh during off-peak on their October 2008 bill with a meter read date of 10/15/2008.

Calculating Fees based on a TOU Rate Schedule

 

ピーク時

3280

x

28.03%

=

919

ステップ 1

Semi-peak

15040

x

30.00%

=

4512

 

閑散時

16320

x

24.37%

=

3977

ステップ 2

Total kWhrs supplied by DWR

=

9408

ステップ 3

トータル

9408

x

$0.09395 per kWhr paid to DWR

=

$883.88

ステップ 4

 

$883.88

+

$165.23 DWR Bond Charge

=

$1,049.11

ステップ 5

 

$1,049.11

x

1.10%

=

$11.54

 

 

$11.54

=

Franchise Fee on Electric Energy Supplied by Others

Pricing History For Electricity Supplied By DWR

発効日

Price per kWhr

2002 年 4 月 1 日

$0.07742

2003 年 1 月 1 日

$0.10301

2003 年 2 月 21 日

$0.10354

2003 年 6 月 30 日

$0.09432

2003 年 9 月 12 日

$0.10114

2004 年 1 月 22 日

$0.08814

2004 年 8 月 31 日

$0.07656

2004 年 12 月 21 日

$0.07816

2005 年 4 月 21 日

$0.07621

2005 年 11 月 15 日

$0.08810

2006 年 1 月 1 日

$0.08142

2007 年 1 月 1 日

$0.05823

2008 年 1 月 1 日

$0.10199

2008 年 5 月 1 日

$0.09395

2009 年 1 月 1 日

$0.11004

2009 年 5 月 1 日

$0.10416

2010 年 1 月 1 日

$0.06112

2011 年 1 月 1 日

$0.04989