- Advice 3281-G, January 2024 Standby Procurement Rate
- Advice 3280-G, Revision of Cross-Over Rate Effective February 10, 2024
- Advice 3278-G, Revision of Gas Procurement Rates Effective February 1, 2024
- Advice 3277-G, January 2024 Buyback Rate
- Advice 3275-G, December 2023 Standby Procurement Rate
- Advice 3274-G, Tariff Modifications for Avoided Cost Calculator Update Memorandum Account (ACCUMA) Per Ordering Paragraph 3 of Decision 23-11-087
- Advice 3273-G, Notice of Self-Correction to Approved SDG&E Advice Letter 3051-G for Quitclaim of a Gas Easement to Accommodate the Junipers Project Pursuant to Public Utilities Code Section 851 and General Order 173
- Advice 3270-G, San Diego Gas & Electric Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Allow Encroachments in an Electric and Gas Transmission Easement for the Nobel Drive Deacceleration Lane Project
- Advice 3269-G, Revision of Cross-Over Rate Effective January 10, 2024
- Advice 3268-G, Revision of Gas Procurement Rates Effective January 1, 2024
- Advice 3267-G, December 2023 Buyback Rate
- Advice 3266-G, Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System) for the Period June 1, 2023, to November 30, 2023
- Advice 3265-G, Joint Advice Letter Documenting Research on Mercury Impacts of Southern California Gas Company, San Diego Gas & Electric Company, Pacific Gas and Electric Company, and Southwest Gas Corporation
- Advice 3263-G,
San Diego Gas & Electric Company’s Update To Balancing Accounts For Statewide Energy Efficiency Programs Pursuant To Decision 23-06-055
- Advice 3261-G, Consolidated Gas Rate Changes Effective January 1, 2024
- Advice 3260-G, November 2023 Standby Procurement Rate
- Advice 3259-G, Update Of Utility Reimbursement Account Fees In Compliance With Resolution M-4870
- Advice 3258-G, Revision of Cross-Over Rate Effective December 10, 2023
- Advice 3256-G, Notification of the Creation of New Affiliates
- Advice 3255-G, Revision of Gas Procurement Rates Effective December 1, 2023
- Advice 3254-G, November 2023 Buyback Rate
- Advice 3253-G, October 2023 Standby Procurement Rate
- Advice 3252-G, San Diego Gas & Electric Company Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Quitclaim a Gas Distribution Easement to Accommodate a Project at 4284 Dwight Street
- Advice 3251-G, Revision of Cross-Over Rate Effective November 10, 2023
- Advice 3250-G, San Diego Gas & Electric Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Allow Encroachments in a Gas Distribution Easement for the Roosevelt Middle School Security Fence Project
- Advice 3249-G, Revision of Gas Procurement Rates Effective November 1, 2023
- Advice 3248-G, October 2023 Buyback Rate
- Advice 3247-G-B, Full Supplement: Annual Regulatory Gas Account Balance Update For Rates Effective January 1, 2024
- Advice 3245-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2024
- Advice 3244-G, Revenue Requirement Implementation Pursuant to Decision (D.) 20-02-045 and D.23-09-002
- Advice 3243-G, September 2023 Standby Procurement Rate
- Advice 3241-G, San Diego Gas & Electric Company Request to Establish a Tariff On-Bill Memorandum Account Pursuant to Ordering Paragraph (OP) 11 of Decision (D.) 23-08-026
- Advice 3239-G, Cost of Capital Mechanism (CCM) Trigger Adjustment Effective January 1, 2024, Pursuant to Decision (D.) 22-12-031
- Advice 3238-G, Revision of Cross-Over Rate Effective October 10, 2023
- Advice 3237-G-A, Supplemental – Annual Filing of Low Carbon Fuel Standard Credit and Revenue Estimates Pursuant to Decision 14-12-083
- Advice 3236-G, Revision of Gas Procurement Rates Effective October 1, 2023
- Advice 3235-G, September 2023 Buyback Rate
- Advice 3234-G, August 2023 Standby Procurement Rate
- Advice 3233-G, Notification to the CPUC of Omissions in Regulatory Filings: Rule VII.H. - Periodic Reporting of Non-tariffed Products and Services and SDG&E’s Annual Report on Affiliate Transactions Pursuant to the Affiliate Transaction Reporting Decision (D.93-02-019)
- Advice 3232-G, Correction to Gas Rate Schedule GS and GT, Submetered Multi-Family and Mobilehome Park Natural Gas Service
- Advice 3230-G, Information Only: Implementation of Emergency Disaster Relief Program in San Diego Gas and Electric Company’s Service Territory for Hurricane Hilary to Institute Residential and Non-Residential Customer Protections Pursuant to Decision (D.) 19-07-015
- Advice 3229-G, Revision of Cross-Over Rate Effective September 10, 2023
- Advice 3228-G, Revision of Gas Procurement Rates Effective September 1, 2023
- Advice 3226-G, San Diego Gas & Electric Company Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Allow Encroachments in a Gas Transmission Easement for the El Camino Real Roadway Improvements Project
- Advice 3225-G, July 2023 Standby Procurement Rate
- Advice 3224-G, San Diego Gas & Electric Modifications to its Infrastructure Investment and Jobs Act Memorandum Accounts (IIJAMA)
- Advice 3223-G, San Diego Gas & Electric Company Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Quitclaim a Distribution Easement to Accommodate the Rady Children’s Hospital – San Diego Project
- Advice 3222-G, Revision of Cross-Over Rate Effective August 10, 2023
- Advice 3220-G, Joint Submittal to Update Number of Eligible Pilot Participants and Modify Pilot Timeline and Evaluation Method for the Small Business Customer Outreach Pilot for Disadvantaged Communities
- Advice 3219-G, Notification of the Creation of New Affiliates
- Advice 3218-G, Revision of Gas Procurement Rates Effective August 1, 2023
- Advice 3217-G, July 2023 Buyback Rate
- Advice 3216-G, Revision Of Medical Baseline Program Application And Recertification Forms
- Advice 3215-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3214-G, Establishment of the General Rate Case Memorandum Account 2024 (GRCMA2024) Pursuant to Decision (D.) 23-05-012
- Advice 3213-G-A, Full Supplemental - Revenue Requirement Implementation Pursuant to Resolution G-3599 (SDG&E’s 2022 Compliance Plan and Ratemaking Forecasts for Its Leak Abatement Program)
- Advice 3212-G, June 2023 Standby Procurement Rate
- Advice 3211-G, Revision of Cross-Over Rate Effective July 10, 2023
- Advice 3210-G, Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System) for the Period December 1, 2022, to May 31, 2023
- Advice 3209-G, Revision of Gas Procurement Rates Effective July 1, 2023
- Advice 3208-G, June 2023 Buyback Rate
- Advice 3207-G, 2023 Affiliate Transactions Compliance Plan
- Advice 3206-G, May 2023 Standby Procurement Rate
- Advice 3204-G, San Diego Gas & Electric Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Allow Encroachments in a Gas Transmission Easement for the Mobley Street Storm Drain Project
- Advice 3202-G, Revision of Cross-Over Rate Effective June 10, 2023
- Advice 3201-G, Concurrent Application System Balancing Account (CASBA)
- Advice 3200-G, Revision of Gas Procurement Rates Effective June 1, 2023
- Advice 3199-G, May 2023 Buyback Rate
- Advice 3198-G, April 2023 Standby Procurement Rate
- Advice 3197-G, Notification of the Creation of New Affiliates
- Advice 3196-G, Request to Modify Solicitation Requirements in D.21-06-015 for the Energy Savings Assistance Program Pilot Plus and Pilot Deep Program Decision: D.21-06-015
- Advice 3195-G, Revision of Cross-Over Rate Effective May 10, 2023
- Advice 3194-G, Information Only: Implementation of Emergency Disaster Relief Program in San Diego Gas and Electric Company’s Service Territory for Winter Storms to Institute Residential and Non-Residential Customer Protections Pursuant to Decision (D.) 19-07-015
- Advice 3193-G, Revision of Gas Procurement Rates Effective May 1, 2023
- Advice 3192-G, April 2023 Buyback Rate
- Advice 3190-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3189-G, March 2023 Standby Procurement Rate
- Advice 3188-G, San Diego Gas & Electric Request to Establish Infrastructure Investment and Jobs Act Memorandum Accounts Pursuant to Resolution E-5254
- Advice 3186-G, True-up of San Diego Gas & Electric Company’s 2022 Unspent and Uncommitted Funds for Assembly Bill 841 School Energy Efficiency Stimulus Program in Compliance with Administrative Law Judge Kao’s Email Ruling of December 17, 2021
- Advice 3185-G, Revision of Cross-Over Rate Effective April 10, 2023
- Advice 3184-G, Pacific Gas and Electric Company, San Diego Gas & Electric Company, Southern California Gas Company and Southern California Edison Company’s Proposed Shared Funding of CATALENA Pursuant to Decision 23-02-002
- Advice 3183-G, Revision Of CARE and FERA Income Levels And Eligibility Forms
- Advice 3181-G, Revision of Gas Procurement Rates Effective April 1, 2023
- Advice 3180-G, March 2023 Buyback Rate
- Advice 3179-G, Notification of the Creation of New Affiliates
- Advice 3178-G, February 2023 Standby Procurement Rate
- Advice 3176-G, Revision of Cross-Over Rate Effective March 10, 2023
- Advice 3175-G, San Diego Gas & Electric Company Submission of Net Electric and Gas Bill Impact Study Using the Tou-Elec Rate Pursuant to Resolution E-5233
- Advice 3174-G, Revision of Gas Procurement Rates Effective March 1, 2023
- Advice 3173-G, February 2023 Buyback Rate
- Advice 3172-G, January 2023 Standby Procurement Rate
- Advice 3171-G, San Diego Gas & Electric Company’s Modifications To Medical Baseline Eligibility Requirements Pursuant To Ordering Paragraph (OP) 25 Of Decision (D.) 02-04-026.
- Advice 3170-G, Modifications to Gas Rule No. 45 Pursuant to Decision No. 22-12-057
- Advice 3169-G, Revision of Cross-Over Rate Effective February 10, 2023
- Advice 3168-G, Revision Of CARE And FERA Program Recertification Application Forms
- Advice 3167-G, January 2023 Buyback Rate
- Advice 3166-G, Revision of Gas Procurement Rates Effective February 1, 2023
- Advice 3165-G, San Diego Gas & Electric Company Request to Revise Impacted Tariffs to Accelerate Distribution of the April 2023 Electric and Gas Climate Credits Pursuant to Decision 23-02-014
- Advice 3164-G, December 2022 Standby Procurement Rate
- Advice 3163-G, Transportation Rate Update Effective March 1, 2023, Pursuant to SoCalGas’ Core Fixed Cost Account True-Up Mechanism
- Advice 3161-G, Information Only: Implementation of Emergency Disaster Relief Program in San Diego Gas and Electric Company’s Service Territory for Winter Storms to Institute Residential and Non-Residential Customer Protections Pursuant to Decision (D.) 19-07-015
- Advice 3160-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3159-G, Updated Cost of Preferred Equity in Accordance with Decision (D.) 22-12-031, Test Year 2023 Cost of Capital Proceeding For SDG&E
- Advice 3158-G, Update to the Cost of Capital Mechanism (CCM) to Reflect Decision (D.) 22-12-031
- Advice 3157-G, Informational Only: San Diego Gas and Electric Notice to Decommission Kearny Compressed Natural Gas Station.
- Advice 3155-G, Notification of the Creation of New Affiliates
- Advice 3154-G, Revision of Cross-Over Rate Effective January 10, 2023
- Advice 3152-G, Revision of Gas Procurement Rates Effective January 1, 2023
- Advice 3151-G, December 2022 Gas Buyback Rate
- Advice 3149-G, Consolidated Gas Rate Changes Effective January 1, 2023
- Advice 3148-G, Joint Advice Letter Documenting Research on Mercury Impacts of Southern California Gas Company, San Diego Gas & Electric Company, Pacific Gas and Electric Company, and Southwest Gas Corporation
- Advice 3147-G, Update Of Utility Reimbursement Account Fees In Compliance With Resolution M-4866
- Advice 3146-G, Notification of the Creation of New Affiliates
- Advice 3145-G, Revision of Cross-Over Rate Effective December 10, 2022
- Advice 3144-G, San Diego Gas & Electric Company’s Energy Savings Assistance Third-Party Solicitation Advice Letter for the Southern Multi-Family Whole Building Program and Third-Party Contract
- Advice 3143-G, Revision of Gas Procurement Rates Effective December 1, 2022
- Advice 3142-G, November 2022 Buyback Rate
- Advice 3140-G, San Diego Gas & Electric Request for Authorization Pursuant to Public Utilities Code Section 851 and General Order 173 to Allow Encroachments in Two Gas Easements for the Junipers Project
- Advice 3138-G, Revision of Cross-Over Rate Effective November 10, 2022
- Advice 3137-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2023
- Advice 3136-G, Revision of Gas Procurement Rates Effective November 1, 2022
- Advice 3135-G, October 2022 Buyback Rate
- Advice 3134-G, SDG&E Advice Letter Pursuant to Decision 21-06-015 for the Energy Savings Assistance Program Pilot Plus and Pilot Deep 2.0 Implementation Plan
- Advice 3132-G, September 2022 Standby Procurement Rate
- Advice 3131-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3130-G, San Diego Gas & Electric Company Revision of Gas Rule No. 15 and No. 16 Pursuant to Ordering Paragraph 4 of Decision 22-09-026
- Advice 3129-G-A, Partial Supplemental - Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2023
- Advice 3129-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2023
- Advice 3127-G, San Diego Gas & Electric Tariff Revisions to Incorporate Residential Baseline Season Implementation per Decision 20-02-045
- Advice 3126-G, Revision of Cross-Over Rate Effective October 10, 2022
- Advice 3125-G, Revision of Gas Procurement Rates Effective October 1, 2022
- Advice 3124-G, September 2022 Buyback Rate
- Advice 3123-G, Low-Carbon Fuel Standard Program Annual Credit And Revenue Estimates (2023)
- Advice 3122-G, August 2022 Standby Procurement Rate
- Advice 3121-G, San Diego Gas & Electric’s Clean-Up Submittal of Electric & Gas Tariffs
- Advice 3119-G, Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Rule 15
- Advice 3118-G, Revision of Gas Procurement Rates Effective September 1, 2022
- Advice 3116-G, August 2022 Buyback Rate
- Advice 3115-G, San Diego Gas & Electric’s Closure of Branch Offices as Adopted in the Settlement Agreement for A.21-11-017.
- Advice 3114-G, July 2022 Standby Procurement Rate
- Advice 3113-G, Adjustment to Revenue Requirement in Accordance with Internal Revenue Service Private Letter Ruling
- Advice 3112-G, San Diego Gas & Electric Revisions To Gas Rule No. 2 & 18 Per Resolution G-3587
- Advice 3110-G, Notification of the Creation of New Affiliates
- Advice 3109-G, Revision of Cross-Over Rate Effective August 10, 2022
- Advice 3108-G, Revision of Gas Procurement Rates Effective August 1, 2022
- Advice 3107-G, July 2022 Buyback Rate
- Advice 3106-G, June 2022 Standby Procurement Rate
- Advice 3104-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2.
- Advice 3103-G, Revision of Cross-Over Rate Effective July 10, 2022
- Advice 3102-G, 2022 Affiliate Transactions Compliance Plan
- Advice 3101-G, Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System) for the Period December 1, 2021, to May 31, 2022
- Advice 3100-G, Revision of Gas Procurement Rates Effective July 1, 2022
- Advice 3099-G, June 2022 Buyback Rate
- Advice 3098-G, Standard Biomethane Procurement Methodology Pursuant to Decision 22-02-025
- Advice 3097-G, May 2022 Standby Procurement Rate
- Advice 3096-G, Triennial Cost Allocation Proceeding (TCAP) Senate Bill 711 Residential Baseline Season Implementation – Decision (D.) 20-02-045
- Advice 3095-G, Notification of the Creation of New Affiliates
- Advice 3094-G, San Diego Gas & Electric Company Request of Authorization Under Public Utilities Code Section 851 and General Order 173 to Allow Encroachment Within a Gas Transmission Easement for the Olive Avenue Residential Project.
- Advice 3093-G, Revision of Cross-Over Rate Effective June 10, 2022
- Advice 3092-G, Revision of Gas Procurement Rates Effective June 1, 2022
- Advice 3091-G, May 2022 Buyback Rate
- Advice 3090-G, Revision to Operational Flow Order section in SDG&E’s Gas Rule No. 30
- Advice 3089-G, April 2022 Standby Procurement Rate
- Advice 3088-G, Renewable Gas Procurement Plan Template pursuant to Decision 22-02-025.
- Advice 3086-G, San Diego Gas & Electric Company Request To Establish A New Subaccount Pursuant To Ordering Paragraph (Op) 9 Of Decision (D.) 22-04-036
- Advice 3084-G, Revision of Cross-Over Rate Effective May 10, 2022
- Advice 3083-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 3082-G, Revision of Gas Procurement Rates Effective May 1, 2022
- Advice 3081-G, April 2022 Buyback Rate
- Advice 3080-G, March 2022 Standby Procurement Rate
- Advice 3079-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large
Commercial and Industrial Customers Participating in the COVID19
Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering
Paragraph 2
- Advice 3078-G, AB 841 Unspent/Uncommitted Funds in Compliance with Ordering Paragraph 3 of Decision 21-01-004
- Advice 3077-G, Revision of Cross-Over Rate Effective April 10, 2022
- Advice 3076-G, Revision of Gas Procurement Rates Effective April 1, 2022
- Advice 3075-G, March 2022 Buyback Rate
- Advice 3074-G, February 2022 Standby Procurement Rate
- Advice 3073-G, Biomethane Incentive Reservation Form Update Pursuant to Decision 22-02-025
- Advice 3072-G, Establishment of the Biomethane Procurement and Pilot Costs Balancing Account (BPPCBA) in Compliance with Decision (D.) 22-02-025
- Advice 3071-G-B, Supplement - 2023 and 2024 Ratemaking Forecasts for Natural Gas Leak Abatement Memorandum Account, Balancing Account and Subaccount (Nglapma, Nglapba and Nglap) in the New Environmental Regulation Balancing Account (Nerba)
- Advice 3070-G, Revision of Cross-Over Rate Effective March 10, 2022
- Advice 3069-G, Revision of Gas Procurement Rates Effective March 1, 2022
- Advice 3068-G, February 2022 Buyback Rate
- Advice 3067-G, San Diego Gas & Electric Company’s Updated Greenhouse Gas Balancing Account (GHGBA) and Greenhouse Gas California Climate Credit (G-CCC Pursuant to Decision (D.) 22-02-025
- Advice 3066-G, Revisions to Schedule G-NGV to Implement the Low-Carbon Fuel Standard Program Annual Credit
- Advice 3065-G, January 2022 Standby Procurement Rate
- Advice 3064-G, Revision of Cross-Over Rate Effective Februray 10, 2022
- Advice 3063-G-A, Supplement To Advice 3952-E/3063-G, San Diego Gas & Electric Company Submission Of Net Electric And Gas Bill Impact Study Pursuant To Decision (D.)21-11-002
- Advice 3063-G, San Diego Gas & Electric Submission Of Net Electric And Gas Bill Impact Study Pursuant To Decision (D.)21-11-002
- Advice 3062-G, SoCalGas, SDG&E, PG&E, and Southwest Gas Advice Letter Documenting Research on Mercury Impacts
- Advice 3061-G, Revision of Gas Procurement Rates Effective February 1, 2022
- Advice 3060-G, January 2022 Buyback Rate
- Advice 3059-G-A, PARTIAL SUPPLEMENTAL – San Diego Gas & Electric Company’s Energy Efficiency (EE) Third-Party Solicitation Advice Letter for Statewide Plug-Load and Appliance Program Third-Party Contract
- Advice 3059-G, San Diego Gas & Electric Company’s Energy Efficiency (EE) Third-party Solicitation Advice Letter for Statewide Plug-Load and Appliance Program Third- Party Contract
- Advice 3058-G, Joint Implementation Plan For Percentage Of Income Payment Plan (PIPP) Pilot Program And Establishment Of PIPP Regulatory Accounts Pursuant To Decision 21-10-012
- Advice 3057-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3056-G, December 2021 Standby Procurement Rate
- Advice 3055-G, Revision of Cross-Over Rate Effective January 10, 2022
- Advice 3054-G, Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System) for the Period June 1, 2021, to November 30, 2021
- Advice 3053-G, Revision of Gas Procurement Rates Effective January 1, 2022
- Advice 3052-G, December 2021 Buyback Rate
- Advice 3051-G, Request for Authorization for San Diego Gas & Electric to Quitclaim a Gas Easement to Carmel Land, LLC, Pursuant to Public Utilities Code Section 851 and General Order 173
- Advice 3050-G, Modifications to Gas Rule 45 to Provide Lower and Upper Action Level Specifications for Ammonia, Mercury, and Siloxanes Pursuant to Decision 20-12-031
- Advice 3049-G, Establishment Of Cost Of Capital Memorandum Account (CCMA) Pursuant To Decision 21-12-029
- Advice 3048-G, Modifications to Residential Disconnections Protections Memorandum Account to Track Preliminary Percentage of Income Payment Plan Pilot Costs
- Advice 3047-G, November 2021 Standby Procurement Rate
- Advice 3046-G, Consolidated Gas Rate Changes Effective January 1, 2022
- Advice 3045-G, Revision of Cross-Over Rate Effective December 10, 2021
- Advice 3044-G, Revision of Gas Procurement Rates Effective December 1, 2021
- Advice 3043-G, November 2021 Buyback Rate
- Advice 3042-G, Triennial Cost Allocation Proceeding (TCAP) Implementation - Decision (D.) 21-07-019
- Advice 3041-G, Notification of the Creation of New Affiliates
- Advice 3040-G, San Diego Gas & Electric Company Request to Initiate TSOBA Cost Recovery in Gas and Electric Rates
- Advice 3039-G, San Diego Gas & Electric Company Request to Initiate CISBA Cost Recovery in Gas and Electric Rates
- Advice 3038-G, October 2021 Standby Procurement Rate
- Advice 3037-G, San Diego Gas & Electric Advice Letter Pursuant To Decision 21-06-015 For The Energy Savings Assistance Program Pilot Plus And Pilot Deep Implementation Plan
- Advice 3036-G, Revision of Cross-Over Rate Effective November 10, 2021
- Advice 3035-G-A, Supplemental - San Diego Gas & Electric Company’s 2022-2023 Biennial Energy Efficiency Program And Portfolio Budget Request
- Advice 3035-G, San Diego Gas & Electric Company’s 2022-2023 Energy Efficiency Program And Portfolio Budget Request
- Advice 3034-G, SDG&E’s Revenue Requirement Effective January 1, 2022 in Compliance Decision 21-05-003 and Uncollectible Expense Rate Update for Post-Test Years 2022 in Compliance with D.19-09-051
- Advice 3033-G-A, Partial Supplement to Joint Submittal Regarding Small Business Customer Outreach Pilot for Disadvantaged Communities
- Advice 3033-G, Joint Utility Advice Letter - Small Business Customer Outreach Pilot for Disadvantaged Communities
- Advice 3032-G, Revision of Gas Procurement Rates Effective November 1, 2021
- Advice 3031-G, October 2021 Buyback Rate
- Advice 3030-G, Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Clean Energy Workshop Plan
- Advice 3029-G, September 2021 Standby Procurement Rate
- Advice 3028-G, San Diego Gas & Electric Requests To Deviate From Go58a-13, Gas Rule 18, And Update Gas Rule 2
- Advice 3027-G-A, Full Supplemental - Update Of Public Purpose Program Gas Surcharge Rates Effective January 1, 2022
- Advice 3026-G, Update Of Public Purpose Program Gas Surcharge Rates Effective November 1, 2021 Pursuant To AB 841
- Advice 3025-E, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 3024-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2022
- Advice 3023-G, Revision of Cross-Over Rate Effective October 10, 2021
- Advice 3022-G, Joint IOU Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company’s Investor-Owned Utility Financing for Clean Energy Efficiency Financing Programs through June 30, 2027
- Advice 3021-G-A, jOINT Supplement to Advice Letters 4601-E, 3860-E/3021-G, 5876-G, and 4501-G/6346-E for the Online Data Management and Visualization Dashboard Plan Pursuant to Decision 21-06-015
- Advice 3021-G, Joint Investor-Owned Utilities Advice Letter Pursuant to Decision 21-06-015 for the Online Data Management and Visualization Dashboard Plan
- Advice 3020-G, Modifications To Mobilehome Park Utility Conversion Program Agreement Form 189-1000 Pursuant To Decision 21-08-025
- Advice 3019-G, Revision of Gas Procurement Rates Effective October 1, 2021
- Advice 3018-G, September 2021 Buyback Rate
- Advice 3017-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2022)
- Advice 3016-G, San Diego Gas & Electric Request for Approval of Budget and Funding Recovery for the California Hub for Energy Efficiency Financing (CHEEF) Programs
- Advice 3015-G, August 2021 Standby Procurement Rate
- Advice 3014-G, San Diego Gas & Electric’s Removal of 2020 Certain Revenue Requirements Pursuant to Advice Letter No. 2909-G Implementing Decision 20-08-034
- Advice 3013-G, Revision of Cross-Over Rate Effective September 10, 2021
- Advice 3012-G, Joint IOU Advice Letter Pursuant To Decision 21-06-015 For The Energy Savings Assistance (ESA) Program Design And Delivery Of The Measure Treatment Tiers For Program Years 2022-2026
- Advice 3010-G-B, Supplement - Joint Community Based Organization (CBO) Reporting
Template of SoCalGas, SDG&E, SCE, and PG&E Pursuant to Decision
(D.) 21-06-036 Ordering Paragraph (OP) 8
- Advice 3009-G, Revision of Gas Procurement Rates Effective September 1, 2021
- Advice 3008-G, August 2021 Buyback Rate
- Advice 3007-G, July 2021 Standby Procurement Rate
- Advice 3004-G, San Diego Gas & Electric Company Updated Energy Savings Assistance (Esa) Multifamily Common Area Measure Budgets For Program Years 2021-2022 In Compliance With Ordering Paragraph 148 Of Decision 21-06-015
- Advice 3003-G, Revision of Gas Procurement Rates Effective August 1, 2021
- Advice 3002-G, July 2021 Buyback Rate
- Advice 3001-G, Revisions to Gas Rule No. 30 to Accommodate Any California Producer That Has Completed Building its Interconnect for Delivery into Either Northern Zone, Southern Zone, or Wheeler Ridge Zone
- Advice 3000-G, Basic Ordering Agreements Between San Diego Gas & Electric and the United States Government
- Advice 2999-G, June 2021 Standby Procurement Rate
- Advice 2998-G, Information Only: San Diego Gas & Electric Reporting for Medium and Large Commercial and Industrial Customers Participating in the COVID-19 Disconnection Moratorium Pursuant to Decision 21-04-015 Ordering Paragraph 2
- Advice 2997-G, Implementation of Revenue Requirement Adjustments in Accordance with Decision 21-05-003
- Advice 2996-G, Revision of Cross-Over Rate Effective July 10, 2021
- Advice 2995-G, 2021 Affiliate Transactions Compliance Plan
- Advice 2994-G, Clean-Up to Mobilehome Park Utility Conversion Program Agreement Form 189-1000
- Advice 2993-G, Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System) for the Period December 1, 2020 to May 31, 2021
- Advice 2992-G, Revision of Gas Procurement Rates Effective July 1, 2021
- Advice 2991-G, June 2021 Buyback Rate
- Advice 2990-G, May 2021 Standby Procurement Rate
- Advice 2989-G, Notification of the Creation of New Affiliates
- Advice 2988-G, Modifications To San Diego Gas And Electric’s Electric And Gas California Consumer Privacy Act Memorandum Accounts (CCPAMA) In Compliance With Decision 19- 09-026
- Advice 2987-G, San Diego Gas & Electric’s Intent to Not Implement a Renewable Natural Gas Tariff Pursuant to Decision 20-12-022
- Advice 2986-G, Revision of Cross-Over Rate Effective June 10, 2021
- Advice 2985-G, Modifications to Mobilehome Park Utility Conversion Program Application
- Advice 2984-G, Revision of Gas Procurement Rates Effective June 1, 2021
- Advice 2983-G, May 2021 Buyback Rate
- Advice 2982-G, SDG&E Balance Transfers of the COVID-19 Pandemic Protections Memorandum Accounts (CPPMA) into the Residential Uncollectible Balancing Accounts (RUBA)in Compliance with Decision (D.) 20-06-003
- Advice 2980-G, April 2021 Standby Procurement Rate
- Advice 2979-G, Notification of the Creation of New Affiliates
- Advice 2978-G-A, Supplemental: San Diego Gas & Electric Establishment Of Medium-Large Commercial And Industrial Covid-19 Disconnection Memorandum Accounts
- Advice 2977-G, Revision of Cross-Over Rate Effective May 10, 2021
- Advice 2975-G, Joint IOU: Revised Low Carbon Fuel Standard Credits Sales Plans for Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company
- Advice 2974-G, Revision of Gas Procurement Rates Effective May 1, 2021
- Advice 2973-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2972-G, April 2021 Buyback Rate
- Advice 2971-G, March 2021 Standby Procurement Rate
- Advice 2969-G, Revision of the School Energy Efficiency Stimulus Program Balancing Account (SEESPBA) Preliminary Statements
- Advice 2968-G, Revision of Cross-Over Rate Effective April 10, 2021
- Advice 2967-G-A, Supplemental Filing Establishing The Residential And Small Business Customer Transition Plan Pursuant To Resolution M-4849
- Advice 2967-G, Filing Establishing The Residential And Small Business Customer Transition Plan Pursuant To Resolution M-4849
- Advice 2966-G, Revision of Gas Core Procurement Rates Effective April 1, 2021
- Advice 2965-G, March 2021 Buyback Rate
- Advice 2964-G, February 2021 Standby Procurement Rate
- Advice 2963-G, Contract Between San Diego Gas And Electric And The United States Government For Infrastructure Improvement Project Management
- Advice 2962-G, Modifications to Rule 45 to Provide Lower and Upper Action Level Specifications Pursuant to Decision 20-12-031
- Advice 2961-G, Summary of Customer Protections Offered as part of the Emergency Disaster Relief Program for COVID-19, Pursuant to D.19-07-015, OP 6
- Advice 2960-G-B, Second Supplemental: Proposed Methodology for Estimating Greenhouse Gas Emissions Reductions for Certain Biomethane Projects Eligible for Incentives
- Advice 2959-G, Compliance with Resolution E-5108 – Modifications to SDG&E Energy Savings and Performance Incentive Advice Letter 3598-E/2898-G
- Advice 2958-G, Revision of Cross-Over Rate Effective March 10, 2021
- Advice 2957-G, Revision of Gas Core Procurement Rates Effective March 1, 2021
- Advice 2956-G, February 2021 Buyback Rate
- Advice 2955-G, January 2021 Standby Procurement Rate
- Advice 2954-G, Extension of SDG&E’s Emergency Disaster Relief Program for COVID-19 to June 30, 2021 Pursuant to Resolution M-4849
- Advice 2953-G, San Diego Gas & Electric Modifications to on Bill Repayment (OBR) Tariffs
- Advice 2952-G, Revision of Cross-Over Rate Effective February 10, 2021
- Advice 2951-G, Modifications to Electric and Gas Forms Used to Reduce Residential Customer Disconnections in Compliance with D.20-06-003
- Advice 2950-G, Establishment of the School Energy Efficiency Stimulus Program Balancing Account (SEESPBA) in Compliance with Decision (D.) 21-01-004
- Advice 2949-G, Joint Filing: Tier 1 Advice Letter to Fund the School Energy Efficiency Stimulus Program in Compliance with Decision 21-01-004
- Advice 2948-G, Revision of Gas Core Procurement Rates Effective February 1, 2021
- Advice 2947-G, January Buyback Rate
- Advice 2946-G, Correction of SDG&E Schedule of Rates, Natural Gas Service for Core Commercial Customers, GN-3/GTC
- Advice 2945-G, December 2020 Standby Procurement Rate
- Advice 2944-G, Establishment of Standard Renewable Gas Interconnection Agreements and Revisions to Rule No. 45 in Compliance with Decision (D.) 20-12-031
- Advice 2943-G, Modification Of Greenhouse Gas Balancing Account And Biomethane Cost Incentive Program Balancing Account Pursuant To Decision (D.) 20-12-031
- Advice 2942-G, Revision of Cross-Over Rate Effective January 10, 2021
- Advice 2941-G, Joint Submittal – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System)
- Advice 2940-G, Revision of Gas Core Procurement Rates Effective January 1, 2021
- Advice 2939-G, December Buyback Rate
- Advice 2938-G, Consolidated Gas Rate Changes Effective January 1, 2021
- Advice 2937-G, November 2020 Standby Procurement Rate
- Advice 2936-G, Modifications to Rule No. 30 to Change Timings for Intraday 4 (Cycle 6), Scheduled Quantity Trading, and Daily Deliveries Trading Pursuant to Decision (D.) 20-02-045
- Advice 2935-G, Notification of the Creation of New Affiliates
- Advice 2934-G, Revision of Cross-Over Rate Effective December 10, 2020
- Advice 2933-G, Request for Authorization to Quitclaim Easements to Sudberry Development Inc., Pursuant to Public Utilities Code Section 851 and General Order 173
- Advice 2932-G, Revision of Gas Core Procurement Rates Effective December 1, 2020
- Advice 2931-G, November Buyback Rate
- Advice 2930-G, October 2020 Standby Procurement Rate
- Advice 2929-G, Request to Revise Electric and Gas Rule 15 and 16 Pursuant to Assembly Bill 1026 and Section 783 of The California Public Utilities Code
- Advice 2927-G, Revision of Cross-Over Rate Effective November 10, 2020
- Advice 2926-G, SDG&E’s Revenue Requirement Effective January 1, 2021 in Compliance with the 2019 General Rate Case Decision 19-09-051
- Advice 2925-G, Revision of Gas Core Procurement Rates Effective November 1, 2020
- Advice 2924-G, October Buyback Rate
- Advice 2923-G, Update of the Public Purpose Program Gas Surcharge Rates Effective January 1, 2021
- Advice 2922-G, Request for Approval to Recover Costs for Additional Liability Insurance Coverage in SDG&E’s Liability Insurance Premium Balancing Account, as Authorized in D.19-09-051
- Advice 2921-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2021
- Advice 2919-G, Notification of the Creation of New Affiliates
- Advice 2918-G, San Diego Gas & Electric Company's Statewide Marketing, Education and Outreach 2021 Budget
- Advice 2917-G, Revision of Cross-Over Rate Effective October 10, 2020
- Advice 2915-G, Revision of Gas Core Procurement Rates Effective October 1, 2020
- Advice 2914-G, September Buyback Rate
- Advice 2913-G-A, Supplemental - Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2021)
- Advice 2912-G-B, Partial Supplemental: Establishment of the Electric and Gas Residential Uncollectible Balancing Account (RUBA) in Compliance with Decision 20-06-003
- Advice 2912-G-A, Partial Supplemental: Establishment of the Electric and Gas Residential Uncollectible Balancing Account (RUBA) in Compliance with Decision 20-06-003
- Advice 2912-G, Establishment of the Electric and Gas Residential Uncollectible Balancing Accounts (RUBA) in Compliance with Decision 20-06-003
- Advice 2911-G, Joint Tier 1 Advice Letter Detailing the eTRM Phase 1 and Phase 2 Software and Web Administration Budgets and Contract in Compliance with Resolution E-5082
- Advice 2910-G, Establishment of Rule No. 45, Standard Renewable Gas Interconnection Tariff in Compliance with Decision (D.) 20-08-035
- Advice 2909-G, Revenue Requirement Implementation October 2020
- Advice 2908-G, August 2020 Standby Procurement Rate
- Advice 2907-G, Establishment of the Climate Adaptation Vulnerability Assessment Memorandum Account (CAVAMA) Pursuant to Decision 20-08-046
- Advice 2906-G, Establishment of the Electric and Gas Residential Disconnect Protections Memorandum Accounts (RDPMA) in Compliance with Decision 20-06-003
- Advice 2905-G, San Diego Gas & Electric Company’s Bridge Funding for the Energy Savings Assistance Program for January Through June 2021 Pursuant to Decision 20-08-033
- Advice 2904-G, Implementation of Emergency Customer Protections for Customers Impacted by the Valley Fire in Compliance with Decision (D.)19-07-015
- Advice 2903-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4841
- Advice 2902-G, Implementation of San Diego Gas & Electric Company’s Arrearage Management Payment (AMP) Plan in Compliance with D.20-06-003
- Advice 2901-G, Revision of Cross-Over Rate Effective September 10, 2020
- Advice 2900-G, Modification of the Port Energy Management Plan Balancing Account (PEMPBA)
- Advice 2899-G, Modification of Core Fixed Cost Account and Integrated Transmission Balancing Account Pursuant to Decision (D.) 20-08-044 – Triennial Cost Allocation Proceeding (TCAP)
- Advice 2898-G, Request Of San Diego Gas & Electric For Its 2018 And 2019 Energy Efficiency Savings Incentives (ESPI) in Compliance With Decision 13-09-023
- Advice 2897-E-A, Supplemental: San Diego Gas & Electric Company’s 2021 Annual Energy Efficiency Program and Portfolio Budget Request
- Advice 2896-G, Revision of Gas Core Procurement Rates Effective September 1, 2020
- Advice 2895-G, August Buyback Rate
- Advice 2894-G, Modification to Rule 30 to Implement Scheduled Quantity Trading Tariff Changes Pursuant to Decision (D.) 19-08-002
- Advice 2892-G, July 2020 Standby Procurement Rate
- Advice 2891-G, Notification of the Creation of New Affiliates
- Advice 2890-G, Update on San Diego Gas & Electric Company’s Medical Baseline Program Adopting Rules and Policy Changes to Reduce Residential Customer Disconnections in Compliance with D.20-06-003
- Advice 2889-G, Revision of Cross-Over Rate Effective August 10, 2020
- Advice 2888-G, Joint Filing - 2019 Energy Efficiency Incentive Award Earnings Rates and Award Caps
- Advice 2887-G, Revision of Gas Core Procurement Rates Effective August 1, 2020
- Advice 2886-G, July 2020 Buyback Rate
- Advice 2885-G, June 2020 Standby Procurement Rate
- Advice 2884-G-A, Supplemental - Modifications to Electric and Gas Schedules Adopting Rules and Policy Changes to Reduce Residential Customer Disconnections in Compliance with D. 20-06-003
- Advice 2883-G, Notification of the Creation of New Affiliates
- Advice 2882-G, Revision of Cross-Over Rate Effective July 10, 2020
- Advice 2881-G, Revision of Gas Core Procurement Rates Effective July 1, 2020
- Advice 2880-G, June 2020 Buyback Rate
- Advice 2879-G-A, Supplemental: Joint Tier 1 Advice Letter Proposing a Reporting Template for Energy Savings Assistance (ESA) Prime Contractors in Compliance with Resolution E-5074
- Advice 2878-G, Joint IOU Submittal - Establishment of the Post Pandemic Return to Service (PPRS) Credit
- Advice 2877-G, Joint Filing - Information-Only – Biannual Report on Cost Impacts Resulting from Decision (D.) 19-08-002 (Core Balancing / Advanced Meter Data Aggregation System)
- Advice 2876-G, 2020 Affiliate Transactions Compliance Plan
- Advice 2874-G, May 2020 Standby Procurement Rate
- Advice 2873-G, Revision of Cross-Over Rate Effective June 10, 2020
- Advice 2872-G-A, Supplemental Modification of Rule 44, Mobilehome Park Utility Conversion Program and other Related Tariffs in Compliance with Decision 20-04-004
- Advice 2871-G, Revision of Gas Core Procurement Rates Effective June 1, 2020
- Advice 2870-G, May 2020 Buyback Rate
- Advice 2869-G, Modification of Core Fixed Cost Account and Integrated Transmission Balancing Account - Triennial Cost Allocation Proceeding (TCAP)
- Advice 2868-G, April 2020 Standby Procurement Rate
- Advice 2867-G, Updated Greenhouse Gas Balancing Account Pursuant to Decision 20-03-027
- Advice 2866-G, Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Rule 15
- Advice 2865-G, Revision Cross-Over Rate Effective May 10, 2020
- Advice 2864-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2863-G, Revision of Gas Core Procurement Rates Effective May 1, 2020
- Advice 2862-G, April 2020 Buyback Rate
- Advice 2861-G, March 2020 Standby Procurement Rate
- Advice 2860-G, Update to the Cost of Capital Mechanism (CCM) to Reflect Decision (D.) 19-12-056
- Advice 2859-G, Revision of Cross-Over Rate Effective April 10, 2020
- Advice 2858-G, Revision of Gas Core Procurement Rates Effective April 1, 2020
- Advice 2857-G, March 2020 Buyback Rate
- Advice 2856-G-A, Partial Supplement: Triennial Cost Allocation Proceeding (TCAP) Implementation – Decision (D.) 20-02-045
- Advice 2856-G, Triennial Cost Allocation Proceeding (TCAP) Implementation – Decision (D.) 20-02-045
- Advice 2855-G, February 2020 Standby Procurement Rate
- Advice 2854-G-D, PARTIAL SUPPLEMENT -- IMPLEMENTATION OF EMERGENCY DISASTER RELIEF PROGRAM FOR COVID-19 PURSUANT TO RESOLUTION M-4842
- Advice 2854-G-C, Full Supplement -- Implementation of Emergency Disaster Relief Program for COVID-19 Pursuant to Resolution M-4842
- Advice 2853-G, Compliance Submittal Related to Decision D. 20-01-021 (Self Generation Incentive Plan), D.18-03-017 (Greenhouse Gas Program Cost), and Pipeline Safety Enhancement Plan Cost Corrections
- Advice 2852-G-C, Supplement: 2021 and 2022 Ratemaking Forecasts for Natural Gas Leak Abatement Program Memorandum Account, Balancing Account and Subaccount (NGLAPMA, NGLAPBA & NGLAP) in the New Environmental Regulation Balancing Account (NERBA)
- Advice 2851-G, Revision of Cross-Over Rate Effective March 10, 2020
- Advice 2850-G, Revision of Gas Core Procurement Rates Effective March 1, 2020
- Advice 2849-G, February 2020 Buyback Rate
- Advice 2848-G, Advanced Meter Infrastructure Data Aggregation Tariff Changes Pursuant to Decision (D.) 19-08-002
- Advice 2847-G, Revision of Cross-Over Rate Effective September 10, 2019
- Advice 2846-G, January 2020 Standby Procurement Rate
- Advice 2845-G, Clean-Up Submittal to Revise Electric & Gas Tariff Schedules and Rules
- Advice 2844-G, Update: Utility Low-Carbon Fuel Standard (LCFS) Credit Revenue Return Plan
- Advice 2843-G, Updated Greenhouse Gas Proceeds, 2020 California Climate Credit, and Greenhouse Gas Balancing Account Pursuant to Resolution G-3565
- Advice 2842-G, Revision of Cross-Over Rate Effective February 10, 2020
- Advice 2841-G, Establishment of the Port Energy Management Plan Balancing Account (PEMPBA) in Compliance with Decision (“D.”) 19-12-022
- Advice 2840-G, Revision of Gas Core Procurement Rates Effective February 1, 2020
- Advice 2839-G, January 2020 Buyback Rate
- Advice 2838-G, Information Only – San Diego Gas & Electric Company Gas Franchise Fee & Uncollectibles (FF&U) Factor Effective January 1, 2020
- Advice 2837-G, December 2019 Standby Procurement Rate
- Advice 2836-G, Updated Cost of Preferred Equity in Accordance with Decision 19-12-056, Test Year 2020 Cost of Capital Proceeding for SDG&E
- Advice 2835-G, San Diego Gas & Electric Statewide Marketing, Education and Outreach 2020 Budget
- Advice 2834-G, San Diego Gas & Electric Statewide Marketing, Education and Outreach 2019 Budget
- Advice 2833-G, Revision of Cross-Over Rate Effective January 10, 2020
- Advice 2832-G, Revision of Gas Core Procurement Rates Effective January 1, 2020
- Advice 2831-G, December 2019 Buyback Rate
- Advice 2830-G-A, Partial Supplemental - Consolidated Gas Rate Changes Effective January 1, 2020
- Advice 2830-G, Consolidated Gas Rate Changes Effective January 1, 2020
- Advice 2829-G, November 2019 Standby Procurement Rate
- Advice 2828-G, Joint Submittal - SCE, SDG&E, SoCalGas, and PG&E Request to use Unspent Energy Savings Assistance Funds and California Alternate Rates for Energy Funds to Initiate the 2022 Low Income Needs Assessment in 2020
- Advice 2827-G, Joint submittal -- Biomethane Incentive Reservation Application Form
- Advice 2826-G-A, Full Supplemental -- Revisions to the Medical Baseline Program Requirements Pursuant to Senate Bill 1338
- Advice 2825-G, Revision of Cross-Over Rate Effective December 10, 2019
- Advice 2824-G, Revision of the Core Procurement Rate Effective December 1, 2019
- Advice 2823-G, November 2019 Buyback Rate
- Advice 2822-G, October 2019 Standby Procurement Rate
- Advice 2821-G, Establishment, Modification and Elimination of Regulatory Accounts Pursuant to Decision 19-09-051
- Advice 2820-G, Modifications to the Electric and Gas Tax Memorandum Account (TMA) Pursuant to Decision 19-09-051
- Advice 2819-G, Revision of Cross-Over Rate Effective November 10, 2019
- Advice 2817-G, Modification of the Electric Wildfire Mititgation Plan Memorandum Account (WMPMA) and Establishment of the Gas WMPMA
- Advice 2816-G, 2018 Income Tax Expenses resulting from the Tax Cuts and Jobs Act (TCJA”) in Compliance with D.19-09-051, SDG&E’s General Rate Case (“GRC”) application for Test Year 2019 (TY2019)
- Advice 2815-G, Update of the Public Purpose Program Gas Surcharge Rates Effective January 1, 2020
- Advice 2814-G, Revision of the Core Procurement Rate Effective November 1, 2019
- Advice 2813-G, October 2019 Buyback Rate
- Advice 2811-G, Implementation of San Diego Gas & Electric Company's Test Year 2019 General Rate Case (GRC2019) for Rates Effective Effective January 1, 2020
- Advice 2810-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2020
- Advice 2809-G, September 2019 Standby Procurement Rate
- Advice 2808-G, Notification of the Creation of New Affiliates
- Advice 2807-G, Officer Compensation Information Pursuant to Decision (D.)19-09-051
- Advice 2806-G-A, Full Supplemental -- Revision of Cross-Over Rate Effective October 10, 2019
- Advice 2805-G, Supplement -- Emergency Disaster Relief Program Customer Outreach Plan Pursuant to Ordering Paragraph 8 of Decision 19-07-015
- Advice 2804-G, Revision of the Core Procurement Rate Effective October 1, 2019
- Advice 2803-G, September 2019 Buyback Rate
- Advice 2802-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2020)
- Advice 2801-G, Joint Information Only -- 2018 Spending Accountability Report of San Diego Gas & Electric Company and Southern California Gas Company
- Advice 2800-G, Establishment of the Electric and Gas California Consumer Privacy Act Memorandum Accounts (CCPAMA) in Compliance with D.19-09-026
- Advice 2799-G, August 2019 Standby Procurement Rate
- Advice 2798-G, Revision of the Cross-Over Rate Effective September 10, 2019
- Advice 2797-G-A, Supplemental to San Diego Gas & Electric Company's 2020 Annual Energy Efficiency Program and Portfolio Budget Request
- Advice 2797-G, San Diego Gas and Electric Company’s 2020 Annual Energy Efficiency Program and Portfolio Budget Request
- Advice 2796-G, Request of San Diego Gas and Electric for its 2017 and 2018 Energy Efficiency Savings Incentives in Compliance with Decision 13-09-023
- Advice 2795-G, Revision of the Core Procurement Rate Effective September 1, 2019
- Advice 2794-G, August 2019 Buyback Rate
- Advice 2793-G, Creation of the Core Gas Balancing Memorandum Account (CGBMA)
- Advice 2792-G, Notification of the Creation of New Affiliates
- Advice 2791-G, July 2019 Standby Procurement Rate
- Advice 2789-G, Revision of the Cross-Over Rate Effective August 10, 2019
- Advice 2788-G, Revision of the Core Procurement Rate Effective August 1, 2019
- Advice 2787-G, July 2019 Buyback Rate
- Advice 2786-G, Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company's 2018 Energy Efficiency Incentive Award Earnings Rates and Award Caps
- Advice 2785-G, June 2019 Standby Procurement Rate
- Advice 2784-G, Revisions to Rule 30 – Transportation of Customer Owned Gas
- Advice 2783-G-A, Supplemental - Revision of the Cross-Over Rate Effective July 10, 2019
- Advice 2782-G, 2019 Affiliate Transactions Compliance Plan
- Advice 2781-G, Revision of the Core Procurement Rate Effective July 1, 2019
- Advice 2780-G, June 2019 Buyback Rate
- Advice 2779--G-A, Supplemental -- Notification of the Creation of New Affiliates
- Advice 2778-G, May 2019 Standby Procurement Rate
- Advice 2777-G, Request for Recovery of the Transmission Integrity Management Program Balancing Account (TIMPBA) Balance
- Advice 2776-G, Modification to Pipeline Interconnection Tariff to Change the Minimum Heating Value for Biomethane and Implement Procedures for Reduced Siloxane Testing Requirements, Pursuant to Decision (D.) 19-05-018
- Advice 2775-G, Revision of the Cross-Over Rate Effective June 10, 2019
- Advice 2774-G-A, Supplement -- Modifications to Rule No. 30 Operational Flow Order (OFO) Noncompliance Charges Pursuant to (D.) Decision 19-05-030
- Advice 2774-G, Modifications to Rule No. 30 Operational Flow Order (OFO) Noncompliance Charges Pursuant to (D.) Decision 19-05-030
- Advice 2773-G, Basic Ordering Agreements between San Diego Gas & Electric and the United States Government
- Advice 2772-G, Revision of the Core Procurement Rate Effective June 1, 2019
- Advice 2771-G, May 2019 Buyback Rate
- Advice 2769-G, April 2019 Standby Procurement Rate
- Advice 2768-G, Notification of the Creation of New Affiliates
- Advice 2767-G-A, Supplemental -- Establishment of the Contract with RCP Inc. to Perform the Audit of Line 1600 Records Pursuant to Ordering Paragraph 11 of Decision 18-06-028
- Advice 2766-G, Revision of the Cross-Over Rate Effective May 10, 2019
- Advice 2765-G, Distribution PBR Reliability Performace Incentives for 2018
- Advice 2764-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2763-G, Revision of the Core Procurement Rate Effective May 1, 2019
- Advice 2762-G, April 2019 Buyback Rate
- Advice 2761-G, Clean-up Filing to Revise San Diego Gas & Electric Company's Electric and Gas Tariffs
- Advice 2760-G, Modification and Establishment of Balancing Accounts Associated with Certain Pipeline Safety Enhancement Plan (PSEP) Projects and Associated Rate Recovery Pursuant to Decision 19-03-025
- Advice 2759-G, Rate Update for Implementation of Forecasted Revenue Requirements Associated with Certain Pipeline Safety Enhancement Plan (PSEP) Projects and Associated Rate Recovery Pursuant to Decision 19-03-025
- Advice 2758-G, March 2019 Standby Procurement Rate
- Advice 2757-G-A, Partial Supplemental Clean-Up Filing to Revise Electric and Gss Regulatory Accounts
- Advice 2757-G, Clean-Up Filing to Revise Electric and Gas Regulatory Accounts
- Advice 2756-G-A, Supplement -- Clean-Up Filing to Modify Gas and Electric Sample Form 106-44140 (Agreement for Extension and Construction of Overhead/ Underground Electric and Gas Facilities)
- Advice 2755-G, Notification of the Creation of New Affiliates
- Advice 2754-G, Revision of the Cross-Over Rate Effective April 10, 2019
- Advice 2753-G, Revision of the Core Procurement Rate Effective April 1, 2019
- Advice 2752-G, March 2019 Buyback Rate
- Advice 2751-G, Modifications of the Master Meter Balancing Account (MMBA) and Rule 44 Pursuant to Resolution E-4958
- Advice 2749-G, Revenue Requirement Implementation Pursuant to Decision 19-02-004 (PSEP); D.15-10-032 and D.18-03-017 (GHG and California Climate Credit); D.14-12-083 (Low Carbon Fuel Standard Annual Credit); and D.13-05-010 (2012 GRC -- Energy Innovation Center)
- Advice 2748-G, February 2019 Standby Procurement Rate
- Advice 2746-G, Revision of the Cross-Over Rate Effective March 10, 2019
- Advice 2745-G-A, Partial Supplemental - Revisions to Rule 11 - Discontinuance of Service, Pursuant to Decision 18-12-013
- Advice 2745-G, Revisions to Rule 11 – Discontinuance of Service, Pursuant to Decision 18-12-013
- Advice 2744-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4839
- Advice 2743-G, Revision of the Core Procurement Rate Effective March 1, 2019
- Advice 2742-G, February 2019 Buyback Rate
- Advice 2741-G, January 2019 Standby Procurement Rate
- Advice 2740-G, Revision of the Cross-Over Rate Effective February 10, 2019
- Advice 2739-G, Revision of Gas and Electric Rules and Forms to Update the Consumer Affairs Branch Contact Information
- Advice 2738-G, Revision of the Core Procurement Rate Effective February 1, 2019
- Advice 2737-G, January 2019 Buyback Rate
- Advice 2736-G, December 2018 Standby Procurement Rate
- Advice 2735-G, Revision of the Cross-Over Rate Effective January 10, 2019
- Advice 2734-G, Notification of the Creation of New Affiliates
- Advice 2733-G, Revision of the Core Procurement Rate Effective January 1, 2019
- Advice 2732-G, December 2018 Buyback Rate
- Advice 2731-G, San Diego Gas & Electric Annual Disconnection Goal Pursuant to Decision 18-12-013
- Advice 2730-G, Consolidated Gas Rate Changes Effective January 1, 2019
- Advice 2729-G, November 2018 Standby Procurement Rate
- Advice 2728-G, Establishment of the Gas and Electric Officer Compensation Memorandum Accounts 2019 (OCMA2019) Pursuant to Resolution E-4963
- Advice 2727-G, Revision of the Income Tax Component of Contributions and Advances for Construction Pursuant to H.R. 1, Tax Cuts and Jobs Act of 2017
- Advice 2726-G, Revision of the Cross-Over Rate Effective December 10, 2018
- Advice 2725-G, Revision of the Core Procurement Rate Effective December 1, 2018
- Advice 2724-G, November 2018 Buyback Rate
- Advice 2723-G, Modificationof Tariffs Necessary to Implement Decision 18-11-009
- Advice 2722-G, Request of SDG&E for its 2016 and 2017 Energy Efficiency Savings Incentives in Compliance with Decisions 13-09-023 and 17-03-003
- Advice 2721-G, October 2018 Standby Procurement Rate
- Advice 2720-G, Notification of the Creation of New Affiliates
- Advice 2719-G, Revision of the Cross-Over Rate Effective November 10, 2018
- Advice 2718-G, Revision of the Core Procurement Rate Effective November 1, 2018
- Advice 2717-G, October 2018 Buyback Rate
- Advice 2716-G, San Diego Gas & Electric's Statewide Marketing, Education, and Outreach (October 1, 2018 - September 30, 2019 BUDGETS) Pursuant to Decision 16-09-020
- Advice 2714-G, Rate Update to Recover Costs in the Natural Gas Leak Abatement Program Balancing Account for 2018 Pursuant to Resolution G-3538
- Advice 2713-G, Update of the Public Purpose Program Gas Surcharge Rates Effective January 1, 2019
- Advice 2712-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2019
- Advice 2711-G, September 2018 Standby Procurement Rate
- Advice 2710-G, Revision of the Cross-Over Rate Effective October 10, 2018
- Advice 2709-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2019)
- Advice 2708-G, Revision of the Core Procurement Rate Effective October 1, 2018
- Advice 2707-G, September 2018 Buyback Rate
- Advice 2706-G, Establishment of a Customer Information System Balancing Account (CISBA) and Transition, Stabilization and Organizational Change Management Balancing Account (TSOBA) Pursuant to D.18-08-008
- Advice 2705-G, August 2018 Standby Procurement Rate
- Advice 2704-G, Notification of the Creation of New Affiliates
- Advice 2703-G, Revision of the Cross-Over Rate Effective September 10, 2018
- Advice 2702-G, Creation of Gas & Electric Emergency Customer Protections Memorandum Account (ECPMA)
- Advice 2701-G-A, Supplemental - San Diego Gas and Electric Company, Southern California Gas Company, Southern California Edison Company and Pacific Gas and Electric Company’s Shared Funding Mechanism Proposal Pursuant to Decision 18-05-041
- Advice 2700-G-A, Supplemental - San Diego Gas and Electric Company’s 2019 Annual Energy Efficiency Program and Portfolio Budget Request
- Advice 2699-G, Establishment of the Electric and Gas Statewide Energy Efficiency Balancing Accounts Pursuant to Decision 18-05-041
- Advice 2698-G, Revision of the Core Procurement Rate Effective September 1, 2018
- Advice 2697-G-A, Supplemental - August 2018 Buyback Rate
- Advice 2697-G, August 2018 Buyback Rate
- Advice 2696-G, July 2018 Standby Procurement Rate
- Advice 2695-G, Establishment of the General Rate Case Memorandum Account 2019 (GRCMA2019) Pursuant to ALJ Ruling regarding Application (A.) 17-10-007
- Advice 2694-G, Revision of the Cross-Over Rate Effective August 10, 2018
- Advice 2693-G, Revision of the Core Procurement Rate Effective August 1, 2018
- Advice 2692-G, July 2018 Buyback Rate
- Advice 2691-G, June 2018 Standby Procurement Rate
- Advice 2690-G, Establishment of the Line 1600 Records Audit Memorandum Account (L1600RAMA) Pursuant To Decision 18-06-028
- Advice 2689-G, Compliance with California Public Utilities Commission Disposition of San Diego Gas & Electric Company Advice Letter 3196-E-A/2654-G-A for the Energy Savings Assistance Program Multifamily Common Area Activities
- Advice 2688-G, San Diego Gas & Electric Company's Advice Letter for Mid-Cycle Update in Compliance with Decision (D.) 16-11-022 and as Modified by D.17-12-009
- Advice 2687-G, Notification of the Creation of New Affiliates
- Advice 2686-G, 2018 Affiliate Transactions Compliance Plan
- Advice 2685-G, Joint IOU Submittal - Southern California Edison Company, Pacific Gas & Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company’s 2017 Energy Efficiency Incentive Award Earnings Rates and Award Caps
- Advice 2684-G, Revision of the Cross-Over Rate Effective July 10, 2018
- Advice 2683-G, Revision of the Core Procurement Rate Effective July 1, 2018
- Advice 2682-G-A, Supplemental - June 2018 Buyback Rate
- Advice 2681-G, May 2018 Standby Procurement Rate
- Advice 2680-G, Revision of the Cross-Over Rate Effective June 10, 2018
- Advice 2679-G, Revision of the Core Procurement Rate Effective June 1, 2018
- Advice 2678-G, May 2018 Buyback Rate
- Advice 2677-G, April 2018 Standby Procurement Rate
- Advice 2676-G, Modification of High Operational Flow Order (OFO) Tariff Rules Pursuant to Decision (D.) 16-06-039 and D.16-12-015
- Advice 2675-G-A, Partial Supplemental - Rate Update to Recover Costs for the Aliso Canyon Turbine Replacement Project Pursuant to Decision 13-11-023
- Advice 2675-G, Rate Update to Recover Costs for the Aliso Canyon Turbine Replacement Project Pursuant to Decision 13-11-023
- Advice 2674-G, Balancing Account and Rate Schedule Modifications Supporting a Voluntary Renewable Natural Gas Procurement Pilot
- Advice 2673-G-C, Supplemental - Rate Update to Include Costs for Greenhouse Gas Compliance and the 2018 California Climate Credit in Accordance with Decision 15-10-032 Decision 18-03-017
- Advice 2672-G, Revision of the Cross-Over Rate Effective May 10, 2018
- Advice 2671-G, Revenue Requirement Adjustment and Base Margin Reduction Related to the SDG&E Energy Innovation Center
- Advice 2670-G, Notification of the Creation of New Affiliates
- Advice 2669-G, Distribution PBR Reliability Performance Incentives for 2017
- Advice 2668-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2667-G, Revision of the Core Procurement Rate Effective May 1, 2018
- Advice 2666-G, April 2018 Buyback Rate
- Advice 2665-G, March 2018 Standby Procurement Rate
- Advice 2664-G, San Diego Gas & Electric Company’s Request to Shift Unspent Funds to the In-Home Education Subcategory under the Energy Savings Assistance Program
- Advice 2663-G-A, Supplemental Clean-Up Filing to Revise Electric and Gas Regulatory Accounts
- Advice 2662-G, Revision of the Cross-Over Rate Effective April 10, 2018
- Advice 2661-G, Revision of the Core Procurement Rate Effective April 1, 2018
- Advice 2660-G, March 2018 Buyback Rate
- Advice 2659-G, Revisions to San Diego Gas & Electric's Schedule G-CBS and Rule 32 in Compliance with Decision 18-02-002
- Advice 2658-G, Notification of the Creation of New Affiliates
- Advice 2657-G, February 2018 Standby Procurement Rate
- Advice 2656-G, Revision of the Cross-Over Rate Effective March 10, 2018
- Advice 2655-G, San Diego Gas & Electric Company’s Proposal for Programmable Communicating Thermostats Pilot in Compliance with Decision 17-12-009
- Advice 2654-G-A, Supplemental - San Diego Gas & Electric Company’s Implementation Plans of the Multifamily Common Area Activities in Compliance with Decision 17-12-009
- Advice 2654-G, San Diego Gas & Electric Company’s Implementation Plans of the Multifamily Common Area Activities in Compliance with Decision 17-12-009
- Advice 2653-G, Revision of the Core Procurement Rate Effective March 1, 2018
- Advice 2652-G, February 2018 Buyback Rate
- Advice 2651-G, January 2018 Standby Procurement Rate
- Advice 2650-G, San Diego Gas & Electric Company’s Advice Letter for In-Home Education Activity under the Energy Savings Assistance Program in Compliance with Resolution E-4884
- Advice 2649-G, Revision of the Cross-Over Rate Effective February 10, 2018
- Advice 2648-G, Notification of the Creation of New Affiliates
- Advice 2647-G, Revision of the Core Procurement Rate Effective February 1, 2018
- Advice 2646-G, January 2018 Buyback Rate
- Advice 2645-G, Emergency Residential and Non-Residential Customer Protections for December Wildfire Victims
- Advice 2644-G, December 2017 Standby Procurement Rate
- Advice 2643-G, Revision of the Cross-Over Rate Effective January 10, 2018
- Advice 2642-G, Request to Close Gas and Electric Wildfire Expense Memorandum Accounts (WEMA) Pursuant to Decision (D.) 17-11-033
- Advice 2641-G, Revision of the Core Procurement Rate Effective January 1, 2018
- Advice 2640-G, December 2017 Buyback Rate
- Advice 2639-G, Establishment of the Dairy Biomethane Solicitation Development Memorandum Account (DBSDMA) Pursuant to D.17-12-004
- Advice 2638-G, Consolidated Gas Rate Changes Effective January 1, 2018
- Advice 2637-G, November 2017 Standby Procurement Rate
- Advice 2636-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4832
- Advice 2635-G, Modification of the Gas New Environmental Regulation Balancing Account (NERBA)
- Advice 2634-G, Revision of Gas and Electric Preliminary Statements to Implement New Accounting Guidance Principles
- Advice 2632-G, Revision of the Cross-Over Rate Effective December 10, 2017
- Advice 2631-G, Modification of Tariffs Necessary to Implement Decision 17-11-021
- Advice 2630-G, Notification of the Creation of New Affiliates
- Advice 2629-G, Revision of the Core Procurement Rate Effective December 1, 2017
- Advice 2628-G, November 2017 Buyback Rate
- Advice 2627-G, October 2017 Standby Procurement Rate
- Advice 2626-G-A, Supplemental: Emergency Customer Protections for October 2017 Wildfire Victims
- Advice 2625-G, San Diego Gas and Electric Company’s 2018-2020 Energy Efficiency Finance Pilots Budget Request
- Advice 2624-G, Revision of the Cross-Over Rate Effective November 10, 2017
- Advice 2623-G, Revision of the Core Procurement Rate Effective November 1, 2017
- Advice 2622-G, October 2017 Buyback Rate
- Advice 2621-G-B, Full Supplement - 2018, 2019 & 2020 Ratemaking Forecasts for Natural Gas Leak Abatement Program Memorandum Account (NGLAPMA) & Balancing Account (NGLAPBA), and the Program Subaccount (NGLAP) in the New Environmental Regulation Balancing Account (NERBA)
- Advice 2620-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2018
- Advice 2619-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2018
- Advice 2618-G, September 2017 Standby Procurement Rate
- Advice 2617-G, Distribution PBR Reliability Performance Incentives for 2016
- Advice 2616-G, Revision of the Cross-Over Rate Effective October 10, 2017
- Advice 2615-G, San Diego Gas and Electric’s Statewide Marketing, Education, and Outreach (October 1, 2017 – September 30, 2018 Budgets) Pursuant to Decision 16-09-020
- Advice 2614-G, Revision of the Core Procurement Rate Effective October 1, 2017
- Advice 2613-G, September 2017 Buyback Rate
- Advice 2612-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2018)
- Advice 2611-G, Update Authorized Return on Ratebase per Decision (D.) 17-07-005
- Advice 2610-G, Notification of the Creation of New Affiliates
- Advice 2609-G, August 2017 Standby Procurement Rate
- Advice 2608-G, Revision of the Cross-Over Rate Effective September 10, 2017
- Advice 2606-G, Request of SDG&E for its 2015 and 2016 Energy Efficiency Savings Incentives in Compliance with Decisions 13-09-023 and 17-03-003
- Advice 2605-G, Revision of the Core Procurement Rate Effective September 1, 2017
- Advice 2604-G, August 2017 Buyback Rate
- Advice 2603-G, Clean-Up Filing to Revise Gas Regulatory Accounts
- Advice 2602-G, Revision to Schedule G-IMB - Transportation Imbalance Service
- Advice 2601-G, July 2017 Standby Procurement Rate
- Advice 2600-G, Revision of the Cross-Over Rate Effective August 10, 2017
- Advice 2599-G, Revision of the Core Procurement Rate Effective August 1, 2017
- Advice 2598-G, July 2017 Buyback Rate
- Advice 2597-G, Removal of the Transmission Integrity Management Program Balancing Account Under Collection
- Advice 2596-G, June 2017 Standby Procurement Rate
- Advice 2595-G, Modification of Gas and Electric Rule 9 (Rendering and Payment of Bills) in Compliance with Decision (D.) 16-06-054
- Advice 2594-G, Notification of the Creation of New Affiliates
- Advice 2593-G, Establishment of the Natural Gas Leak Abatement Program Memorandum Account (NGLAPMA) and Balancing Account (NGLAPBA), and Modification to the New Environmental Regulation Balancing Account (NERBA), Pursuant to Decision (D.) 17-06-015
- Advice 2592-G, Revision of the Cross-Over Rate Effective July 10, 2017
- Advice 2591-G, Joint IOU Filing - Southern California Edison Company, Pacific Gas & Electric Company, San Diego Gas & Electric Company, and Southern California Gas Company’s 2016 Energy Efficiency Incentive Award Earnings Rates and Award Caps
- Advice 2590-G, Revision of the Core Procurement Rate Effective July 1, 2017
- Advice 2589-G, June 2017 Buyback Rate
- Advice 2588-G, May 2017 Standby Procurement Rate
- Advice 2587-G, 2017 Affiliate Transactions Compliance Plan
- Advice 2586-G, Revision of the Cross-Over Rate Effective June 10, 2017
- Advice 2585-G, Request to Establish the Customer Information System Memorandum Account (CISMA) to Record Costs Incurred in Advance of Application Approval
- Advice 2584-G, Revision of the Core Procurement Rate Effective June 1, 2017
- Advice 2583-G, May 2017 Buyback Rate
- Advice 2582-G, April 2017 Standby Procurement Rate
- Advice 2581-G, San Diego Gas and Electric Company’s Demonstration of Compliance with Resolution E-4820
- Advice 2580-G, Assembly Bill (AB) 793 Joint IOU Marketing Plan Pursuant to Resolution E-4820
- Advice 2579-G, Notification of the Creation of New Affiliates
- Advice 2577-G, Revision of the Cross-Over Rate Effective May 10, 2017
- Advice 2576-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2575-G, Revisions to Gas Consulting Services Agreement (Form 143-002)
- Advice 2574-G, Revision of the Core Procurement Rate Effective May 1, 2017
- Advice 2573-G, April 2017 Buyback Rate
- Advice 2572-G, Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Rule 15
- Advice 2571-G, March 2017 Standby Procurement Rate
- Advice 2569-G, Revision of the Cross-Over Rate Effective April 10, 2017
- Advice 2568-G-A, Supplemental - San Diego Gas & Electric Company's Low-Income Conforming Advice Letter in Compliance with Decision 16-11-022
- Advice 2568-G, San Diego Gas & Electric Company's Low-Income Conforming Advice Letter in Compliance with Decision 16-11-022
- Advice 2567-G, Revision of the Core Procurement Rate Effective April 1, 2017
- Advice 2566-G, March 2017 Buyback Rate
- Advice 2565-G, Modification of Tariffs Necessary to Implement Decision (D.) 17-03-020
- Advice 2564-G, February 2017 Standby Procurement Rate
- Advice 2563-G-A, Partial Supplement - Continuation of The Mobile Home Park Utility Upgrade Program Pursuant to Decision (D.)14-03-021 and Resolution E-4878
- Advice 2563-G, Continuation of the Mobilehome Park Utility Upgrade Program Pursuant to Decision (D.)14-03-021 and Modification to the Master Meter Balancing Accounts and Rule 44
- Advice 2562-G, Revisions to Gas Consulting Services Agreement (Form 143-002)
- Advice 2561-G, Revision of the Cross-Over Rate Effective March 10, 2017
- Advice 2560-G, Revision of the Core Procurement Rate Effective March 1, 2017
- Advice 2559-G-A, Supplemental - February 2017 Buyback Rate
- Advice 2558-G, Establish Avoided Cost Calculator Update Memorandum Account (ACCUMA)
- Advice 2557-G, Clean-Up Filing to Revise Schedule G-IMB
- Advice 2556-G, January 2017 Standby Procurement Rate
- Advice 2555-G, Notification of the Creation of New Affiliates
- Advice 2554-G, Revision of the Cross-Over Rate Effective February 10, 2017
- Advice 2553-G, Description of Program Mechanics and Tariff Modifications Related to the Adoption of Biomethane Promotion Policies and Program in Compliance with Decision 16-12-043
- Advice 2552-G, Revision of the Core Procurement Rate Effective February 1, 2017
- Advice 2551-G, January 2016 Buyback Rate
- Advice 2550-G, December 2016 Standby Procurement Rate
- Advice 2549-G-A, Supplement -- Reinstatement of the Gas Research Development and Demonstration (RD&D) Balancing Account
- Advice 2548-G, Revision of the Cross-Over Rate Effective January 10, 2017
- Advice 2547-G, Notification of the Creation of New Affiliates
- Advice 2546-G, Revision of the Core Procurement Rate Effective January 1, 2017
- Advice 2545-G, December 2016 Buyback Rate
- Advice 2544-G, Consolidated Gas Rate Changes Effective January 1, 2017
- Advice 2543-G-A, Partial Supplemental - November 2016 Standby Procurement Rate
- Advice 2543-G, November 2016 Standby Procurement Rate
- Advice 2542-G, Statewide Marketing, Education and Outreach (October 1, 2016 – September 30, 2019) Budgets Pursuant to Decision 16-09-020
- Advice 2541-G, Pipeline Safety Enhancement Plan (PSEP) Pipeline Safety and Reliability Memorandum Account (PSRMA) Proceeding Revenue Requirement Implementation Pursuant to Decision 16-12-063
- Advice 2540-G, Information-Only Filing: Involuntary Closure of SDG&E's Oceanside Branch Office
- Advice 2539-G, Modification of Energy Savings Assistance Programs Memorandum Account Pursuant to Decision 16-06-018
- Advice 2538-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4830
- Advice 2537-G, Revision of the Cross-Over Rate Effective December 10, 2016
- Advice 2536-G, Modification of Tariffs Necessary to Implement the Decision Approving Second Daily Balancing Proposal Settlement Agreement in Application (A.) 15-06-020
- Advice 2535-G, Revision of the Core Procurement Rate Effective December 1, 2016
- Advice 2534-G, November 2016 Buyback Rate
- Advice 2533-G, October 2016 Standby Procurement Rate
- Advice 2531-G, Triennial Cost Allocation Proceeding Phase 2 Implementation Pursuant to Decision 16-10-004
- Advice 2530-G, Revision of the Cross-Over Rate Effective November 10, 2016
- Advice 2529-G, Request for Recovery of the Transmission Integrity Management Program Balancing Account (TIMPBA) Balance
- Advice 2528-G, Notification of the Creation of New Affiliates
- Advice 2527-G, Revision of the Core Procurement Rate Effective November 1, 2016
- Advice 2526-G, October 2016 Buyback Rate
- Advice 2524-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2017
- Advice 2523-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2017
- Advice 2522-G, Modification of Tariffs Related to Implementation of D.16-07-008 (Gas Curtailment Procedures)
- Advice 2521-G, September 2016 Standby Procurement Rate
- Advice 2520-G, Revision of the Cross-Over Rate Effective October 10, 2016
- Advice 2519-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimates (2017)
- Advice 2518-G, Revision of the Core Procurement Rate Effective October 1, 2016
- Advice 2517-G, September 2016 Buyback Rate
- Advice 2516-G, August 2016 Standby Procurement Rate
- Advice 2515-G, Notification of the Creation of New Affiliates
- Advice 2514-G-A, Supplemental -- Proposed Enhancements to SDG&E's Monthly Bill Format (Form 110-00432)
- Advice 2513-G, Revision of the Cross-Over Rate Effective September 10, 2016
- Advice 2512-G-A, Supplemental - San Diego Gas And Electric Company's 2017 Annual Energy Efficiency Program And Portfolio Budget Request
- Advice 2512-G, San Diego Gas And Electric Company's 2017 Annual Energy Efficiency Program And Portfolio Budget Request
- Advice 2511-G-A, Supplemental - Request of San Diego Gas Electric Company for its 2014 Energy Efficiency Savings Incentives in Compliance with Decisions 12-12-032 and 13-09-023
- Advice 2510-G, Revision of the Core Procurement Rate Effective September 1, 2016
- Advice 2509-G, August 2016 Buyback Rate
- Advice 2508-G, July 2016 Standby Procurement Rate
- Advice 2507-G, Request for 2016 Energy Efficiency Program Fund Shifting Approval
- Advice 2506-G-A, Supplemental - Establishment of SDG&E's Pipeline Safety Enhancement Plan - Phase 2 Memorandum Account (PSEP-P2MA) and Updated Revenue Requirement Pursuant to Decision 16-08-003
- Advice 2505-G-A, Supplemental - Assembly Bill (AB) 793 Joint IOU Marketing Plan Pursuant to Joint Administrative Law Judge’s Ruling Providing Guidance in Compliance with AB 793 Activities
- Advice 2503-G, Establishment of the Officer Compensation Memorandum Account (OCMA) Pursuant to Decision (D.)16-06-054
- Advice 2502-G, Revision of the Cross-Over Rate Effective August 10, 2016
- Advice 2501-G, Update of Schedule GP-SUR - Customer-Procured Gas Franchise Fee Surcharge
- Advice 2500-G-B, Partial Supplemental - San Diego Gas & Electric Company's Request for Approval of Program Plans and Budgets to Comply with the Requirements of Assembly Bill 793
- Advice 2500-G-A, Supplemental - San Diego Gas & Electric Company’s Request for Approval of Program Plans and Budgets to Comply with the Requirements of Assembly Bill 793
- Advice 2499-G, Modification of Regulatory Accounts in Compliance with Decision (D.) 16-06-054
- Advice 2498-G, Revision of the Core Procurement Rate Effective August 1, 2016
- Advice 2497-G, July 2016 Buyback Rate
- Advice 2496-G-A, Supplement -- Establishment of the Gas and Electric Tax Memorandum Account (TMA) Pursuant to Decision 16-06-054
- Advice 2495-G, Distribution PBR Reliability Performance Incentives for 2015
- Advice 2494-G, Triennial Cost Allocation Proceeding (TCAP) Tariff Implementation Pursuant to Decision 16-06-039
- Advice 2493-G-A, Supplement - Triennial Cost Allocation Proceeding (TCAP) High Operational Flow Order Impelment Pursuant to Decision (D.) 16-06-039
- Advice 2492-G-A, Supplemental - Triennial Cost Allocation Proceeding (TCAP) Rate Implementation Pursuant to Decision 16-06-039
- Advice 2491-G, June 2016 Standby Procurement Rate
- Advice 2490-G-B, Supplemental - Corrections to Test Year 2016 General Rate Case Rate Implementation Effective August 1, 2016 and there Applicable Rate Changes Pursuant to D.16-09-043
- Advice 2490-G-A, Partial Supplemental -- Test Year 2016 General Rate Case (GRC) Rate Implementation Effective August 1, 2016 and Other Applicable Rate Changes
- Advice 2490-G, Test Year 2016 General Rate Case (GRC) Rate Implementation Effective August 1, 2016 and other Applicable Rate Changes.
- Advice 2489-G, Revision of the Cross-Over Rate Effective July 10, 2016
- Advice 2488-G, Notification of the Creation of New Affiliates
- Advice 2487-G, 2016 Affiliate Transactions Compliance Plan
- Advice 2486-G, Revision of the Core Procurement Rate Effective July 1, 2016
- Advice 2485-G, June 2016 Buyback Rate
- Advice 2484-G, May 2016 Standby Procurement Rate
- Advice 2483-G-A, Supplemental -- Update to Sample Customer Billing Form 110-00432/2
- Advice 2482-G, Revision of CARE and FERA Eligibilty Form 142-740
- Advice 2481-G, Revision of the Cross-Over Rate Effective June 10, 2016
- Advice 2480-G-A, Partial Supplemental - Revision of the Core Procurement Rate Effective June 1, 2016
- Advice 2480-G, Revision of the Core Procurement Rate Effective June 1, 2016
- Advice 2479-G-A, Supplemental - May 2016 Buyback Rate
- Advice 2478-G, Temporary Modification of Tariffs Necessary to Implement Assigned Commissioner's May 27, 2016 Ruling in A.15-06-020
- Advice 2477-G, April 2016 Standby Procurement Rate
- Advice 2476-G, Rate Update to Recover the Transmission Integrity Management Program Balancing Account Authorized in Resolution G-3517
- Advice 2475-G, Revisions to the Medical Baseline Application Forms
- Advice 2474-G, Revision of the Cross-Over Rate Effective May 10, 2016
- Advice 2473-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2472-G, Revision of the Core Procurement Rate Effective May 1, 2016
- Advice 2471-G, April 2016 Buyback Rate
- Advice 2470-G, March 2016 Standby Procurement Rate
- Advice 2469-G, Notification of the Creation of New Affiliates
- Advice 2468-G, Revision of the Cross-Over Rate Effective April 10, 2016
- Advice 2467-G, Revision of the Core Procurement Rate Effective April 1, 2016
- Advice 2466-G, March 2016 Buyback Rate
- Advice 2465-G, February 2016 Standby Procurement Rate
- Advice 2464-G, Notification of the Creation of New Affiliates
- Advice 2463-G, Establishment of the Gas and Electric Assembly Bill 802 Memorandum Accounts (AB802MA)
- Advice 2462-G, Revision of the Cross-Over Rate Effective March 10, 2016
- Advice 2461-G, Revision of the Core Procurement Rate Effective March 1, 2016
- Advice 2460-G, February 2016 Buyback Rate
- Advice 2459-G, January 2016 Standby Procurement Rate
- Advice 2457-G, Clean-Up Revisions to the Energy Efficiency Financing Pilot Programs Authorization or Revocation of Authorization to Release Customer Information (Form 185-2000)
- Advice 2456-G, Revision of the Cross-Over Rate Effective February 10, 2016
- Advice 2455-G, Revision of the Safety Enhancement Expense Balancing Account (SEEBA) and Safety Enhancement Capital Cost Balancing Account (SECCBA) in Compliance with Decision (D.) 15-12-020
- Advice 2454-G, Modification of SDG&E's Electric and Gas Rule 1 (Definitions) to Accommodate Postcards
- Advice 2453-G, Revision of the Core Procurement Rate Effective February 1, 2016
- Advice 2452-G, January 2016 Buyback Rate
- Advice 2451-G, December 2015 Standby Procurement Rate
- Advice 2450-G, Reduction of the Income Tax Component of Contributions and Advances Provision
- Advice 2449-G, Revision of the Cross-Over Rate Effective January 10, 2016
- Advice 2448-G, Notification of the Creation of New Affiliates
- Advice 2447-G, Revision of the Core Procurement Rate Effective January 1, 2016
- Advice 2446-G, December 2015 Buyback Rate
- Advice 2445-G, Consolidated Gas Rate Changes Effective January 1, 2016
- Advice 2444-G, Revision to the Energy Efficiency Financing Pilot Programs Authorization or Revocation of Authorization to Release Customer Information (Form 185-2000)
- Advice 2443-G, November 2015 Standby Procurement Rate
- Advice 2441-G, Revisions to the Electric and Gas Smart Meter Opt-Out Balancing Accounts
- Advice 2440-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4828
- Advice 2439-G, Revision of the Cross-Over Rate Effective December 10, 2015
- Advice 2438-G, Revisions to the Application Forms for the California Alternate Rates for Energy (CARE) Program
- Advice 2437-G, Daily Balancing Standby Rates for November 2015
- Advice 2436-G, Revision of the Core Procurement Rate Effective December 1, 2015
- Advice 2435-G, November 2015 Buyback Rate
- Advice 2434-G, October 2015 Standby Procurement Rate
- Advice 2433-G, Establishment of the Cap-and-Trade Cost Exemption and the California Climate Credit Pursuant to D.15-10-032
- Advice 2432-G, Modification of the Greenhouse Gas Administrative Cost Memorandum Account Pursuant to D.15-10-032
- Advice 2431-G, Modification of the Greenhouse Gas Balancing Account Pursuant to D.15-10-032
- Advice 2430-G, Revision of the Cross-Over Rate Effective November 10, 2015
- Advice 2429-G, Notification of the Creation of New Affliates and Affiliates Name Change
- Advice 2428-G-A, Partial Supplement: Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2016 with Greenhouse Gas Compliance Costs and Proceeds Effective April 1, 2016
- Advice 2428-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2016
- Advice 2427-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2016
- Advice 2426-G, Revision of the Core Procurement Rate Effective November 1, 2015
- Advice 2425-G, October 2015 Buyback Rate
- Advice 2424-G, September 2015 Standby Procurement Rate
- Advice 2423-G, Revision of the Cross-Over Rate Effective October 10, 2015
- Advice 2422-G, Low-Carbon Fuel Standard (LCFS) Program Annual Credit and Revenue Estimats (2016)
- Advice 2421-G, Revision of the Core Procurement Rate Effective October 1, 2015
- Advice 2420-G, September 2015 Buyback Rate
- Advice 2419-G, August 2015 Standby Procurement Rate
- Advice 2418-G, Program Mechanics and Tariff Modifications Related to the Adoption of Biomethane Promotion Policies and Program in Compliance with Decision 15-06-029
- Advice 2417-G, Request of San Diego Gas Electric Company for its 2013 Energy Efficiency Savings Incentives Second Claim in Compliance with Decision 13-09-023
- Advice 2416-G, Request for 2015 Energy Efficiency Program Fund Shifting Approval
- Advice 2415-G, Establishment of the Biomethane Cost Incentive Program Balancing Account (BICPBA) in Compliance with Decision 15-06-029
- Advice 2414-G, Revision of the Cross-Over Rate Effective September 10, 2015
- Advice 2413-G, Revision of the Core Procurement Rate Effective September 1, 2015
- Advice 2412-G, August 2015 Buyback Rate
- Advice 2411-G, July 2015 Standby Procurement Rate
- Advice 2410-G, Notification of the Creation of New Affiliates
- Advice 2409-G, Joint IOU Filing: Request of Pacific Gas and Electric, San Diego Gas & Electric, Southern California Edison and Southern California Gas to Increase the Incentive Levels for Food Service Measures Offered in the Statewide Commercial Energy Efficiency Program
- Advice 2408-G, Modification of Rule No. 30, Transportation of Customer-Owned Gas, in Compliance with FERC Docket No. RM14-2-000; Order No. 809
- Advice 2407-G, Joint IOU Filing - Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison Company’s To-Code Pilot Pursuant to Decision 14-10-046
- Advice 2406-G, Information Technology Implementation Costs Associated with the New Energy Efficiency Financing Pilot Programs Pursuant to Decision 13-09-044
- Advice 2405-G, Revisions to Electric and Gas Rule 43 - On-Bill Repayment Pilots Pursuant to Decision 15-06-008
- Advice 2404-G, Notification of the Creation of New Affiliates
- Advice 2403-G, Revision of the Cross-Over Rate Effective August 10, 2015
- Advice 2402-G, Request for Approval to Procure Greenhouse Gas (GHG) Cap-And-Trade Compliance Instruments from New Exchanges and Brokers
- Advice 2401-G, Revision of the Core Procurement Rate Effective August 1, 2015
- Advice 2400-G, July 2015 Buyback Rate
- Advice 2399-G, June 2015 Standby Procurement Rate
- Advice 2398-G, Revision of the Cross-Over Rate Effective July 10, 2015
- Advice 2397-G, Publication of San Diego Gas & Electric's 2015 Gas Pipeline Capacity Open Season Results
- Advice 2396-G, Request of San Diego Gas and Electric Company for its 2014 Energy Efficiency Savings Incentives in Compliance with Decisions 12-12-032 and 13-09-023
- Advice 2395-G, Revision of the Core Procurement Rate Effective July 1, 2015
- Advice 2394-G, Establishment of the General Rate ase Memorandum Account 2016 (GRCMA2016) Pursuant to Decision (D.) 15-05-044
- Advice 2393-G, June 2015 Buyback Rate
- Advice 2392-G, Modification of Tariffs Necessary to Implement Low Operational Flow Order and Emergency Flow Order Requirements in Compliance with Decision 15-06-004
- Advice 2391-G, 2015 Affiliate Transactions Compliance Plan
- Advice 2390-G, Rate Update to Recover the Transmission Integrity Management Program Balancing Account Authorized in Resolution G-3499
- Advice 2389-G, May 2015 Standby Procurement Rate
- Advice 2388-G, Revision of the Cross-Over Rate Effective June 10, 2015
- Advice 2387-G, Revision of the Core Procurement Rate Effective June 1, 2015
- Advice 2386-G, May 2015 Buyback Rate
- Advice 2385-G, Establishment of the Energy Efficiency Financing Pilot Programs Sample Form
- Advice 2384-G, April 2015 Standby Procurement Rate
- Advice 2383-G, Revision of the Cross-Over Rate Effective May 10, 2015
- Advice 2382-G, Notification of the Creation of New Affiliates
- Advice 2381-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2380-G, Revision of the Core Procurement Rate Effective May 1, 2015
- Advice 2379-G, April 2015 Buyback Rate
- Advice 2378-G, Modifications to Forms 187-1000 and 187-2000 Pursuant to Decision (D.) 14-05-016
- Advice 2377-G, March 2015 Standby Procurement Rate
- Advice 2376-G, Revision of the Cross-Over Rate Effective April 10, 2015
- Advice 2375-G, Daily Balancing Standby Rates for March 2015
- Advice 2374-G, Revision of the Core Procurement Rate Effective April 1, 2015
- Advice 2373-G, March 2015 Buyback Rate
- Advice 2372-G, Revisions to Update Biomethane Delivery Specifications in Gas Rule 30 -- Transportation of Customer-Owned Gas
- Advice 2371-G, February 2015 Standby Procurement Rate
- Advice 2370-G, Low-Carbon Fuel Standard (LCFS) Program Implementation Plan for Natural Gas Vehicles and Establishment of the LCFS Balancing Account (LCFSBA)
- Advice 2369-G, Establishment of the Gas and Electric Smart Meter Opt-Out Balancing Accounts (SMOBA) and Revisions to the Gas and Electric Schedules SMOP in Compliance with Decision 14-12-048
- Advice 2368-G, Revision of the Cross-Over Rate Effective March 10, 2015
- Advice 2367-G, Daily Balancing Standby Rates for February 2015
- Advice 2366-G, Establishment of a Deductible Tax Repairs Benefits Memorandum Account (DTRBMA)
- Advice 2365-G, Revision of the Core Procurement Rate Effective March 1, 2015
- Advice 2364-G, February 2015 Buyback Rate
- Advice 2363-G, Joint IOU Filing - Updates to the 2015 Efficiency Savings and Performance Incentive Mechanism Earnings Coefficient and Caps
- Advice 2362-G, January 2015 Standby Procurement Rate
- Advice 2361-G, Joint IOU Filing - Request of PG&E, SDG&E, SCE, and SCG for Approval of the Statewide Energy Efficiency Workforce Education and Training Program Implementation Plan Addendum in Compliance with Commission Decision 14-10-046 (OP 17)
- Advice 2360-G, Joint IOU Filing -- PG&E, SDG&E, SCE, and SoCalGas' Zero Net Energy Pilot for Local Educational Agencies (LEAs) and Community Colleges Pursuant to OP 7 of D.14-10-046
- Advice 2359-G, Revision of the Cross-Over Rate Effective February 10, 2015
- Advice 2358-G, Daily Balancing Standby Rates for January 2015
- Advice 2357-G, Revision of the Core Procurement Rate Effective February 1, 2015
- Advice 2356-G, January 2015 Buyback Rate
- Advice 2355-G, December 2014 Standby Procurement Rate
- Advice 2354-G, Establishment of Greenhouse Gas Balancing Account and Greenhouse Gas Administraive Costs Memorandum Account and Modification of New Environmental Regulatory Balancing Account in Compliance with D.14-12-040
- Advice 2352-G, Revision of the Cross-Over Rate Effective January 10, 2015
- Advice 2351-G, Daily Balancing Standby Rates for December 2014
- Advice 2350-G, Revision of the Income Tax Component of Contributions and Advances Provision and Request to Issue Refunds Pursuant to Recent Retroactive Changes in Tax Law
- Advice 2349-G, Revision of the Core Procurement Rate Effective January 1, 2015
- Advice 2348-G, December 2014 Buyback Rate
- Advice 2347-G, Consolidated Gas Rate Changes Effective January 1, 2015
- Advice 2346-G, November 2014 Standby Procurement Rate
- Advice 2345-G, Notification of the Creation of New Affiliates
- Advice 2344-G, San Diego Gas and Electric's 2015 Energy Efficiency Filing Pursuant to Decision 14-10-046
- Advice 2343-G, Revision of the Cross-Over Rate Effective December 10, 2014
- Advice 2342-G, Daily Balancing Standby Rates for November 2014
- Advice 2341-G-A, Supplemental Request of PG&E, SDG&E, and SCE to Increase the Incentive Level for Gas and Electric Griddles offered in the Statewide Commercial Energy Efficiency Program
- Advice 2341-G, Joint Filing: Request of PG&E, SDG&E, SoCalGas, and SCE to Increase the Incentive Level for a Measure offered in the Statewide Commercial Energy Efficiency Program
- Advice 2340-G, Revision of the Core Procurement Rate Effective December 1, 2014
- Advice 2339-G, November 2014 Buyback Rate
- Advice 2337-G, October 2014 Standby Procurement Rate
- Advice 2336-G, Revision of the Cross-Over Rate Effective November 10, 2014
- Advice 2335-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2015
- Advice 2334-G, Revision of the Core Procurement Rate Effective November 1, 2014
- Advice 2333-G, October 2014 Buyback Rate
- Advice 2332-G, Annual Regulatory Gas Account Balance Update for Rates Effective January 1, 2015
- Advice 2331-G, Revision to California Alternative Rates for Energy Program's Eligibility Forms to Comply with Decision 14-08-030
- Advice 2330-G, September 2014 Standby Procurement Rate
- Advice 2329-G, Revision of the Cross-Over Rate Effective October 10, 2014
- Advice 2328-G, Revision of the Core Procurement Rate Effective October 1, 2014
- Advice 2327-G, September 2014 Buyback Rate
- Advice 2326-G, August 2014 Standby Procurement Rate
- Advice 2325-G, Revision of the Cross-Over Rate Effective September 10, 2014
- Advice 2324-G, Revision of the Core Procurement Rate Effective September 1, 2014
- Advice 2323-G-A, Supplemental Filing - August 2014 Buyback Rate
- Advice 2323-G, August 2014 Buyback Rate
- Advice 2322-G, Request for Authorization to Establish Field Parts Replacement Service on a Non-Tariffed Basis
- Advice 2320-G, Revisions to San Diego Gas & Electric Forms 101-00751 and 101-01072 Notice of Disconnect Pursuant to Decision 14-06-036
- Advice 2319-G, July 2014 Standby Procurement Rate
- Advice 2318-G, Addition of BKK Corporation Landfill to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 2317-G, Revision of the Cross-Over Rate Effective August 10, 2014
- Advice 2316-G, Revision of the Core Procurement Rate Effective August 1, 2014
- Advice 2315-G, July 2014 Buyback Rate
- Advice 2314-G-B, Partial Supplemental: Establishment of Gas and Electric Rule No. 44, Mobilehome Park Pilot Conversion Program Pursuant to Decision (D.) 14-03-021
- Advice 2314-G-A, Supplemental: Establishment of Gas and Electric Rule No. 44, Mobilehome Park Pilot Conversion Program Pursuant to Decision (D.) 14-03-021
- Advice 2313-G, Modifications to Rule 33 to Establish the Data Request and Release Process for Providing Data to Entities Pursuant to Decision (D.) 14-05-016
- Advice 2312-G-B, Partial Supplemental - Joint IOU Filing: Implementation of Energy Efficiency (EE) Finance Program Pilots in Compliance with Resolution E-4663
- Advice 2312-G-A, Supplemental Joint IOU Filing - Implementation of Energy Efficiency (EE) Finance Program Pilots in Compliance with Resolution E-4663
- Advice 2311-G, June 2014 Standby Procurement Rate
- Advice 2310-G, Notification of the Creation of New Affiliates
- Advice 2309-G-A, Supplemental Filing - Request for 2013-2014 Energy Efficiency Program Fund Shifting Approval
- Advice 2309-G, Request for 2013-2014 Energy Efficiency Program Fund Shifting Approval
- Advice 2308-G, Revision of the Cross-Over Rate Effective July 10, 2014
- Advice 2307-G, Establishment of the Energy Data Request Memorandum Account (EDRMA) Pursuant to Decision 14-05-016
- Advice 2306-G, 2014 Affiliate Transactions Compliance Plan
- Advice 2305-G-A, Supplemental: Modifications to Preliminary Statements Regarding Credit, Collection and Disconnection Practices and Establishment of the Residential Disconnect Memorandum Account (RDMA) Pursuant to Decision (D.) 14-06-036
- Advice 2305-G, Modifications to Preliminary Statements Regarding Credit, Collection and Disconnection Practices and Establishment of the Residential Disconnect Memorandum Account (RDMA) Pursuant to Decision (D.) 14-06-036
- Advice 2304-G, Revision of the Core Procurement Rate Effective July 1, 2014
- Advice 2303-G, June 2014 Buyback Rate
- Advice 2302-G, Triennial Cost Allocation Proceeding (TCAP) Settlement Implementation
- Advice 2301-G, May 2014 Standby Procurement Rate
- Advice 2300-G, Establishment of SECCBA and SEEBA Balancing Accounts and Modification to PSRMA in Compliance with Decision (D.) 14-06-007
- Advice 2299-G, Request to Remove Incentive Cap to Drive Deeper Savings for the Energy Upgrade California Advanced Home Upgrade Program of SDG&E, SCG, SCE and PG&E
- Advice 2298-G, Revision of the Cross-Over Rate Effective June 10, 2014
- Advice 2297-G, Revision of the Core Procurement Rate Effective June 1, 2014
- Advice 2296-G, May 2014 Buyback Rate
- Advice 2295-G, April 2014 Standby Procurement Rate
- Advice 2294-G-B, Supplemental: Request to Increase Incentive Amount for SDG&E, SoCalGas, SCE and PG&E for their California Advanced Home Program
- Advice 2293-G, Revisions to Gas Consulting Services Agreement (Form 143-002)
- Advice 2292-G, Request to Establish the Master Meter Balancing Account (MMBA) Pursuant to Decision (D.) 14-03-021
- Advice 2291-G, Revision of the Cross-Over Rate Effective May 10, 2014
- Advice 2290-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2289-G, Revision of the Core Procurement Rate Effective May 1, 2014
- Advice 2288-G, April 2014 Buyback Rate
- Advice 2287-G, Request for Approval of Gas & Electric Form 101-01073, Notice of Shut-off (Mailed)
- Advice 2286-G, March 2014 Standby Procurement Rate
- Advice 2285-G, Revision of the Cross-Over Rate Effective April 10, 2014
- Advice 2284-G, Daily Balancing Standby Rates for March 2014
- Advice 2283-G, Modifications to Electric and Gas Rule 17, Meter Reading
- Advice 2282-G, Revision of the Core Procurement Rate Effective April 1, 2014
- Advice 2281-G, March 2014 Buyback Rate
- Advice 2280-G, Notification of the Creation of New Affiliates
- Advice 2279-G, Update to Sample Forms to Reflect the Revised Operations of the Customer Contact Center
- Advice 2278-G, February 2014 Standby Procurement Rate
- Advice 2277-G, Revision of the Cross-Over Rate Effective March 10, 2014
- Advice 2275-G, Daily Balancing Standby Rates for February 2014
- Advice 2274-G, Revision to the Core Procurement Rate Effective March 1, 2014
- Advice 2273-G, February 2014 Buyback Rate
- Advice 2272-G, January 2014 Standby Procurement Rate
- Advice 2271-G-A, Supplemental- Revisions to Rule 30, Transportation of Customer-Owned Gas, to Incorporate Biomethane Constituents of Concern, Concentration Standards, the Monitoring, Testing, Reporting and Recordkeeping Requirements in Compliance with Decision 14-01-034
- Advice 2270-G, Revision of the Cross-Over Rate Effective February 10, 2014
- Advice 2269-G, Daily Balancing Standby Rates for January 2014
- Advice 2268-G, Notification of the Creation of New Affiliates
- Advice 2267-G, Revision of the Core Procurement Rate Effective February 1, 2014
- Advice 2266-G, January 2014 Buyback Rate
- Advice 2265-G, Annual Joint Tier 2 Advice Letter Submitting Updated List of Proposed Categorical Eligible Low Income Programs for the Upcoming Year in Compliance with Decision 12-08-044
- Advice 2264-G, December 2013 Standby Procurement Rate
- Advice 2263-G, Basic Ordering Agreements between SDG&E and the United States Government
- Advice 2262-G, Daily Balancing Standby Rates for December 2013
- Advice 2261-G, Revision of the Cross-Over Rate Effective January 10, 2014
- Advice 2260-G, Revision of the Core Procurement Rate Effective January 1, 2014
- Advice 2259-G, December 2013 Buyback Rate
- Advice 2258-G, Consolidated Gas Rate Changes Effective January 1, 2014
- Advice 2257-G, November 2013 Standby Procurement Rate
- Advice 2256-G, Request to Tariff San Diego Gas & Electric Company's Customer Information Service Request (CISR) Form for Both Gas and Electric Services (New Form 185-1000)
- Advice 2255-G-A, Supplemental Fling - Establishment of Electric and Gas Rule 43, On-Bill Repayment (OBR) Tariff in Compliance with Decision 13-09-044
- Advice 2255-G, Establishment of Electric and Gas Rule 43, On-Bill Repayment (OBR) Tariff in Compliance with Decision 13-09-044
- Advice 2253-G, Joint IOU Filing - Implementation of Energy Efficiency (EE) Finance Program On-Bill Repayment (OBR) Pilots in Compliance with Decision (D.) 13-09-044
- Advice 2252-G, Joint IOU Filing - Submission of Energy Efficiency (EE) Program Final Report of the “Data Working Group” in Compliance with Ordering Paragraph (OP) 13c of Decision (D.) 13-09-044
- Advice 2251-G-A, Supplemental: Notificationof the Creation of New Affiliates
- Advice 2251-G, Notification of the Creation of New Affiliates
- Advice 2250-G, Daily Balancing Standby Rates for November 2013
- Advice 2249-G, Revision of the Cross-Over Rate Effective December 10, 2013
- Advice 2248-G, Revision to the Core Procurement Rate Effective December 1, 2013
- Advice 2247-G, November 2013 Buyback Rate
- Advice 2246-G, Revisions to the CARE Income Levels and Eligibility Forms to Comply with the Requirements of Assembly Bill 327
- Advice 2245-G, Creation of a New Navy Master Utility Services Contract with SDG&E
- Advice 2244-G, October 2013 Standby Procurement Rate
- Advice 2243-G, Joint IOU Filing - Implementation of Energy Efficiency Finance Program Fast Track Pilots in Compliance with Decision 13-09-044
- Advice 2242-G, Increase of the Income Tax Component of Contributions and Advances Provision
- Advice 2241-G, Test Year 2012 General Rate Case (GRC) Revenue Rquirement Modifications Pursuant to D.13-10-027
- Advice 2240-G, Joint IOU Filing: Request for Approval of New, Emerging Lighting Equipment to be Included in 2013-2014 On-Bill Financing Programs in Compliance with Decision 13-09-044
- Advice 2239-G, Revision to the Cross-Over Rate Effective November 10, 2013
- Advice 2238-G, Joint IOU Filing: Low-Income Customer Data Sharing With Water Utilities
- Advice 2237-G, Annual Regulatory Account Balance Update for Rates Effective January 1, 2014
- Advice 2236-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2014
- Advice 2235-G, Revision to the Core Procurement Rate Effective November 1, 2013
- Advice 2234-G, October 2013 Buyback Rate
- Advice 2233-G, September 2013 Standby Procurement Rate
- Advice 2232-G, Revision to the Cross-Over Rate Effective October 10, 2013
- Advice 2231-G, Notification of the Creation of New Affiliates
- Advice 2230-G, Revision to the Core Procurement Rate Effective October 1, 2013
- Advice 2229-G, September 2013 Buyback Rate
- Advice 2228-G, Request of San Diego Gas and Electric Company for its 2011 Eenergy Efficiency Incentive Award in Compliance with Decision 12-12-032
- Advice 2227-G, August 2013 Standby Procurement Rate
- Advice 2226-G, Revision to the Cross-Over Rate Effective September 10, 2013
- Advice 2225-G, Joint IOU Filing: Request of IOUs for HVAC Code Compliance Incentive Program to Encourage To-Code Installations of Residential Heating, Ventilation and Air Conditioning Equipment in Compliance with Decision 12-11-015
- Advice 2224-G-A, Partial Supplemental - San Diego Gas & Electric Company's Proposed California Alternate Rates for Energy Long Term Probability Model
- Advice 2224-G, San Diego Gas & Electric Company's Proposed California Alternate Rates for Energy Long Term Probability Model
- Advice 2223-G, Revision to the Core Procurement Rate Effective September 1, 2013
- Advice 2222-G, August 2013 Buyback Rate
- Advice 2221-G, July 2013 Standby Procurement Rate
- Advice 2220-G-A, Partial Supplemental: Clean-Up Filing to Revise Gas and Electric Tariffs
- Advice 2220-G, Clean-Up Filing to Revise Gas and Electric Tariffs
- Advice 2219-G, Revision to the Cross-Over Rate Effective August 10, 2013
- Advice 2218-G, Revisions to the Core Procurement Rate Effective August 1, 2013
- Advice 2217-G, July 2013 Buyback Rate
- Advice 2216-G, Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Rule 15
- Advice 2215-G, June 2013 Standby Procurement Rate
- Advice 2214-G, Revision of Gas and Electric Medical Baseline Forms
- Advice 2213-G, Revision to the CARB Fee Credit Language in Noncore Gas Rate Schedules
- Advice 2212-G, Revision to the Cross-Over Rate Effective July 10, 2013
- Advice 2211-G, Notification of the Creation of New Affiliates
- Advice 2210-G-A, Supplemental Data and Updates on Program Design and EM&V Request of SDG&E, SCG, SCE and PG&E for Upstream Incentive Program for Distributors of Residential Heating, Ventilation and Air Conditioning Equipment in Compliance with Decision 12-11-015
- Advice 2210-G, Request of SDG&E, SoCalGas, SCE and PG&E for Upstream Incentive Program for Distributors of Residential Heating, Ventilation and Air Conditioning Equipment in Compliance with Decision 12-11-015
- Advice 2209-G, Publication of San Diego Gas and Electric's 2013 Open Season Results
- Advice 2208-G, Revisions to the Core Procurement Rate Effective July 1, 2013
- Advice 2207-G, June 2013 Buyback Rate
- Advice 2206-G, 2013 Affiliate Transactions Compliance Plan
- Advice 2205-G, Establishment of the New Environmental Regulatory Balancing Account (NERBA) Pursuant to Decision 13-05-010
- Advice 2204-G-A, Partial Supplemental: Establishment of the following Balancing Accounts: Energy Storage (ESBA); Post 2011 Distribution Integrity Management Program (P-11 DIMPBA); and Transmission Inegreity Management Program (TIMPBA), and Revisions to Existing Accounts
- Advice 2204-G, Establishment of the following Balancing Accounts: Energy Storage (ESBA); Post 2011 Distribution Integrity Management Program (P-11 DIMPBA); and Transmission Inegreity Management Program (TIMPBA), and Revisions to Existing Accounts Pursuant to D.13-05-010
- Advice 2203-G, May 2013 Standby Procurement Rate
- Advice 2202-G, Revision to the Cross-Over Rate Effective June 10, 2013
- Advice 2201-G-A, Supplemental Joint IOU Filing - Request of PG&E, SDG&E, SoCalGas, and SCE to Adopt Short Term Program Performance Metric (PPM) Targets for 2013-2014 Statewide Energy Efficiency Programs
- Advice 2200-G, Revisions to the Core Procurement Rate Effective June 1, 2013
- Advice 2199-G, May 2013 Buyback Rate
- Advice 2198-G-A, Supplemental Filing: Test-Year 2012 General Rate Case (GRC) Rates Implementation Effective September 1, 2013
- Advice 2197-G, Implementation of Gas Transportion Rates Resulting From SoCalGas’ 2012 General Rate Case Filing for Rates Effective June 1, 2013, Pursuant to Decision 13-05-010
- Advice 2196-G, April 2013 Standby Procurement Rate
- Advice 2195-G, Revisions to the Cross-Over Rate Effective May 10, 2013
- Advice 2194-G, Revision of CARE and FERA Inocme Levels and Eligibility Forms
- Advice 2193-G, Revisions to the Core Procurement Rate Effective May 1, 2013
- Advice 2192-G, April 2013 Buyback Rate
- Advice 2191-G, March 2013 Standby Procurement Rate
- Advice 2190-G, Modifications to Cost of Capital Mechanism Pursuant to Decision (D.) 13-03-015
- Advice 2189-G, Notification of the Creation of New Affiliates
- Advice 2188-G, Revisions to the Cross-Over Rate Effective April 10, 2013
- Advice 2187-G, Daily Balancing Standby Rates for March 2013
- Advice 2186-G, PG&E, SCE, SDG&E and SoCalGas Informational Advice Letter Detailing Innovative Residential New Construction Program Designs Pursuant to Decision 12-05-015
- Advice 2185-G-A, Supplemental: SDG&E, SCE, SoCalGas, and PG&E, SoCalREN and BayREN's Request for Energy Upgrade California Program Enhanced Basic Path Pursuant to Decision 12-11-015
- Advice 2185-G, SDG&E, SCE, SoCalGas, and PG&E, Southern California and San Francisco Bay Area Regional Energy Networks’ Request for Energy Upgrade California Program Enhanced Basic Path Pursuant to Decision 12-11-015
- Advice 2184-G, Revisions to the Core Procurement Rate Effective April 1, 2013
- Advice 2183-G, March 2013 Buyback Rate
- Advice 2182-G, February 2013 Standby Procurement Rate
- Advice 2181-G, Revisions to the Cross-Over Rate Effective March 10, 2013
- Advice 2180-G, Daily Balancing Standby Rates for February 2013
- Advice 2179-G, Revisions to the Core Procurement Rate Effective March 1, 2013
- Advice 2178-G, February 2013 Buyback Rate
- Advice 2177-G, Basic Ordering Agreements between SDG&E and the United States Government
- Advice 2176-G, January 2013 Standby Procurement Rate
- Advice 2175-G, Revisions to the Format of the Credit Fee Associated with the Recovery of Assembly Bill 32 Implementation Fee
- Advice 2174-G, Revisions to the Cross-Over Rate Effective February 10, 2013
- Advice 2173-G, Daily Balancing Standby Rates for January 2013
- Advice 2172-G, Revisions to the Core Procurement Rate Effective February 1, 2013
- Advice 2171-G, January 2013 Buyback Rate
- Advice 2169-G, December 2012 Standby Procurement Rate
- Advice 2168-G, Notification of the Creation of New Affiliates
- Advice 2167-G-B, Partial Supplemental - SDG&E’s 2013-2014 Energy Efficiency Compliance Filing Pursuant to Decision 12-11-015
- Advice 2167-G-A, Partial Supplemental - SDG&E’s 2013-2014 Energy Efficiency Compliance Filing Pursuant to Decision 12-11-015
- Advice 2167-G, SDG&E's 2013-2014 Energy Efficiency Compliance Filing Pursuant to Decision 12-11-015
- Advice 2166-G, Areawide Public Utility Contract for Electric Services, Natural Gas Services, Regulated Energy Management Services, and Services Under CPUC-Approved Contracts; Contract No. GS-OOP-10-BSD-0801, Modified 11/15/12, Between the US Government and SDG&E
- Advice 2165-G, Revisions to the Cross-Over Rate Effective January 10, 2013
- Advice 2164-G, Daily Balancing Standby Rates for December 2012
- Advice 2163-G, Reduction of the Income Tax Component of Contributions and Advances Provision
- Advice 2162-G, Revisions to the Core Procurement Rate Effective January 1, 2013
- Advice 2161-G, December 2012 Buyback Rate
- Advice 2160-G-A, Partial Supplemental Filing - Consolidated Gas Rate Changes Effective January 1, 2013
- Advice 2160-G, Consolidated Gas Rate Changes Effective January 1, 2013
- Advice 2159-G, November 2012 Standby Procurement Rate
- Advice 2158-G, Self-Generation Incentive Program (SGIP) Carryover Funding not yet included in Rates
- Advice 2157-G, Modification of Gas and Electric Tariffs in Compliance with Decisions (D) 11-07-056, 12-08-045 and Resolution E-4535
- Advice 2156-G, Revisions to the Cross-Over Rate Effective December 10, 2012
- Advice 2155-G, Daily Balancing Standby Rates for November 2012
- Advice 2154-G-A, Supplement to Advice Letters 2818-E, 4145-E, and 2426-E/2154-G Regarding Home Area Network Device Interoperability Validation Requirements, Testing Process and Eligibility Criteria
- Advice 2154-G, Joint filing -- Home Area Network device interoperability validation requirements and testing process and the eligibility criteria
- Advice 2153-G, Revisions to the Core Procurement Rate Effective December 1, 2012
- Advice 2152-G, November 2012 Buyback Rate
- Advice 2151-G, October 2012 Standby Procurement Rate
- Advice 2150-G, Implementation of a Credit Fee Associated with the Recovery of Assembly Bill 32 Implementation Fee Pursuant to Decision 12-10-044
- Advice 2149-G, Establishment of Form 132-6263/2, On-Bill Financing Loan Agreement for California State Government Customers
- Advice 2148-G, Revisions to the Cross-Over Rate Effective November 10, 2012
- Advice 2147-G-A, Supplemental -- Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2013
- Advice 2147-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2013
- Advice 2146-G, Annual Regulatory Account Balance Update for Rates Effective January 1, 2013
- Advice 2145-G, Revisions to the Core Procurement Rate Effective November 1, 2012
- Advice 2144-G, October 2012 Buyback Rate
- Advice 2143-G, September 2012 Standby Procurement Rate
- Advice 2142-G, Notification of the Creation of New Affiliates
- Advice 2141-G, Increase of the Income Tax Component of Contributions and Advances Provision
- Advice 2140-G, Request for Approval to Change One of the Indices Used to Calculate the Core Procurement Cross-Over Rate
- Advice 2139-G, Revisions to the Cross-Over Rate Effective October 10, 2012
- Advice 2138-G, Revisions to the Core Procurement Rate Effective October 1, 2012
- Advice 2137-G, September 2012 Buyback Rate
- Advice 2136-G, August 2012 Standby Procurement Rate
- Advice 2135-G, Revisions to Gas and Electric Rewards and Penalties Balancing Accounts (RPBA) in Compliance with Resolution G-3456
- Advice 2134-G, Revisions to the Cross-Over Rate Effective September 10, 2012
- Advice 2133-G, Revisions to the Core Procurement Rate Effective September 1, 2012
- Advice 2132-G, August 2012 Buyback Rate
- Advice 2131-G, July 2012 Standby Procurement Rate
- Advice 2130-G, Revisions to the Cross-Over Rate Effective August 10, 2012
- Advice 2129-G, Revisions to the Core Procurement Rate Effective August 1, 2012
- Advice 2128-G, July 2012 Buyback Rate
- Advice 2127-G, Notification of the Creation of New Affiliates
- Advice 2126-G, June 2012 Standby Procurement Rate
- Advice 2125-G, Revisons to the Cross-Over Rate Effective July 10, 2012
- Advice 2124-G, Revisions to the 2012 - 2014 Energy Savings Assistance Program Memorandum Account (ESAPMA) Pursuant to Decision 12-06-030
- Advice 2123-G, Revisions to the Core Procurement Rate Effective July 1, 2012
- Advice 2122-G, June 2012 Buyback Rate
- Advice 2121-G, 2012 Affiliate Transactions Compliance Plan
- Advice 2120-G, May 2012 Standby Procurement Rate
- Advice 2119-G, Revisions to the Cross-Over Rate Effective June 10, 2012
- Advice 2118-G, Revisions to the Core Procurement Rate Effective June 1, 2012
- Advice 2117-G, May 2012 Buyback Rate
- Advice 2116-G, April 2012 Standby Procurement Rate
- Advice 2115-G, Revison of CARE and FERA Income Levels and Eligibility Forms
- Advice 2114-G, Notification of the Creation of New Affiliates
- Advice 2113-G, Revisions to the Cross-Over Rate Effective May 10, 2012
- Advice 2112-G, Distribution PBR Safety Performance for 2011
- Advice 2111-G, Revisions to the Core Procurement Rate Effective May 1, 2012
- Advice 2110-G, April 2012 Buyback Rate
- Advice 2109-G-B, Additional Partial Supplemental -- Establishment of Gas & Electric Smart Meter Opt-Out Tariff Schedules in Compliance with Ordering Paragraph (OP) #2 of Decision (D) 12-04-019
- Advice 2108-G, March 2012 Standby Procurement Rate
- Advice 2107-G, Establishment of Gas & Electric Smart Meter Opt-Out Memorandum Accounts (SMOMA) in Compliance with Ordering Paragraph (OP) 2d of Decision (D) 12-04-019
- Advice 2106-G, Establishment of the Pipeline Safety and Reliability Memorandum Account (PSRMA) Pursuant to Decision 12-04-021
- Advice 2105-G, Revisions to the Cross-Over Rate Effective April 10, 2012
- Advice 2104-G, Daily Balancing Standby Rates for March 2012
- Advice 2103-G, Revisions to the Core Procurement Rate Effective April 1, 2012
- Advice 2102-G, March 2012 Buyback Rate
- Advice 2101-G, Clean-Up Filing to Revise the Electric and Gas Regulatory Accounts
- Advice 2100-G, February 2012 Standby Procurement Rate
- Advice 2099-G, Notification of the Creation of New Affiliates
- Advice 2098-G, Revisions to the Cross-Over Rate Effective March 10, 2012
- Advice 2097-G, Daily Balancing Standby Rates for February 2012
- Advice 2096-G, Revisions to the Core Procurement Rate Effective March 1, 2012
- Advice 2095-G, February 2012 Buyback Rate
- Advice 2094-G, January 2012 Standby Procurement Rate
- Advice 2093-G, Revisions of the Cross-Over Rate Effective February 10, 2012
- Advice 2092-G, Daily Balancing Standby Rates for January 2012
- Advice 2091-G, Revisions to the Core Procurement Rate Effective February 1, 2012
- Advice 2090-G, January 2012 Buyback Rate
- Advice 2089-G, Request to Collect Self-Generation Incentive Program (SGIP) Carryover Funding not yet included in rates
- Advice 2088-G, December 2011 Standby Procurement Rate
- Advice 2087-G, Gas Thermal Zone and Map Update and Revisions to Gas Rule 2
- Advice 2086-G, Revisions of the Cross-Over Rate Effective January 10, 2012
- Advice 2085-G, Daily Balancing Standby Rates for December 2011
- Advice 2084-G, Revisions to the Core Procurement Rate Effective January 1, 2012
- Advice 2083-G, December 2011 Buyback Rate
- Advice 2082-G, Consolidated Gas Rate Changes Effective January 1, 2012
- Advice 2081-G-B, Second Supplemental -- Joint Filing Request to Implement a Multi-Family Energy Upgrade Pilot Within the 2010-2012 Energy Efficiency Portfolio
- Advice 2080-G, November 2011 Standby Procurement Rate
- Advice 2079-G, Notification of the Creation of New Affiliates
- Advice 2078-G, Increase of the Income Tax Component of Contributions and Advances Provision
- Advice 2077-G, Revisions to the Cross-Over Rate Effective December 10, 2011
- Advice 2076-G, Daily Balancing Standby Rates for November 2011
- Advice 2075-G, Revisions of the Core Procurement Rate Effective December 1, 2011
- Advice 2074-G, November 2011 Buyback Rate
- Advice 2073-G, October 2011 Standby Procurement Rate
- Advice 2072-G, Establishment of the 2012-2014 Energy Savings Assistance Programs Memo Account (ESAPMA) Pursuant to Decision (D.) 11-11-010
- Advice 2071-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2012
- Advice 2070-G, Revisions to the Cross-Over Rate Effective November 10, 2011
- Advice 2069-G, Revisions to the Core Procurement Rate Effective November 1, 2011
- Advice 2068-G, October 2011 Buyback Rate
- Advice 2067-G, Annual Regulatory Account Balance Update for Rates Effective January 1, 2012
- Advice 2066-G, September 2011 Standby Procurement Rate
- Advice 2065-G, Revisions of the Cross-Over Rate Effective October 10, 2011
- Advice 2064-G, Revisions to the Core Procurement Rate Effective October 1, 2011
- Advice 2063-G, September 2011 Buyback Rate
- Advice 2062-G, Additional Areas of Contamination at South Bay Power Plant (City of Chula Vista) to be Incorporated into the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 2061-G, Notification of the Creation of New Affiliates
- Advice 2060-G, August 2011 Standby Procurement Rate
- Advice 2059-G, Request for 2010-2012 Energy Efficiency Program Modifications and Fund Shifting Approval
- Advice 2058-G, Revisions of the Cross-Over Rate Effective September 10, 2011
- Advice 2057-G, Revisions to the Core Procurement Rate Effective September 1, 2011
- Advice 2056-G, August 2011 Buyback Rate
- Advice 2055-G, Backbone Transportation Service (BTS) Rate Implementation
- Advice 2054-G, July 2011 Standby Procurement Rate
- Advice 2053-G, Revisions of the Cross-Over Rate Effective August 10, 2011
- Advice 2052-G, July 2011 Buyback Rate
- Advice 2051-G, Revision of the Core Procurement Rates Effective August 1, 2011
- Advice 2050-G, June 2011 Standby Procurement Rate
- Advice 2049-G, Modifications to Advanced Metering Infrastructure Balancing Accoung (AMIBA)
- Advice 2048-G, Revisions of the Cross-Over Rate Effective July 10, 2011
- Advice 2047-G, Revision of the Core Procurement Rates Effective July 1, 2011
- Advice 2046-G, June 2011 Buyback Rate
- Advice 2045-G, 2011 Affiliate Transactions Compliance Plan
- Advice 2044-G, Publication of San Diego Gas & Electric's 2011 Open Season Results
- Advice 2043-G, May 2011 Standby Procurement Rate
- Advice 2042-G, Revisions of the Cross-Over Rates Effective June 10, 2011
- Advice 2041-G-B, Additional Supplemental Joint Filing: 2010-2012 Statewide Workforce Education and Training (WE&T) Program Modifications based on Findings of WE&T Needs Assessment
- Advice 2040-G, Notification of the Creation of New Affiliates
- Advice 2039-G, Revision of the Core Procurement Rates Effective June 1, 2011
- Advice 2038-G, May 2011 Buyback Rate
- Advice 2037-G-A, Partial Supplemental -- Modification of Tariffs Updating Firm Access Rights Service and Rates
- Advice 2037-G, Modification of Tariffs Updating Firm Access Rights Service and Rates
- Advice 2036-G, April 2011 Standby Procurement Rate
- Advice 2035-G, Revision of CARE and FERA Income Levels and Eligibility Forms
- Advice 2034-G, Revision of the Cross-Over Rates Effective May 10, 2011
- Advice 2033-G, Revision of the Core Procurement Rates Effective May 1, 2011
- Advice 2032-G, Modification to San Diego Gas & Electric Collection Notices
- Advice 2031-G, April 2011 Buyback Rate
- Advice 2030-G, Distribution PBR Safety Performance for 2010
- Advice 2029-G, Engagement of GL Noble Denton, Inc. to Review the Results of the System Expansion Study
- Advice 2028-G, March 2011 Standby Procurement Rate
- Advice 2027-G, Modification of Rule 7 Pursuant to Decision (D.) 10-12-051
- Advice 2026-G, Revision of the Cross-Over Rates Effective April 10, 2011
- Advice 2025-G, Daily Balancing Standby Rates for March 2011
- Advice 2024-G, Revision of the Core Procurement Rates Effective April 1, 2011
- Advice 2023-G-A, Supplemental Filing - Establishment of the General Rate Case (GRC) Memorandum Account
- Advice 2022-G, March 2011 Buyback Rate
- Advice 2021-G, Revisions to Medical Baseline Allowance Forms
- Advice 2020-G, February 2011 Standby Procurement Rate
- Advice 2019-G, Notification of the Creation of New Affiliates
- Advice 2018-G, Revision of the Cross-Over Rates Effective March 10, 2011
- Advice 2017-G, Daily Balancing Standby Rates for February 2011
- Advice 2016-G, Revision of the Core Procurement Rates Effective March 1, 2011
- Advice 2015-G, February 2011 Buyback Rate
- Advice 2014-G, January 2011 Standby Procurement Rate
- Advice 2013-G, Notification of the Creation of New Affiliates
- Advice 2012-G, Revision of the Cross-Over Rates Effective February 10, 2011
- Advice 2011-G, Daily Balancing Standby Rates for January 2011
- Advice 2010-G, Revision of the Core Procurement Rates Effective February 1, 2011
- Advice 2009-G, January 2011 Buyback Rate
- Advice 2008-G, December 2010 Standby Procurement Rate
- Advice 2007-G, Modification of Rule 7, Rule 11 and the Disconnect Memorandum Account (DMA) Pursuant to Decision (D.) 10-12-051
- Advice 2006-G, Revision of the Cross-Over Rates Effective January 10, 2011
- Advice 2005-G, Daily Balancing Standby Rates for December 2010
- Advice 2004-G, Revision of the Core Procurement Rates Effective January 1, 2011
- Advice 2003-G, December 2010 Buyback Rate
- Advice 2002-G, Consolidated Gas Rate Changes Effective January 1, 2011
- Advice 2001-G, Revision to Tariff Rules for Small Business Customers Pursuant to D.10-10-032
- Advice 2000-G-A, Partial Supplemental - Reduction of the Income Tax Component of Contributions and Advances Provision
- Advice 2000-G, Reduction of the Income Tax Component of Contributions and Advances Provision
- Advice 1999-G, Request to Establish a Natural Gas Appliance Testing (NGAT) Memorandum Account in Compliance with D.08-11-031 and D.10-12-002
- Advice 1998-G, November 2010 Standby Procurement Rate
- Advice 1997-G, Establishment of a New Memorandum Account for Tracking of Assembly Bill (AB) 32 Administrative Fees Pursuant to Decision (D.) 10-12-026
- Advice 1996-G, Revision of the Cross-Over Rates Effective December 10, 2010
- Advice 1995-G, Daily Balancing Standby Rates for November 2010
- Advice 1994-G, Contract Between SDG&E and United States Government for Infrastructure Improvement Project Managment
- Advice 1993-G, Revision of the Core Procurement Rates Effective December 1, 2010
- Advice 1992-G, November 2010 Buyback Rate
- Advice 1990-G, October 2010 Standby Procurement Rate
- Advice 1989-G-A, Supplemental: Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges in Rule 15
- Advice 1988-G, Notification of the Creation of New Affiliates
- Advice 1987-G, Revisions to the California Solar Initiative Thermal Program Memorandum Account (CSITPMA)
- Advice 1986-G, Revision of the Cross-Over Rates Effective November 10, 2010
- Advice 1985-G, Annual Gas Regulatory Account Update Effective January 1, 2011
- Advice 1984-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2011
- Advice 1983-G, Revision of the Core Procurement Rates Effective November 1, 2010
- Advice 1982-G, October 2010 Buyback Rate
- Advice 1981-G, September 2010 Standby Procurement Rate
- Advice 1980-G, Clean-up Filing to Revise Electric and Gas Tariffs
- Advice 1979-G, Revision of the Cross-Over Rate Effective October 10, 2010
- Advice 1978-G, Reduction of the Income Tax Component of Contributions and Advances Provision
- Advice 1977-G, Revision of the Core Procurement Rates Effective October 1, 2010
- Advice 1976-G, September 2010 Buyback Rate
- Advice 1975-G, August 2010 Standby Procurement Rate
- Advice 1974-G, Revision of the Cross-Over Rate Effective September 10, 2010
- Advice 1973-G, Revision of the Core Procurement Rates Effective September 1, 2010
- Advice 1972-G, August 2010 Buyback Rate
- Advice 1971-G, Revisions to Electic and Gas Rules 6, 7, and 11 in Compliance with Decision 10-07-048
- Advice 1970-G, July 2010 Standby Procurement Rate
- Advice 1969-G, Revision of the Cross-Over Rate Effective August 10, 2010
- Advice 1968-G, Revision of the Core Procurement Rates Effective August 1, 2010
- Advice 1967-G, July 2010 Buyback Rate
- Advice 1966-G, June 2010 Standby Procurement Rate
- Advice 1965-G, Revision of the Cross-Over Rate Effective July 10, 2010
- Advice 1964-G, Notification of the Creation of New Affiliates
- Advice 1963-G, Revision of Gas Tariff Schedule G-IMB
- Advice 1962-G, 2010 Affiliate Transactions Compliance Plan
- Advice 1961-G, Revision of the Core Procurement Rates Effective July 1, 2010
- Advice 1960-G, June 2010 Buyback Rate
- Advice 1959-G, Notification of the Creation of New Affiliates
- Advice 1958-G, May 2010 Standby Procurement Rate
- Advice 1957-G, Request for Authorization to Establish a Mover Services Program on a Non-Tariffed Basis
- Advice 1956-G, Withdrawal of Schedule G-FIG and Form 122-1003 Fiber Optic Cable in Gas Pipelines
- Advice 1955-G, Revision of the Cross-Over Rate Effective June 10, 2010
- Advice 1954-G, Revision of the Core Procurement Rates Effective June 1, 2010
- Advice 1953-G, May 2010 Buyback Rate
- Advice 1952-G-A, Supplement - Revision of Tenant Notification Change and Submission of the Revised Notice to Tenants Termination of Electric and Gas Service Form in Compliance with PU Code Section 777 and 777.1
- Advice 1951-G, Utilities’ 2010-2012 Energy Efficiency Program Performance Metrics Advice Letter for Statewide Programs and Associated Sub-programs and Other Required Program Documentation
- Advice 1950-G, April 2010 Standby Procurement Rate
- Advice 1949-G, Revision of the CARE and FERA Income Levels and Eligibility Forms
- Advice 1948-G, Revision of the Cross-Over Rate Effective May 10, 2010
- Advice 1947-G, Distribution PBR Safety Performance for 2009
- Advice 1946-G, Revision of the Gas Procurement Rates Effective May 1, 2010
- Advice 1945-G, April 2010 Buyback Rate
- Advice 1944-G, Establishment of the California Solar Initiative Thermal Program Sub-Account in the Electric California Solar Intiative Balancing Account (CSIBA)and the Establishment of the California Solar Initiative Thermal Program Memorandum
Account (CSITPMA) for Gas
- Advice 1943-G, March 2010 Standby Procurement Rate
- Advice 1942-G, Revison of the Cross-Over Rate Effective April 10, 2010
- Advice 1941-G, Daily Balancing Standby Rates for March 2010
- Advice 1940-G, Revision of the Gas Procurement Rates Effective April 1, 2010
- Advice 1939-G, March 2010 Buyback Rate
- Advice 1938-G, February 2010 Standby Procurement Rate
- Advice 1937-G-A, Supplemental Filing: Request to Create New Program to Leverage Federal Stimulus Money from Temporary Assistance for Needy Families Emergency Fund for Utility Bill Assistance
- Advice 1936-G, Revision of the Cross-Over Rate Effective March 10, 2010
- Advice 1935-G, Daily Balancing Standby Rates for February 2010
- Advice 1934-G-A, Supplemental Filing -- Local Government Partnership Strategic Plan Proposals in Compliance with Decision 09-09-047
- Advice 1933-G, Revision of the Gas Procurement Rates Effective March 1, 2010
- Advice 1932-G, February 2010 Buyback Rate
- Advice 1931-G, January 2010 Standby Procurement Rate
- Advice 1930-G, Allocation of the Proceeds Associated with the Sempra Settlement and Price Indexing Case Settlements
- Advice 1929-G, Establishment of the Disconnect Memorandum Account (DMA) in Compliance with Rulemaking (R.) 10-02-005
- Advice 1928-G-A, Partial Supplemental: Revision of the Cross-Over Rate Effective February 10, 2010
- Advice 1928-G, Revision of the Cross-over Rate Effective February 10, 2010
- Advice 1927-G, Daily Balancing Standby Rates for January 2010
- Advice 1926-G-A, Supplement to Implementation of Prescriptive Whole House Retrofit Program in Compliance with D.09-09-047
- Advice 1925-G-A, Supplemental Filing: Submission of Self-Generation Incentive Program (SGIP) Data Pursuant to Decision (D.)09-12-047
- Advice 1925-G, Submission of Self-Generation Incentive Program (SGIP) Data Pursuant to Decision (D.)09-12-047
- Advice 1924-G-A, Partial Supplemental: Revision of the Gas Procurement Rates Effective February 1, 2010
- Advice 1924-G, Revision of the Gas Procurement Rates Effective February 1, 2010
- Advice 1923-G, January 2010 Buyback Rate
- Advice 1922-G, Request Authorization to Establish a Capitation Fee for Outreach to Potential Low Income Energy Efficiency Program Customers with Limited English Proficiency, Elderly, or Disabled and Who Are Successfully Enrolled in the Program
- Advice 1921-G-B, Supplemental Filing: Implementation of Statewide Integrated Demand Side Management (IDSM) Program in Compliance with D.09-09-047
- Advice 1920-G-C, Supplemental Filing: San Diego Gas & Electric's 2010-2012 Energy Efficiency Pilot Programs and Response to Ordering Pargraphs 11h and 20 in Compliance with D.09-09-047
- Advice 1919-G, December 2009 Standby Procurement Rate
- Advice 1918-G-A, Partial Supplemental: Consolidation of Rate Changes Implemented January 1, 2010 with SDG&E’S Biennial Cost Allocation Proceeding (BCAP) Phase 2 Settlement per Decision (D.) 09-11-006, Effective February 1, 2010
- Advice 1918-G, Consolidation of Rate Changes Implemented January 1, 2010 with SDG&E’S Biennial Cost Allocation Proceeding (BCAP) Phase 2 Settlement per Decision (D.) 09-11-006, Effective February 1, 2010
- Advice 1916-G, Revision of the Cross-Over Rate Effective January 10, 2010
- Advice 1915-G, Daily Balancing Standby Rates for December 2009
- Advice 1914-G, Revision of the Gas Procurement Rates Effective January 1, 2010
- Advice 1913-G, December 2009 Buyback Rate
- Advice 1912-G, Consolidated Gas Rate Changes Effective January 1, 2010
- Advice 1911-G, November 2009 Standby Procurement Rate
- Advice 1910-G, Daily Balancing Standby Rates for November 2009
- Advice 1909-G-A, Supplemental Advice Letter - Implementation of SDG&E's BCAP Phase 2 Settlement per D.09-11-006
- Advice 1909-G, Implementation of SDG&E's Biennial Cost Allocation Proceeding (BCAP) Phase 2 Settlement per Decision (D.) 09-11-006
- Advice 1908-G, Revision of the Cross-Over Rate Effective December 10, 2009
- Advice 1907-G, Increase of the Income Tax Component Of Contributions and Advances Provision
- Advice 1906-G, Revision of the Gas Procurement Rates Effective December 1, 2009
- Advice 1905-G, November 2009 Buyback Rate
- Advice 1904-G, October 2009 Standby Procurement Rate
- Advice 1903-G, San Diego Gas & Electric's 2010-2012 Energy Efficiency Compliance Filing
- Advice 1902-G, Notification of the Creation of New Affiliates
- Advice 1901-G, Establishment of the On-Bill Financing (OBF) Loan Pool and the On-Bill Financing Balancing Account (OBFBA)
- Advice 1900-G, Revision of the Cross-Over Rate Effective November 10, 2009
- Advice 1899-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2010
- Advice 1898-G, Revision of the Gas Procurement Rates Effective November 1, 2009
- Advice 1897-G, October 2009 Buyback Rate
- Advice 1896-G, Annual Gas Regulatory Account Update Effective January 1, 2010
- Advice 1895-G, September 2009 Standby Procurement Rate
- Advice 1894-G, Notification of the Creation of New Affiliates
- Advice 1893-G, Revision of the Cross-Over Rate Effective October 10, 2009
- Advice 1892-G, Revision of the Gas Procurement Rates Effective October 1, 2009
- Advice 1891-G, September 2009 Buyback Rate
- Advice 1890-G, Clean-up Filing to Revise the Electric and Gas Tariffs
- Advice 1889-G-A, Supplemental - Establishment of the Wildfire Expense Memorandum Account (WEMA)
- Advice 1888-G, Revisions to Pension Balancing Account (PBA) and Post-Retirement Benefits Other Than Pensions Balancing Account (PBOPBA) in compliance with Decision (D.) 09-09-011
- Advice 1887-G, August 2009 Standby Procurement Rate
- Advice 1886-G, Revisions to Gas Rule 30 - Transportation of Customer-Owned Gas
- Advice 1885-G, Revision of Cross-Over Rate Effective September 10, 2009
- Advice 1884-G, Revision of Gas Procurement Rates Effective September 1, 2009
- Advice 1883-G, August 2009 Buyback Rate
- Advice 1882-G, Publication of San Diego Gas & Electric's 2009 Open Season Results
- Advice 1881-G, July 2009 Standby Procurement Rate
- Advice 1880-G, Revision of Cross-Over Rate Effective August 10, 2009
- Advice 1879-G, Revision of Gas Procurement Rates Effective August 1, 2009
- Advice 1878-G, July 2009 Buyback Rate
- Advice 1877-G, Notification of the Creation of New Affiliates
- Advice 1875-G, June 2009 Standby Procurement Rate
- Advice 1874-G, Revision of Cross-Over Rate Effective July 10, 2009
- Advice 1873-G, 2009 Affiliate Transactions Compliance Plan
- Advice 1872-G, Revision of Gas Procurement Rates Effective July 1, 2009
- Advice 1871-G, June 2009 Buyback Rate
- Advice 1870-G, Addition of Emerson Street 2 Inch Steel Gas Pipeline (City of Chula Vista) to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1869-G, Addition of Broadway Street 4 Inch Steel Gas Pipeline (City of Chula Vista) to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1868-G, May 2009 Standby Procurement Rate
- Advice 1867-G, Revision of Cross-Over Rate Effective June 10, 2009
- Advice 1866-G, Revision of Gas Procurement Rates Effective June 1, 2009
- Advice 1865-G, May 2009 Buyback Rate
- Advice 1864-G, April 2009 Standby Procurement Rate
- Advice 1863-G, Gas Map Update and Related Tariff Modifications
- Advice 1862-G, Revised Application Forms and Instructions for the California Alternate Rates for Energy (CARE) and Family Energy Rate Assistance (FERA) Programs
- Advice 1861-G, Revision of Cross-Over Rate Effective May 10, 2009
- Advice 1860-G, Distribtuion PBR Performance for 2008
- Advice 1859-G, Revision of Gas Procurement Rates Effective May 1, 2009
- Advice 1858-G, April 2009 Buyback Rate
- Advice 1857-G, Notification of the Creation of New Affiliates
- Advice 1856-G, March 2009 Standby Procurement Rate
- Advice 1855-G, Revision of Cross-Over Rate Effective April 10, 2009
- Advice 1854-G, Daily Balancing Standby Rates for March 2009
- Advice 1853-G, Revision of Gas Procurement Rates Effective April 1, 2009
- Advice 1852-G, March 2009 Buyback Rate
- Advice 1851-G-B, Revision to Gas Rules 1 & 2; Add New Gas Rule 26
- Advice 1850-G, New Form – Notice to Tenants of Request For Termination of Electric and Gas Service
- Advice 1849-G, February 2009 Standby Procurement Rate
- Advice 1848-G, Daily Balancing Standby Rates for February 2009
- Advice 1847-G, Revision of Cross-Over Rate Effective March 10, 2009
- Advice 1846-G, Revision of Gas Procurement Rates Effective March 1, 2009
- Advice 1845-G, February 2009 Buyback Rate
- Advice 1844-G, January 2009 Standby Procurement Rate
- Advice 1843-G, Reduction to the Income Tax Component of Contributions and Advances Provision
- Advice 1842-G, Request Increased Funding for SDG&E's Neighbor-to-Neighbor (NTN) Customer Assistance Program
- Advice 1841-G, Revision to the On-Bill Financing (OBF) Loan Agreement Forms
- Advice 1840-G, Form Cleanup - Request for Retail Noncore Gas Service
- Advice 1839-G, Revision of Cross-Over Rate Effective February 10, 2009
- Advice 1838-G, Daily Balancing Standby Rates for January 2009
- Advice 1837-G, Revision of Gas Procurement Rates Effective February 1, 2009
- Advice 1836-G, January 2009 Buyback Rate
- Advice 1835-G, Addition of Paradise Marsh to the Electric & Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1834-G, Employment of Deficit Billing Practice Pursuant to SDG&E's Electric and Gas Rule 15
- Advice 1833-G, December 2008 Standby Procurement Rate
- Advice 1832-G, Daily Balancing Standby Rates for December 2008
- Advice 1831-G, Revision of Cross-Over Rate Effective January 10, 2009
- Advice 1830-G, Revisions to Gas and Electric Tariff Schedules in Compliance with Assembly Bill 2857
- Advice 1829-G, SDG&E 2009-11 Low Income Energy Efficiency Program and Budget Compliance Filing Pursuant to D.08-11-031
- Advice 1828-G, Revision of Gas Procurement Rates Effective January 1, 2009
- Advice 1827-G, December 2008 Buyback Rate
- Advice 1826-G, Consolidated Gas Rate Changes Effective January 1, 2009
- Advice 1825-G, November 2008 Standby Procurement Rate
- Advice 1824-G, Notification of the Creation of New Affiliates
- Advice 1823-G, Revisions to Rule 40, On-Bill Financing Program
- Advice 1822-G, Revision of Cross-Over Rate Effective December 10, 2008
- Advice 1821-G, Daily Balancing Standby Rates for November 2008
- Advice 1820-G, Increase of the Income Tax Component Of Contributions and Advances Provision
- Advice 1819-G, Revision of Gas Procurement Rates Effective December 1, 2008
- Advice 1818-G, November 2008 Buyback Rate
- Advice 1817-G, Revision of Standby Procurement Rate Effective October 31, 2008
- Advice 1816-G, Notification of Creation of New Affiliates
- Advice 1815-G, Informational Advice Letter-Reconcilation of the Benefits Portion of the Advanced Metering Infrastruction Revenue Requirement
- Advice 1814-G, Revision of Cross-Over Rate Effective November 10, 2008
- Advice 1812-G, Revision of Gas Procurement Rates Effective November 1, 2008
- Advice 1811-G, October 2008 Buyback Rate
- Advice 1810-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2009
- Advice 1809-G, Establishment of the Energy Efficiency 2009-2011 Memorandum Account (EEMA) in Compliance with D.08-10-027
- Advice 1808-G, Annual Gas Regulatory Account Update Effective January 1, 2009
- Advice 1807-G, Revision of Standby Procurement Rate Effective September 30, 2008.
- Advice 1806-G, Notification of Creation of New Affiliates
- Advice 1805-G, Revision of Cross-Over Rate Effective October 10, 2008
- Advice 1804-G, Revision of Gas Procurement Rates Effective October 1, 2008
- Advice 1803-G, September 2008 Buyback Rate
- Advice 1802-G, Gas Procurement PBR Year 15 Results
- Advice 1801-G, Revision of Standby Procurement Rate Effective August 31, 2008.
- Advice 1799-G, Modification of Performance Incentive Mechanisms Pursuant to Decision 08-07-046
- Advice 1798-G, Revision of Cross-Over Rate Effective September 10, 2008
- Advice 1797-G, Revision of Gas Procurement Rates Effective September 1, 2008
- Advice 1796-G, Firm Access Rights (FAR) Rate Implementation Filing
- Advice 1795-G, August 2008 Buyback Rate
- Advice 1794-G, Filing of New Residential Rate Assistance Forms
- Advice 1793-G, Revision of Standby Procurement Rate Effective July 31, 2008
- Advice 1792-G, Test Year 2008 General Rate Case (GRC) Rate Implementation Filing
- Advice 1791-G, Establishment and Modification of Regulatory Accounts and Performance Based Regulation Mechanism in Compliance with Decision (D) 08-07-046)
- Advice 1790-G, Revision of Cross-Over Rate Effective August 10, 2008
- Advice 1789-G, Revision of Gas Procurement Rates Effective August 1, 2008
- Advice 1787-G, July 2008 Buyback Rate
- Advice 1785-G, Revision of Standby Procurement Rate Effective June 30, 2008
- Advice 1784-G, Notification of the Creation of New Affiliates
- Advice 1783-G, Revision of Cross-Over Rate Effective July 10, 2008
- Advice 1782-G, Revisions to Electric and Gas Preliminary Statements In Compliance With D.08-05-035
- Advice 1781-G, Revision of Gas Procurement Rates Effective July 1, 2008
- Advice 1780-G, June 2008 Buyback Rate
- Advice 1779-G, 2008 Affiliate Transactions Compliance Plan
- Advice 1778-G, Revision of Standby Procurement Rate Effective May 31, 2008
- Advice 1777-G, Revision of Cross-Over Rate Effective June 10, 2008
- Advice 1776-G, Revision of Gas Procurement Rates Effective June 1, 2008
- Advice 1775-G, Notification of the Creation of New Affiliates
- Advice 1774-G, May 2008 Buyback Rate
- Advice 1773-G, Revision of Standby Procurement Rate Effective April 30, 2008
- Advice 1772-G, Tariff Integration: Revisions to Electric and Gas Rule 5
- Advice 1771-G, Revision of the CARE and FERA Imcome Levels and Eligibility Forms
- Advice 1770-G, Revision of Cross-Over Rate Effective May 10, 2008
- Advice 1769-G, Distribution PBR Performance Report for 2007
- Advice 1768-G, Revision of Gas Procurement Rates Effective May 1, 2008
- Advice 1767-G, April 2008 Buyback Rate
- Advice 1766-G, Revision of Standby Procurement Rate Effective March 31, 2008
- Advice 1765-G, Revision of Cross-Over Rate Effective April 10, 2008
- Advice 1764-G, Revision of Customer Forms
- Advice 1763-G, Daily Balancing Standby Rates for March 2008
- Advice 1762-G, Notification of the Creation of New Affiliates
- Advice 1761-G, Revision of Gas Procurement Rates Effective April 1, 2008
- Advice 1759-G, Revision of Standby Procurement Rate Effective February 11, 2008
- Advice 1758-G, Engagement of Advantica, Inc. To Review The Results of The System Expansion Study
- Advice 1757-G, Revision of Cross-Over Rate Effective March 11, 2008
- Advice 1756-G, Revision of Core and Noncore Gas Procurement Rates Effective March 11, 2008
- Advice 1755-G, Revision of Standby Procurement Rate Effective January 12, 2008
- Advice 1754-G, Reductions to the Income Tax Component of Contributions and Advances Provision
- Advice 1753-G, Revisions to Exhibit A of Consulting Services Agreement (Form 143-002)
- Advice 1752-G, Notification of the Creation of New Affiliates
- Advice 1751-G, Request to Present Gas CARE Discount as a Line Item on the Bill
- Advice 1750-G, Revision of Cross-Over Rate Effective February 11, 2008
- Advice 1749-G, Revision of Core and Noncore Gas Procurement Rates Effective February 11, 2008
- Advice 1748-G, Gas Procurement PBR Year 14 Results
- Advice 1747-G, Revision of Standby Procurement Rate Effective December 11, 2007
- Advice 1746-G, Request to Update CARE Forms for Categorical Eligibility
- Advice 1745-G, Modification of Tariffs in Compliance with D.07-12-019
- Advice 1744-G, Revision to Cross-Over Rate Effective January 12, 2008
- Advice 1743-G, Revision of Core and Noncore Gas Procurement Rates Effective January 12, 2008
- Advice 1742-G, Notification of the Creation of New Affiliates and Reclassification of Affiliates
- Advice 1741-G, Establishment of the General Rate Case (GRC) Revenue Requirement Memorandum Account Pursuant to D.07-12-053
- Advice 1740-G, Consolidated Gas Rate Changes Effective January 1, 2008
- Advice 1739-G, Core Portfolio Consolidation Implementation Pursuant to D.07-12-019
- Advice 1738-G, Revision of Standby Procurement Rate Effective November 11, 2007
- Advice 1737-G, Revision of Cross-Over Rate Effective December 11, 2007
- Advice 1736-G, Revision of Core and Noncore Gas Procurement Rates Effective December 11, 2007
- Advice 1735-G-A, Supplemental Filing - Revision of Rule Nos. 17 - Meter Reading and 18 - Meter Rests and Adjustment of Bills
- Advice 1734-G, Tariff Integration: Revisions to Schedule G-NGV
- Advice 1733-G, Revision of Standby Procurement Rate Effective October 9, 2007
- Advice 1732-G-A, Supplemental Filing: Revision of Residential Electric and Gas Line Extension Allowances and Ownership Charges In Compliance With Decision 07-07-019
- Advice 1731-G, Revision of Cross-Over Rate Effective November 11, 2007
- Advice 1730-G, Revision of Core and Noncore Gas Procurement Rates Effective November 11, 2007
- Advice 1729-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 2008
- Advice 1728-G, Annual Gas Regulatory Account Update Effective January 1, 2008
- Advice 1727-G, Revision of Standby Procurement Rate Effective September 12, 2007
- Advice 1726-G, Revision of Cross-Over Rate Effective October 9, 2007
- Advice 1725-G, Notification of the Creation of New Affiliates
- Advice 1724-G, Revision of Core and Noncore Gas Procurement Rates Effective October 9, 2007
- Advice 1723-G, Communication of SDG&E’s Tariff Sheet Numbering System Pursuant to Decision 07-01-024 and General Rule 8.4.3
- Advice 1722-G, Revisions to Electric and Gas Preliminary Statements - Elimination of Inactive Regulatory Accounts
- Advice 1721-G, Revision of Standby Procurement Rate Effective August 11, 2007
- Advice 1720-G, Revision of Cross-Over Rate Effective September 12, 2007
- Advice 1719-G, Revision of Core and Noncore Gas Procurement Rates Effective September 12, 2007
- Advice 1718-G, System Integration Transmission Rate Update Compliance Filing
- Advice 1717-G, Tariff Integration: Revisions to Rule 7 - Deposits
- Advice 1716-G, Revision of Standby Procurement Rate Effective July 11, 2007
- Advice 1715-G, Revision of Cross-Over Rate Effective August 11, 2007
- Advice 1714-G, Revision of Core and Noncore Gas Procurement Rates Effective August 11, 2007
- Advice 1713-G, Notification of the Creation of New Affiliates
- Advice 1712-G, Revisions to the 2006 Distribution PBR Performance Reward
- Advice 1711-G, Tariff Integration: Revisions to Electric and Gas Rule 9 - Rendering and Payment of Bills and Creation of Electric and Gas Rule 17 - Meter Reading
- Advice 1709-G, Revision of Standby Procurement Rate Effective June 11, 2007
- Advice 1708-G, Revision of Cross-Over Rate Effective July 11, 2007
- Advice 1707-G, Revision of Core and Noncore Gas Procurement Rates Effective July 11, 2007
- Advice 1706-G, Revision of Continuity of Service Agreement Forms
- Advice 1705-G, Filing of a New Residential Rate Assistance Application Form
- Advice 1704-G, Newly Designed Bill Format Proposal
- Advice 1703-G, Publication of Open Season Results for the Rainbow Corridor
- Advice 1702-G, 2007 Affiliate Transactions Compliance Plan
- Advice 1701-G, Revision of Standby Procurement Rate Effective May 9, 2007
- Advice 1700-G, Expedited Advice Letter For Canadian Capacity Contract Renewal – D.04-09-022
- Advice 1699-G, Revisions to the On-Bill Financing (OBF) Program and Related Forms
- Advice 1698-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4819
- Advice 1697-G, Revision of Cross-Over Rate Effective June 11, 2007
- Advice 1696-G, Revision of Core and Noncore Gas Procurement Rates Effective June 11, 2007
- Advice 1695-G, Revision of Standby Procurement Rate Effective April 10, 2007
- Advice 1694-G, Revision of the CARE and FERA Income Levels and Eligibility Forms
- Advice 1693-G, Establishment of the Advanced Metering Infrastrucure Balancing Account (AMIBA) and Revisions to Electric and Gas Rule 9
- Advice 1692-G, Revision of Cross-Over Rate Effective May 9, 2007
- Advice 1691-G , Revision of Core and Noncore Gas Procurement Rates Effective May 9, 2007
- Advice 1690-G, Distribution PBR Performance Report for 2006
- Advice 1689-G, Expedited Advice Letter for Interstate Pipeline Capacity Contract – Decision 04-09-022
- Advice 1688-G, Revision of Standby Procurement Rate Effective March 11, 2007
- Advice 1687-G, Request for Authorization to Provide Temporary Transport of Natural Gas to Mexico
- Advice 1686-G, Addition of the Metro Construction and Operation Center to the Electric and Gas Preliminary Statements For Hazardous Waste Substance Cleanup
- Advice 1685-G, Notification of the Creation of New Affiliates
- Advice 1684-G, Revision of Cross-Over Rate Effective April 10, 2007
- Advice 1683-G, Revision of Core and Noncore Gas Procurement Rates Effective April 10, 2007
- Advice 1682-G, Revisions to Sample Forms - Credit and Collection Notices
- Advice 1681-G, Approval for Interstate Pipeline Capacity Contract – Decision 04-09-022
- Advice 1680-G, Revision of Standby Procurement Rate Effective February 11, 2007.
- Advice 1679-G-A, Supplemental: Tariff Integration - Electric and Gas Rule 6 - Establishment and Re-Establishment of Credit
- Advice 1678-G, Gas Procurement PBR Year 13 Results
- Advice 1677-G, Revision of Cross-Over Rate Effective March 11, 2007
- Advice 1676-G, Revision of Core and Noncore Gas Procurement Rates Effective March 11, 2007
- Advice 1675-G, Notification of the Creation of New Affiliates
- Advice 1674-G, Revision of Standby Procurement Rate Effective January 10, 2007
- Advice 1673-G, Deferred Payment Plan for Citrus and Agricultural Growers in Compliance with Resolution E-4065
- Advice 1672-G, Revision of Cross-Over Rate Effective February 11, 2007
- Advice 1671-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1670-G, Revision of Core and Noncore Gas Procurement Rates Effective February 11, 2007
- Advice 1669-G, Reinstatement of the Credit Card Payment Option
- Advice 1668-G-A, Supplemental: Establishment of the Integrated Transmission Balancing Account (ITBA) and Modifications to Existing Tariffs to Implement Decisions 06-04-033, 06-12-031, and Resolution G-3407
- Advice 1667-G, Revision of Standby Procurement Rate Effective December 11, 2006
- Advice 1666-G, Revision of Cross-Over Rate Effective January 10, 2007
- Advice 1665-G, Revision of Core and Noncore Gas Procurement Rates Effective January 10, 2007
- Advice 1664-G, Consolidated Gas Rate Changes Effective January 1, 2007
- Advice 1663-G, Tariff Revisions to Provide the CARE Discount in Common Use Areas Pursuant to Decision 06-12-038
- Advice 1662-G, 2006 Affiliate Transactions Compliance Plan
- Advice 1661-G, Revision of Standby Procurement Rate Effective November 11, 2006
- Advice 1660-G-A, Partial Supplemental Filing: Gas OIR Phase II Compliance Filing Pursuan to D.06-09-039
- Advice 1660-G, Gas OIR Phase 2 Compliance Filing Pursuant to D.06-09-039
- Advice 1659-G, Modifications to the Advanced Metering Infrastructure Memorandum Account in Compliance with D.06-12-016
- Advice 1658-G, Revision of Cross-Over Rate Effective December 11, 2006
- Advice 1657-G, Revision of Core and Noncore Gas Procurement Rates Effective December 11, 2006
- Advice 1656-G, Revision of Standby Procurement Rate Effective October 10, 2006
- Advice 1655-G, Tariff Integration: Revision of Electric and Gas Rule 11 - Discontinuance of Service
- Advice 1654-G, Revision of Cross-Over Rate Effective November 11, 2006
- Advice 1653-G, Revision of Core and Noncore Gas Procurement Rates Effective November 11, 2006
- Advice 1652-G-A, Partial Supplemental Filing: Gas OIR Phase 2 Compliance Filing pursuant to D.06-09-039 and Resolution G-3397
- Advice 1652-G, Gas OIR Phase II Compliance Filing Pursuant to D.06-09-039
- Advice 1651-G, Post-Test Year Rate Adjustments for 2007
- Advice 1650-G, Revisions to Rule No. 40, On-Bill Financing Program
- Advice 1649-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2007
- Advice 1648-G, Notification of the Creation of New Affiliates
- Advice 1647-G, Annual Regulatory Account Balance Update for Rates effective January 1, 2007
- Advice 1646-G, Revision of Standby Procurement Rate Effective September 12, 2006
- Advice 1645-G, Revision of Cross-Over Rate Effective October 10, 2006
- Advice 1644-G, Revision of Core and Noncore Gas Procurement Rates Effective October 10, 2006
- Advice 1643-G, Tariff Integration: Revisions to Schedule GN-3 - Core Commercial Service
- Advice 1642-G, Revision of Standby Procurement Rate Effective August 9, 2006
- Advice 1641-G, Tariff Integration: Revisions to Schedule GM - Multi-Family Natural Gas Service
- Advice 1640-G, Revision of Cross-Over Rate Effective September 12, 2006
- Advice 1639-G, Revision of Core and Noncore Gas Procurement Rates Effective September 12, 2006
- Advice 1638-G, Update to SDG&E‘s 2006-2008 Interstate Capacity Planning Ranges Based on the 2006 California Gas Report
- Advice 1637-G, Request to Transfer Electric Energy Efficiency Program Funds to Offset Gas Expenditures
- Advice 1636-G, Expedited Advice Letter for Interstate Pipeline Capacity Contract – Decision 04-09-022
- Advice 1634-G, Revision of Standby Procurement Rate Effective July 12, 2006
- Advice 1633-G, Revisions to the Self-Generation Programs Memorandum Account (SGPMA)
- Advice 1632-G, Revision of Tariff Structure for Regulatory Accounts Preliminary Statements and Elimination of Inactive Regulatory Accounts
- Advice 1631-G, Revision of Cross-over Rate Effective August 9, 2006
- Advice 1630-G, Modification of SDG&E’s Fiber Optic Cable in Gas Pipelines (G-FIG) Tariff
- Advice 1629-G, Revision of Core and Noncore Gas Procurement Rates Effective August 9, 2006
- Advice 1628-G, Revision to Electric and Gas Rule 12 - Rates and Optional Rates
- Advice 1627-G, Revision of Standby Procurement Rate Effective June 11, 2006
- Advice 1626-G, Revision of Cross-Over Rate Effective July 12, 2006
- Advice 1625-G, Revision of Core and Noncore Gas Procurement Rates Effective July 12, 2006
- Advice 1624-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1623-G-A, Supplemental Filing - Treatment of the Asset Sales Deferred to the Gain on Sale Rulemaking and Establishment of the Gain/Loss on Sale Mechanism (GLOSM)
- Advice 1622-G, Revisions to Schedule GTNC, GTNC-SD, and GCORE Regarding Noncore Service Eligibility
- Advice 1621-G, Revision of Standby Procurement Rate Effective May 9, 2006
- Advice 1620-G, Revision of Cross-over Rate effective June 11, 2006
- Advice 1619-G, Revision of Core and Noncore Gas Procurement Rates effective June 11, 2006
- Advice 1618-G, Revisions to Sample Forms to Reflect the Closure of Branch Offices
- Advice 1617-G, Revision of Standby Procurement Rate Effective April 11, 2006
- Advice 1616-G, Revision of the CARE and FERA Income Levels and Eligibility Forms
- Advice 1615-G, Revision of Cross-Over Rate Effective May 9, 2006
- Advice 1614-G, Revision of Core and Noncore Gas Procurement Rates Effective May 9, 2006
- Advice 1613-G, Expedited Advice Letter For Interstate Pipeline Capacity Contract - Decision 04-09-022
- Advice 1612-G, Distribution PBR Performance Report for 2005
- Advice 1611-G, Tariff Integration: Revisions to Schedule GS -Submetered Service
- Advice 1610-G, Revision of Standby Procurement Rate Effective March 11, 2006
- Advice 1609-G, Notification of the Creation of New Affiliates
- Advice 1608-G, Modification to Electric and Gas Rule 2 and Rule 15 in Compliance with Resolution E-3983
- Advice 1607-G, Revision of Cross-Over Rate Effective April 11, 2006
- Advice 1606-G, Revision of Core and Noncore Gas Procurement Rates Effective April 11, 2006
- Advice 1605-G, Use of the Federal Reserve Three-Month Commercial Paper Rate Financial, Federal Reserve Statistical Release H.15, for Accrual of Interest on Balancing Accounts and Customer Deposits
- Advice 1604-G, Allocation of FERC Settlement Proceeds to Gas Customers Associated with the 2000-2001 Energy Crisis
- Advice 1603-G, Correction of Certain Daily Balancing Standby Rates for November 2005 to January 2006
- Advice 1602-G, Revision of Standby Procurement Rate Effective February 11, 2006
- Advice 1601-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4816
- Advice 1600-G, Revision of Cross-Over Rate Effective March 11, 2006
- Advice 1599-G, Revision of Core and Noncore Gas Procurement Rates effective March 11, 2006
- Advice 1598-G, Revision of Standby Procurement Rate Effective January 11, 2006
- Advice 1597-G, Establishment of the California Solar Initiative Balancing Account (CSIBA)
- Advice 1596-G, Notification of the Creation of New Affiliates
- Advice 1595-G, SDG&E 2006 - 2007 Storage Contract
- Advice 1594-G, Revision of Cross-Over Rate Effective February 11, 2006
- Advice 1593-G, Revision of Core and Noncore Gas Procurement Rates Effective February 11, 2006
- Advice 1592-G, Second Revised El Paso Settlement Refund Plan
- Advice 1591-G, San Diego Gas & Electic's 2006-08 Energy Efficiency Compliance Filing
- Advice 1590-G, Revision of Standby Procurement Rate Effective December 11, 2005
- Advice 1589-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1588-G, Revision of Cross-Over Rate Effective January 11, 2006
- Advice 1587-G, Revision of Core and Noncore Gas Procurement Rates Effective January 11, 2006
- Advice 1586-G, Reclassification of Affiliates from Not Covered to Covered
- Advice 1585-G, Modification to the Self Generation Program Memorandum Account for the California Solar Initiative
- Advice 1584-G, Establishment of a Post-2005 Gas Energy Efficiency Balancing Account and a Post-2005 Gas Low Income Energy Efficiency Balancing Account
- Advice 1583-G, 2005 Affiliate Transactions Compliance Plan
- Advice 1582-G, Consolidated Gas Rate Changes Effective January 1, 2006
- Advice 1581-G, Revision of Standby Procurement Rate Effective November 9, 2005
- Advice 1580-G, Revisions to Schedules GP-SUR and GPC
- Advice 1579-G, Basic Ordering Agreements Between SDG&E and the U.S. Government
- Advice 1578-G, Creation of Gas Special Facilities Contract
- Advice 1577-G, Revision of Cross-over Rate effective December 11, 2005
- Advice 1576-G, Revision of Core and Noncore Gas Procurement Rates Effective December 11, 2005
- Advice 1575-G, Allocation of Energy Efficiency Evaluation, Measurement and Verification Budgets, and Corresponding Revisions to Tables of D.05-09-043, Incremental Electric Revenue and Gas Funding Requirements for 2006-2008 EE Portfolios
- Advice 1574-G, Revisions to Electric and Gas Master Meter and Submeter Rate Schedules Pursuant to D.05-05-026
- Advice 1573-G-A, Supplemental: Natural Gas Service for Home Refueling of Natural Gas Motor Vehicles
- Advice 1572-G, Revision of Standby Procurement Rate Effective October 11, 2005
- Advice 1571-G, Establishment of Rule 40, On-Bill Financing Program, in compliance with Decision 05-09-043
- Advice 1570-G, Notification of the Creation of New Affiliates
- Advice 1569-G, Revision of Cross-Over Rate Effective November 9, 2005
- Advice 1568-G, Revision of Core and Noncore Gas Procurement Rates Effective November 9, 2005 Including Implementation of the Gas Hedgin Plan Adopted by D.05-10-043
- Advice 1567-G-A, Supplemental Filing - Revisions to the Self-Generation Program Memorandum Accounts (SGPMA) Pursuant to Decisions 04-12-045 & 05-09-043
- Advice 1566-G, Emergency 2005-2006 Winter Gas Initiative in Compliance with D.05-10-044
- Advice 1565-G, Post-Test Year Rate Adjustments for 2006
- Advice 1564-G, Request to Extend the Rebuild a Greener San Diego Program
- Advice 1563-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2006
- Advice 1562-G-A, Supplemental - Annual Regulatory Account Balance Update for Rates Effective January 1, 2006
- Advice 1561-G, Revision of Standby Procurement Rate Effective September 12, 2005
- Advice 1560-G, Revision of Cross-Over Rate Effective October 11, 2005
- Advice 1559-G, Revison of Core and Noncore Gas Procurement Rates Effective October 11, 2005
- Advice 1558-G, Revisions to Gas PBR Mechanism Procedure
- Advice 1557-G, Revision of Standby Procurement Rate Effective August 9, 2005
- Advice 1556-G, Implementation of October 1, 2005 Rate Adjustments
- Advice 1555-G, Notification of the Creation of New Affiliates
- Advice 1554-G, Revision of Cross-Over Rate Effective September 12, 2005
- Advice 1553-G, Revision of Core and Noncore Gas Procurement Rates Effective September 12, 2005
- Advice 1552-G, Establishment of New Memorandum Accounts for Advanced Metering Infrastructure Pre-Deployment Costs
- Advice 1551-G-A, Supplemental: Request to Establish New Memorandum Accounts for Incremental CARE Call Center Costs
- Advice 1550-G, Revision of Standby Procurement Rate Effective July 12, 2005
- Advice 1549-G, Consolidation of SDG&E's Annual Rewards and Penalties Balancing Account Filings with its Annual Gas and Electric Regulatory Account Updates
- Advice 1548-G, Revision of Cross-Over Rate Effective August 9, 2005
- Advice 1547-G, Revision of Core and Non-Core Gas Procurement Rates Effective August 9, 2005
- Advice 1546-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1545-G, Revisions to the Electric Vehicle Balancing Account and Natural Gas Vehicle Balancing Account Pursuant to Decision 05-05-010
- Advice 1544-G, Expedited Advice Letter for Interstate Pipeline Capacity Contract Decision 04-09-022
- Advice 1543-G, Revision of Standby Procurement Rate Effective June 11, 2005
- Advice 1542-G, Tariff Integration: Revision to Electric and Gas Rule 19 - Supply to Separate Premises and Resale
- Advice 1541-G, Revision of Cross-Over Rate Effective July 12, 2005
- Advice 1540-G, Revision to Electric and Gas Rule 10 - Disputed Bills
- Advice 1539-G, Revision of Core and Non-Core Gas Procurement Rates Effective July 12, 2005
- Advice 1538-G-A, Partial Supplemental Filing: Revisions to Tariffs and New CARE Application for Migrant Farm Worker Housing Centers
- Advice 1538-G, Revisions to Tariffs and New CARE Application for Migrant Farm Worker Housing Centers
- Advice 1537-G, Revised 2005 CARE Budget
- Advice 1536-G, Joint Application for CARE/FERA Form 142-732/4
- Advice 1535-G, Revision of Standby Procurement Rate Effective May 10, 2005
- Advice 1534-G, Revision of Customer Bill Form
- Advice 1533-G, Revision of Cross-Over Rate Effective June 11, 2005
- Advice 1532-G, Revision of Core and Noncore Gas Procurement Rates Effective June 11, 2005
- Advice 1531-G, Revision of Standby Procurement Rate Effective April 11, 2005
- Advice 1530-G, Tariff Integration - Revisions to Schedule GR and Creation of New Schedule G-CARE
- Advice 1529-G, Revision of the CARE and FERA Income Levels and Eligibility Forms
- Advice 1528-G, Notification of the Creation of New Affiliates
- Advice 1527-G, Revision of Cross-Over Rate Effective May 10, 2005
- Advice 1526-G-A, Limited Supplemental Filing: Revision of Core and Noncore Gas Procurement Rates Effective May 10, 2005.
- Advice 1526-G, Revision of Core and Noncore Gas Procurement Rates Effective May 10, 2005
- Advice 1525-G, Sharable Earnings and Performance Incentives for Year 2004
- Advice 1523-G, Update of E3 Avoided Cost Methodology Pursuant to D.05-04-024
- Advice 1522-G, Revision of Standby Procurement Rate Effective March 9, 2005
- Advice 1520-G, Rate Implementation of SDG&E's Phase 2 Cost of Service Decision (D.05-03-023) and SDG&E's Market Indexed Capital Adjustment Mechanism(MICAM)
- Advice 1519-G, Revision of Cross-Over Rate Effective April 11, 2005
- Advice 1518-G, Revision of the Core and Noncore Gas Procurement Rates Effective April 11, 2005
- Advice 1517-G, Establishment and Modification of Preliminary Statements in Compliance with SDG&E's Phase 2 Cost of Service Decision (D.05-03-023)
- Advice 1516-G, Gas Procurement PBR Year 11 Results
- Advice 1515-G, Revision of Standby Procurement Rate Effective February 9, 2005
- Advice 1514-G, Revisions to Sample Forms Including Disconnection Notices and Deposit Requests
- Advice 1513-G, Credit Card Payment for Natural Gas Vehicle Fuel
- Advice 1512-G, Revision of Cross-Over Rate Effective March 9, 2005
- Advice 1511-G, Revision of Core and Noncore Procurement Rates Effective March 9, 2005.
- Advice 1510-G-B, Supplemental Filing - Natural Gas Service for Motor Vehicles Compression Surcharge
- Advice 1509-G, Revision of Standby Procurement Rate Effective January 11, 2005
- Advice 1508-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1507-G, Notification of the Creation of New Affiliates
- Advice 1506-G, Revision of Cross-Over Rate Effective February 9, 2005
- Advice 1505-G, Revision of Core and Non-Core Procurement Rates Effective February 9, 2005
- Advice 1504-G, Revision of Standby Procurement Rate Effective December 11, 2004
- Advice 1503-G, Implementation of SDG&E's Phase 1 Cost of Service Decision(D.04-12-015) and Rate Design Window Decision (D.04-04-042)Effective February 1, 2005.
- Advice 1502-G, Establishment and Modification of Regulatory Accounts in Compliance with SDG&E's Phase 1 Cost of Service Decision (D.04-12-015).
- Advice 1501-G, Revision of Cross-Over Rate Effective January 11, 2005
- Advice 1500-G, Notification of the Creation of New Affiliates
- Advice 1499-G, SDG&E 2005 Storage Contract
- Advice 1498-G, Revision of Core and Non-Core Procurement Rates Effective January 11, 2005
- Advice 1497-G, 2004 Affiliate Transactions Compliance Plan
- Advice 1496-G, Consolidated Gas Rate Changes Effective January 1, 2005
- Advice 1495-G, Revision of Standby Procurement Rate Effective November 9, 2004
- Advice 1494-G-A, Supplemental: Update of Residential Electric and Gas Line Extension Allowances and Ownership Charges
- Advice 1493-G, Modification of the Cost of Service Revenue with D.04-12-009.
- Advice 1492-G, Update to Utility Reimbursement Account Fees
- Advice 1491-G, Revision of Cross-Over Rate Effective December 11, 2004.
- Advice 1490-G, Revision of Core and Non-Core Procurement Rates effective December 11, 2004.
- Advice 1489-G, Revision of Standby Procurement Rate Effective October 11, 2004
- Advice 1488-G-A, Supplemental Filing in Compliance With Resolution G-3377 - Open Season for Firm Noncore Gas Service Commencing June 1, 2005
- Advice 1487-G, Revision of Cross-Over Rate Effective November 9, 2004.
- Advice 1486-G, Revision of Core and Non-Core Procurement Rates effective November 9, 2004
- Advice 1485-G, Debit Card Payment Program
- Advice 1484-G, Update to Gas Public Purpose Program Surcharge Rates
- Advice 1482-G, Annual Regulatory Account Balance Update for Rates Effective January 1, 2005
- Advice 1481-G, Revision of Standby Procurement Rate Effective September 12, 2004
- Advice 1480-G, Compliance with Senate Bill 1891 -- Metering of Multi-Unit Residences
- Advice 1479-G, Market Indexed Capital Adjustment Mechanism (MICAM)
- Advice 1478-G, Notification of the Creation of New Affiliates
- Advice 1477-G, Revision of Cross-Over Rate Effective October 11, 2004.
- Advice 1476-G, Revised El Paso Settlement Refund Plan
- Advice 1475-G, Revision of Core and Non-Core Procurement Rates effective October 11, 2004
- Advice 1474-G-B, Supplemental-New Open Access Tariff in Compliance with the Natural Gas OIR Phase 1 Decision No. 04-09-022 and Resolutions G-3376 and G-3382
- Advice 1473-G, Adjustment to Electric Distribution and Gas Base Margin Rates, Effective January 1, 2005
- Advice 1472-G, Revision of Standby Procurement Rate Effective August 10, 2004
- Advice 1471-G-A, Supplemental: Revisions to Gas Tariffs in Compliance with Gas Public Purpose Program Surcharge Decision 04-08-010
- Advice 1470-G, Revision of Rule 8 - Notices and Rule 11 - Discontinuance of Service
- Advice 1469-G, Revision of Cross-Over Rate Effective September 12, 2004
- Advice 1468-G, Revision of Core and Non-Core Gas Procurement Rates effective September 12, 2004
- Advice 1467-G, Revision of Standby Procurement Rate Effective July 12, 2004
- Advice 1466-G, Revision of Cross-Over Rate Effective August 10, 2004
- Advice 1465-G, Revision of Core and Noncore Gas Procurement Rates effective August 10, 2004
- Advice 1464-G, Updated Listing of Service Providers
- Advice 1462-G, Revision of Standby Procurement Rate Effective June 9, 2004
- Advice 1461-G, Baseline Allowances Associated with Seasonal Residences
- Advice 1460-G, Gas Procurement PBR Year 10 Results
- Advice 1459-G, Revision of Cross-Over Rate Effective July 12, 2004
- Advice 1458-G, Revision of Core and Noncore Gas Procurement Rates effective July 12, 2004
- Advice 1457-G, Revision of Standby Procurement Rate Effective May 11, 2004
- Advice 1456-G, Revision of Cross-Over Rate Effective June 9, 2004
- Advice 1455-G , Revision of Core and Noncore Gas Procurement Rates Effective June 9, 2004
- Advice 1454-G, Revision of Line Extension Form In Compliance with Resolution G-3364
- Advice 1453-G, Revision of Standby Procurement Rate Effective April 11, 2004
- Advice 1452-G, Revision of CARE Income Limits and CARE Eligibility Forms
- Advice 1451-G, Notification of the Creation of New Affiliates
- Advice 1450-G, Revision of Cross-Over Rate Effective May 11, 2004
- Advice 1449-G, Revision of Core and Noncore Gas Procurement Rates Effective May 11, 2004
- Advice 1448-G, Revision of Standby Procurement Rate Effective March 9, 2004
- Advice 1447-G-A, Partial Supplemental Filing -- Revised Residential Rates Associated With Baseline Allowance Changes
- Advice 1447-G, Revised Residential Rates Associated With Baseline Allowance Changes
- Advice 1446-G, Revision of Cross-Over Rate Effective April 11, 2004
- Advice 1445-G, Revision of Core and Noncore Procurement Rates Effective April 11, 2004
- Advice 1444-G-A, Supplemental - Distribution PBR Performance Report for 2003
- Advice 1443-G, Gas Transportation Rate Changes Related to El Paso Turned-Back Capacity Costs
- Advice 1442-G, Revision of Standby Procurement Rate Effective February 10, 2004
- Advice 1441-G, Notification of the Creation of New Affiliates
- Advice 1440-G, Revision of Cross-Over Rate Effective March 9, 2004
- Advice 1439-G, Revision of Core and Noncore Procurement Rates Effective March 9, 2004
- Advice 1438-G, Revision of Standby Procurement Rate Effective January 12, 2004
- Advice 1437-G, Revisions to Sample Forms Including Customer Bill Forms and Collection Notices
- Advice 1436-G, Clean-up Revisions to Rule 25
- Advice 1435-G, Request for Expedited Approval to Increase Available Funding and Expand the Rebuild a Greener San Diego Program
- Advice 1434-G, Revision of Crossover Rates Effective February 10, 2004
- Advice 1433-G-A, Supplemental Filing - Updated List of Service Providers
- Advice 1432-G, Revision of Core and Noncore Gas Procurement Rates Effective February 10, 2004, including compliance with the El Paso Turned-Back Capacity Decision
- Advice 1431-G, Revisions to the Electric and Gas Self-Generation Program Memorandum Account
- Advice 1430-G, Revision of Standby Procurement Rate Effective December 9, 2003
- Advice 1429-G, Notification of the Creation of New Affiliates
- Advice 1428-G, Revision of Crossover Rates Effective January 12, 2004
- Advice 1427-G, Revision of Core and Noncore Gas Procurement Rates Effective January 12, 2004
- Advice 1426-G, Consolidated Gas Rate Change Effective January 1, 2004
- Advice 1425-G, Establishment of the Cost of Service Revenue Requirement Memorandum Account in Compliance with D.03-12-057
- Advice 1423-G, Revision of Standby Procurement Rate Effective November 11, 2003
- Advice 1422-G, Establishment of an Electric Vehicle Balancing Account and Revisions to the Natural Gas Vehicle Adjustment Clause Balancing Account Pursuant to Decision 03-10-086
- Advice 1421-G, Update of Utility Reimbursement Account Fees in Compliance with Resolution M-4810
- Advice 1420-G, Revision of Crossover Rates Effective December 9, 2003
- Advice 1419-G, Revisions to Customer Bill Forms
- Advice 1418-G, Revision of Gas Rule 22 - Interstate Capacity Brokering
- Advice 1417-G, Revision of Core and Noncore Gas Procurement Rates Effective December 9, 2003
- Advice 1416-G, El Paso Settlement Refund Plan and Modification of Tariffs in Compliance with D.03-10-087
- Advice 1415-G, Revision of Standby Procurement Rate Effective October 11, 2003
- Advice 1414-G, Reallocation of Energy Efficiency and Self-Generation Program Dollars to Fund the Rebuild a Greener San Diego Program
- Advice 1413-G, Notification of the Creation of New Affiliates
- Advice 1412-G, Revision of Core and Noncore Procurement Rates Effective November 11, 2003
- Advice 1411-G, Update of Public Purpose Program Gas Surcharge Rates Effective January 1, 2004
- Advice 1410-G, Revision of Standby Procurement Rate Effective September 10, 2003
- Advice 1409-G, Annual Regulatory Account Balance Update for Rates Effective January 1, 2004
- Advice 1408-G, Establishment of SDG&E's Fiber Optic Cable In Gas Pipelines (FIG) Service Pursuant to Decision 03-10-017
- Advice 1407-G, Revision of Crossover Rates Effective October 11, 2003
- Advice 1406-G, Revision of Core and Noncore Procurement Rates Effective October 11, 2003
- Advice 1405-G, Gas Procurement Performance-Based Ratemaking (PBR) Mechanism
- Advice 1403-G, Adjustment to Electric Distribution and Gas Base Margin Rates, Effective January 1, 2004
- Advice 1402-G, Notification of the Creation of New Affiliates
- Advice 1401-G, Revision of Standby Procurement Rate Effective August 11, 2003
- Advice 1400-G-A, Supplemental Filing - Revisions to Electric and Gas Preliminary Statements to Track Earnings Claims From Low-Income Energy Efficiency Program Years 1999-2001
- Advice 1399-G, Revised Affiliate Compliance Plan
- Advice 1398-G, Revision of Core and Noncore Procurement Rates Effective September 10, 2003
- Advice 1397-G, Revision of Electric and Gas Rule 18 - Meter Tests and Adjustment of Bills
- Advice 1396-G, Revision of Standby Procurement Rate Effective July 12, 2003
- Advice 1395-G, Revision of Core and Noncore Procurement Rates Effective August 11, 2003
- Advice 1394-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1392-G, Revision of Standby Procurement Rate Effective June 10, 2003
- Advice 1391-G, Gas Procurement PBR Year 9 Results
- Advice 1390-G, Revisions to Gas Tariffs to Replace "GasSelect" with "Electronic Bulletin Board"
- Advice 1389-G, Request for Authorization to Electronicaly Meter Gas Usage in Limited Situations
- Advice 1388-G, Revision of Core and Noncore Procurement Rates Effective July 12, 2003
- Advice 1387-G, Elimination of Certain Balancing and Memorandum Accounts in Compliance with D.03-06-013
- Advice 1386-G, Credit/Debit Card Payment Option
- Advice 1385-G, Revision of Rule 11, Discontinuance of Service
- Advice 1384-G, Revision of Standby Procurement Rate Effective May 11, 2003
- Advice 1383-G, Basic Ordering Agreement Between SDG&E and the U.S. Government
- Advice 1382-G, Reduction to the Income Tax Component of Contributions and Advances for Construction
- Advice 1381-G, Revision of Core and Noncore Procurement Rates
- Advice 1380-G, Notication of the Creation of New Affiliate
- Advice 1379-G, Revision of Standby Procurement Rate Effective April 9, 2003
- Advice 1378-G, Revision of CARE Income Limits and Care Eligibility Forms
- Advice 1377-G-B, Supplemental - Revision to Electric Rule 15, Distribution Line Extensions and Gas Rule 15, Gas Main Extensions
- Advice 1376-G, Revision of Core and Noncore Procurement Rates Effective May 11, 2003
- Advice 1375-G, Standby Procurement Rate Effective March 11, 2003
- Advice 1374-G, Notification of the Creation of a New Affiliate
- Advice 1373-G, Revision of Core and Noncore Gas Procurement Rates Effective April 9, 2003
- Advice 1372-G, Addition of the Solana Beach Burn Site to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1371-G, Addition of the Sampson Street 12/4kV Substation to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1370-G, Addition of the Sampson Street 69/12kV Substation to the Electric and Gas Preliminary Statements for Hazardous Waste Substance Cleanup
- Advice 1369-G, Distribution PBR Performance Report for 2002
- Advice 1368-G, Standby Procurement Rate Effective February 11, 2003
- Advice 1367-G, Revision of Core and Noncore Gas Procurement Rates Effective March 11, 2003
- Advice 1366-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1365-G, Revision to Rule 14 - Shortage of Gas Supply, Interruption of Delivery, and Priority of Service
- Advice 1364-G, Extending Open Season Required by D.02-11-073 in Order to Offer Hourly Bidding for Firm Noncore Capacity
- Advice 1363-G, Revision of Core & Noncore Gas Procurement Rates Effective February 11, 2003
- Advice 1362-G, Revision to the Level Pay Plan in Electric and Gas Rule 9 - Rendering and Payment of Bills
- Advice 1361-G, SDG&E's Request to Modify Gas and Electric Cost Allocation Splits in its PY2003 Low Income Energy Efficiency (LIEE) Program
- Advice 1360-G, Revision of Core & Noncore Gas Procurement Rates Effective January 12, 2003
- Advice 1359-G, Revision of Schedule G-IMB Transportation Imbalance Service
- Advice 1358-G, Consolidated Gas Rate Change Effective January 1, 2003
- Advice 1357-G, Update of Utility Reimbursement Account Fees
- Advice 1356-G, Franchise Fee
- Advice 1355-G, Gas Transmission OII
- Advice 1353-G, Revision of Core and Noncore Gas Procurement Rates
- Advice 1352-G-A, Supplement to Cleanup Filing to Revise the Electric and Gas Tariffs
- Advice 1351-G, Warning Notice - Meter Closed for Fumigation
- Advice 1350-G, Revision of Electric and Gas Rule 12 - Rates and Optional Rates
- Advice 1349-G, Revision of Rule 2 - Description of Service
- Advice 1348-G, Revision of Core and Noncore Gas Procurement Rates Effective November 11, 2002
- Advice 1347-G, Extensioin of the Credit/Debit Payment Option Pilot Program
- Advice 1345-G, Low Income Energy Efficiency Direct Assistance Program Gas and Electric Funds
- Advice 1344-G, Update of Gas Regulatory Accounts - Rate Revision effective January 1, 2003
- Advice 1343-G-A, Supplement Filing - Update of PPP Gas Surcharge
- Advice 1342-G, Notification of the Creation of a New Affiliate
- Advice 1341-G, Revision of Core and Noncore Procurement Rates
- Advice 1340-G, Adjustment to Electric Distribution and Gas Base Margin Rates Effective January 1, 2003
- Advice 1339-G, Revision of Gas Rule 32
- Advice 1338-G-B, Supplemental Filing - Revision of Gas Tariffs Pursuant to Decision 02-08-065
- Advice 1337-G, Revision of Schedules GCORE, EG & EG-SD
- Advice 1336-G, Gas Heating Value Measurements
- Advice 1335-G, Allocation of Authorized CARE Budget in compliance with D.02-09-021
- Advice 1334-G, Establishment of El Paso Turned-Back Capacity Balancing Account
- Advice 1333-G, Revision of Core and Noncore Procurement Rates
- Advice 1332-G, Revision of Rule 2 - Description of Service
- Advice 1331-G, New Collection Notice Form and Revision to the Final Notice Before Disconnection
- Advice 1330-G, Revision of Core & Noncore Procurement Rates
- Advice 1329-G, Semi-Annual Filing - Updated List of Service Providers
- Advice 1328-G, Medical Baseline Allowances
- Advice 1326-G-A, Supplement - Revision of Gas Transportation Rates to Implement the Passthrough from SoCalGas for Montebello Storage
- Advice 1325-G, Addition of Harbor Substation to Electric & Gas Preliminary Statement for Hazardous Substance Cleanup
- Advice 1324-G, Revision of Electric & Gas Rule 4 - Contracts
- Advice 1323-G, Revision of Electric & Gas Rule 3 - Application for Service
- Advice 1322-G, Revision of Electric & Gas Rule 6 - Establishment and Re-Establishment of Credit
- Advice 1321-G, Revision of Core & Noncore Procurement Rates
- Advice 1320-G, Pacific Enterprises/Enova Corp Merger Credit
- Advice 1319-G, Notification of Creation of New Affiliates
- Advice 1318-G, Revision of Core and Noncore Gas Procurement Rates Effective June 11, 2002
- Advice 1317-G, Notification of the Creation of New Affiliates
- Advice 1316-G, Revision of CARE Income Limits and CARE Eligibility Forms
- Advice 1315-G, Reduction to Income Tax Component of Contributions and Advances for Construction
- Advice 1314-G, Revised Affiliate Compliance Plan
- Advice 1313-G, Increase to Electric & Gas Franchise Fee Differentials
- Advice 1312-G, Phase 1 Interim Opinion on Baseline Allowances Applicable to Residential Customers
- Advice 1311-G, Revision of Core and Noncore Procurement Rates
- Advice 1310-G, ESP Consolidated Billing Credits in compliance with D.01-12-018
- Advice 1309-G, UDC Consolidated Billing in compliance with D.01-12-018
- Advice 1308-G, Revised Customer Bill Format
- Advice 1307-G, Revision of Core & Noncore Procurement Rates
- Advice 1306-G, Distribution PBR Performance Report for 2001
- Advice 1305-G, Gas PBR Reward
- Advice 1304-G, Revision of Territory Served Maps
- Advice 1303-G, Amendment to MOU among SDG&E, US Government, and Hunt Corp.
- Advice 1302-G, Notification of the Creation of New Affiliates
- Advice 1301-G, Revision of Core & Noncore Procurement Rates
- Advice 1300-G, Establishment of Rule 35
- Advice 1298-G, Cleanup Filing
- Advice 1297-G, List of Service Providers pursuant to Affiliate Transaction Rule IV.C.2
- Advice 1296-G, Revision of Core & Noncore Procurement Rates
- Advice 1295-G-A, Supplement - Implementation Schedule
- Advice 1294-G, Revision of Core & Noncore Procurement Rates
- Advice 1293-G-A, Revision of transportation rates to implement passthrough from SoCalGas
- Advice 1274-G-B, Establishment of Self-Generation Program Memorandum Account
- Advice 1200-G-B, 2nd Supplemental Filing - Revision of Tariffs to Discontinue Providing a Paper Bill to Customers Enrolled in Internet Billing, in Compliance with Resolution E-3711