2017年再生可能エネルギー入札メカニズムVII募集要項

最新ニュースとアップデート

Respondents are encouraged to check this Request for Offers (“RFO” or the solicitation) Website periodically for updates, notices, and postings. SDG&E, at its sole discretion, and pursuant to orders from the CPUC, may change the terms, requirements and schedule of this solicitation. Respondents should monitor the RFO Website for announcements regarding any updates or changes including posted questions & answers. SDG&E will post all solicitation announcements, including scheduling changes or RFO amendments to this website. In particular, participants should check the RFO website for details on the pre-bid conference call and posting of answers to submitted questions.

  • 08/29/17 - Per the RAM VII RFO protocol, SDG&E will not shortlist any bidders until SDG&E’s pending Petition for Modification and Application for Modification are resolved.  The CPUC released a proposed decision (PD) on SDG&E’s PFM, however this process is not yet complete.  The PD is expected to be heard at the 9/28/17 CPUC meeting. SDG&E will update this Notice when the PFM and AFM are resolved by the CPUC.
  • 06/29/2017 -  The FAQドキュメント 更新されました
  • 06/26/2017 -  All 質問と回答 received to date have been answered
  • 2017年06月20日 – ザ FAQドキュメント has been created with the first set of questions and answers
  • 06/16/2017 - The bidder's conference スライド (NAIST) と 録音 現在利用可能です
  • 06/02/2017 – Scheduled Launch

SDG&E’s 2017 RFO Seeking Renewable Power Purchase Agreements

San Diego Gas & Electric Company (“SDG&E”) is issuing this Renewable Auction Mechanism (“RAM”) solicitation pursuant to the California Public Utilities Commission (“CPUC”) direction in 決議E-4783, that SDG&E hold a RAM VII solicitation.  On October 27, 2016, SDG&E filed two legal challenges, an Application for Modification (“AFM”) and a Petition for Modification (“PFM”), with the CPUC seeking to terminate further procurement obligations under the RAM program.  SDG&E will not shortlist any bids until such time as the CPUC has ruled on SDG&E’s pending AFM and PFM.  Additionally, if the CPUC grants SDG&E’s AFM and/or PFM, SDG&E reserves its right not to procure from the bids received in this RFO.  Alternatively, if the CPUC denies SDG&E’s AFM and/or PFM and directs procurement from bids received in this RFO, SDG&E will move forward with the shortlisting of bids.  The RAM program was created by Decision D.10-12-048 and revised by D.14-11-042 (together the RAM Decision), which sets the program parameters.

The RAM Decision requires that this solicitation be for Renewables Portfolio Standard (“RPS”) eligible resources located in the California Independent System Operator (“CAISO”) control area, including resources dynamically transferred into the CAISO.  SDG&E invites projects of all sizes above 0.5 MW ac to participate, noting that its RAM program capacity target is 107.3 MW.  All projects at a minimum require a Phase II interconnection study, or for dynamically transferred projects, an equivalent study level from the governing balancing authority (“BA”). Bids will be evaluated with SDG&E’s Net Market Value (“NMV”) Least-Cost Best-Fit (“LCBF”) methodology.

For additional details please refer to the RAM VII Solicitation Protocol.

勧誘に関する手順:

Details regarding the solicitation process and eligibility requirements are provided in the RFO document RAM VII Protocol Document.

必要な様式および書類:

  1. オファーフォーム - There is no limit on the number of Forms that can be submitted. Therefore, respondents are encouraged, to submit additional offers for consideration, such as offers with shorter tenors or with escalators.
  2. 相互接続協定またはフェーズII相互接続調査(または配電レベルの同等書類)および/またはファストトラック文書 - Submit a copy of the most recent completed interconnection agreement, Phase II interconnection study or equivalent Fast Track documentation.  For Projects dynamically transferred via pseudo-tie into the CAISO, submit copies of a completed Phase II interconnection study (or BA equivalent) and provide documentation certifying the existence of the dynamic transfer arrangements.
  3. サイト管理ドキュメント - 以下のいずれかの証拠となる敷地管理書類のコピーを提出してください。a) 直接所有権、b) リース契約、c) PPA承認後のリースまたは購入オプション(入札者に対する排他的オプションであり、RFOサイクルの完了まで有効であること)。
  4. サイトマップ 位置、設備、配置、相互接続などを示すすべてのプロジェクトマップのコピーと、プロジェクトの単線結線図を提出してください。
  5. リソースレポート - please submit a verifiable fuel resource plan describing how and why the respondent believes the natural resource for the project will produce as expected. For example, for solar and wind, developers will typically use temporary onsite equipment to take measurements and then calibrate those to long term satellite data. Programs such as PVSyst or OpenWind may then be used to calculate the radiation at the panel or wind turbine. Biogas, biomass, and geothermal projects generally perform similar studies. SDG&E prefers these reports come from a recognized third party company who specializes in these matters. Since energy deliveries from RPS projects are used for planning purposes, it is imperative that SDG&E has confidence that production estimates are accurate. This report is part of SDG&E’s qualitative evaluation of the project and its viability and ability to deliver as expected.
  6. PVSystフルモデル(太陽光発電のみ) - the full PVSyst file must be submitted by exporting the entire project that contains the prj, met, inv, pan, etc. files as a .zip file. Please don’t submit a pdf.

参照フォームおよび書類:

This solicitation employs a non-modifiable Power Purchase Agreement (“PPA”) structure.  These documents are pre-approved by the CPUC and may not be changed by either SDG&E or the winning bidder(s).  Only the blanks may be filled in with project specific information.  All respondents should submit bids per the terms of these agreements only.  Please do not submit a bid with the hopes that the non-modifiable PPA will be changed.  

RFO対応手順:

応募者は、PowerAdvocate® を介して電子的に提案書を提出し、必要なすべてのフォームと入札資料を提案書に添付する必要があります。すべての提案書は、遅くとも以下の期日までに PowerAdvocate® にアップロードする必要があります。 12:00 p.m., Pacific Time, on June 30, 2017提案を提出する予定だが、まだアカウントをお持ちでない提案者は、まず登録してユーザー名とパスワードを作成し、イベントへのアクセス権を取得する必要があります。PowerAdvocate®の募集ウェブサイトには、以下のURLからアクセスできます。

https://www.poweradvocate.com/pR.do?okey=69061&pubEvent=true 

RFOコミュニケーション

このRFOに関するすべての質問やその他の連絡事項は、電子メールで以下の宛先までお送りください。 [メール保護]。 あなた MUST CC独立評価者、ハロルド・ジャッド [メール保護]. SDG&E will not accept questions or comments in any other form, except at the bidder’s Conference.  Questions submitted after the deadline as specified in RFO Schedule will only be answered at the sole discretion of SDG&E or the IE.  All questions and their answers will be posted publicly on this website anonymously after receipt.  Respondents are encouraged to check this RFO Website periodically for updates, notices, and postings.

入札者会議

SDG&Eは、ウェブ会議形式で入札者向け説明会を1回開催します。最終的に提案書を提出する方にとって、この説明会への参加は必須ではありません。

  :June 13、2017
時間午後1時30分~午後3時30分(PPT)
視聴者向けリンク:  https://engage.vevent.com/rt/sandiegogasandelectriccompany~061317
Toll-Free Dial-in: 855-851-0422
会議ID: 6902249837

入札前ウェブ会議プレゼンテーション

入札説明会の音声は、説明会終了後できるだけ早く公開されます。アクセスするには、元のイベントリンクをご利用ください。

​2017 RAM VII Schedule

本RFOには、以下のスケジュールと期限が適用されます。SDG &Eは、いつでも独自の裁量でこのスケジュールを改訂する権利を留保します。応募者は、RFOウェブサイトで最新のスケジュールやRFOまたは入札プロセスへの変更点を確認する責任があります。詳細なスケジュールについては、各製品タイプのプロトコルを参照してください。

いいえ。

項目

DATE

1. 

RFO発行済み

2017 年 6 月 2 日

2. 

入札者会議

2017 年 6 月 13 日

3. 

質問提出期限

2017 年 6 月 22 日

4. 

すべての質問に対する回答は、SDG&Eのウェブサイトに掲載されます。

2017 年 6 月 26 日

5.

応募締切日
Offers must be uploaded to PowerAdvocate® by no    later than 12 P.M. (NOON PPT).

2017 年 6 月 30 日

6.

落札者および条件付き入札者への通知

The later of August 25, 2017, or 21 days’ post resolution of SDG&E’s AFM and PFM

7.

WINNING BIDDERS ACCEPTANCE/WITHDRAWAL LETTER due from Winning Bidders indicating:
a) Withdrawal from SDG&E’s solicitation; OR
b) Acceptance of standing as a winning bid; withdrawal from participating in any other solicitation and evidence of withdrawal notice to all other solicitors

The later of September 1, 2017, or 7 days after step 6

8.

SDG&E社、敗訴した被告らに感謝状を送付

The later of September 22, 2017, or 21 days after step 7

9.

Execute PPs

The later of September 22, 2017, or 21 days after step 7

10.

SDG&Eは、PPA(電力購入契約)を含むティア2アドバイスレターをCPUC(カリフォルニア州公益事業委員会)に提出し、承認を求めている。

Approximately October 20, 2017

11.

(控訴および/または業務停止処分を受ける前に)カリフォルニア州公益事業委員会(CPUC)の承認が見込まれる。

Approximately December 14, 2017

多様な企業からの参加

SDG&Eは、GO 156[1]で定義されている多様なビジネス企業(「DBE」、「女性所有企業」、「少数民族所有企業」、または「障害退役軍人企業」)がこのRFOに参加することを奨励します。 

さらに、SDG&Eは、開発業者に対し、プロジェクトの開発および建設の様々な段階でDBE(少数派・少数民族経営企業)を活用することを推奨しています。GO 156の一環として、SDG&Eは開発業者に対し、DBEの請負業者/下請け業者への支出があれば、その内容を特定し、検証することを義務付けます。

SDG&EのDBEプログラムおよびDBEの活用に関する追加情報は、以下をご覧ください。

http://www.sempra.com/about/supplier-diversity/

http://www.cpuc.ca.gov/puc/supplierdiversity/

SDG&EのDBEプログラムの担当者が、入札者向け説明会でプレゼンテーションを行います。DBE企業は、[email protected]までご連絡いただければ、さらに詳しい情報をお送りいたします。

よくある質問

581.00 KB
DOC
RAM VII Protocol Document
RAM VII Protocol Document
459.94 KB
XLSX
オファーフォーム
オファーフォーム
243.17 KB
DOCX
RAM Power Purchase Agreement
RAM Power Purchase Agreement
809.80 KB
PPTX
入札前ウェブ会議プレゼンテーション
入札前ウェブ会議プレゼンテーション
377.51 KB
PDF
よくある質問
よくある質問