2011年再生可能エネルギー入札メカニズム

San Diego Gas & Electric Company (SDG&E) is issuing this Request for Offers (RFO) in support of its Renewable Auction Mechanism (RAM). This RFO is issued to solicit offers from eligible energy generators (Respondents). By responding, Respondents are bound by the terms of this RFO.

The RAM, approved by the California Public Utilities Commission (CPUC) in Decision D.10-12-048 (RAM Decision) and Resolution E-4414 (RAM Resolution), supplements the State’s Renewable Portfolio Standard (RPS), complements the California Solar Initiative, promotes small-scale renewable development and may present local employment potential in California. SDG&E’s RAM program incorporates the directives of both the RAM Decision and RAM Resolution. SDG&E designed and proposes a RAM program for the purchase of a total of 81 MW over a period of two years. The RAM program calls for SDG&E to procure the renewable energy capacity pursuant to 10, 15 and 20-year RAM Power Purchase Agreements (PPAs) with Independent Power Producers.

This solicitation is limited to seeking PPAs for a total of 20MW through the auction mechanism. This solicitation is not requesting bids for renewable energy credits, feed-in-tariff projects or other RPS procurement activities that exist or are being contemplated.

Winning Respondents shall enter into a non-negotiable PPA for bundled renewable energy deliveries from eligible renewable resources that can meet the criteria described in the RFO document (provided below).

募集要項

Respondents may submit up to two offers to this solicitation by submitting the forms listed below. Forms are available on the RFO Website. The failure to provide the listed information may result in the offer being deemed non-conforming and may disqualify the offer from further consideration.

RFO (PDF)

必要なフォームと書類

プロジェクト説明フォーム (ドキュメント)
プロジェクトごとに1つ提出してください。

Pricing Form – please submit one per project

Baseload Form (xls)

ピークフォーム (xls)

Off-Peak Form (xls)


Note: Respondents may submit more than one pricing option per project.

サイト管理ドキュメント

Copy of completed System Impact Study, a Phase I interconnection study, or results from the WDAT Fast Track process.

モデルPPA (ドキュメント)
-The Model PPA includes some terms that provide options (e.g. 10, 15, or 20 year term). Respondent should provide a redline of the Model PPA that reflects the attributes of their proposed project by selecting the correct options. Terms that do not provide options are non-modifiable.

All offers must be uploaded to the RFO Website no later than Noon, local prevailing time, on the CLOSING DATE (see RFO Schedule). The Project Description Form and Model PPA must be in Word or Word-compatible format (not in PDF). The Pricing Forms must be in Excel or Excel-compatible format (not in PDF). The copy of completed Interconnection Study and Site Control Documentation must be in PDF format.

RFOコミュニケーション

このRFOに関するすべての質問やその他の連絡事項は、電子メールで以下の宛先までお送りください。 [メール保護]. All questions and answers will be posted on this website anonymously. SDG&E will not accept questions or comments in any other form, except during the pre-bid conference. Respondents are encouraged to check this RFO Website periodically for updates, notices, and postings.

入札前会議

SDG&E will hold one pre-bid conference. The pre-bid conference will be on October 27, 2011 in San Diego, California. Participation in the pre-bid conference is NOT mandatory in order to submit an offer. Please monitor this website periodically as the venue will be posted as soon as arrangements are finalized. Please limit participation to two representatives per company.

By October 25, 2011 any potential Respondent interested in attending a pre-bid conference should send an email to: [メール保護]. The email should include the following information:

  • 会社名
  • 出席者の氏名、役職、連絡先情報

RFOのお知らせ

SDG&Eは、スケジュール変更やRFO(入札募集要項)の修正など、入札に関するすべての告知をこのウェブサイトに掲載しますので、定期的にご確認ください。

オファーを送信するには登録が必要です

Any party interested in submitting an offer must register on the RFO Website and upload the offer.

To register, Respondents must fill-out and email an RFO Registration Form (available from the RFO Website) to [メール保護].

SDG&E will process the form and provide the interested party instructions necessary to upload offers.

A username/password combination will be issued allowing access to the offer upload link.

All offers must be uploaded to the RFO Website no later than Noon, local prevailing time, on the CLOSING DATE (see RFO Schedule).

If Respondents encounter technical difficulties with the uploading process, they should provide evidence of such difficulties (e.g. a screen shot of the error message) and email the bid to the RFO inbox by 1:00 p.m., local prevailing time, on the Closing Date.

If the Respondent encounters technical difficulties with both the uploading process and the RFO inbox, they should provide evidence of such difficulties (e.g. a screen shot of the error message or a “sent email” notice with a time stamp before 1:00 p.m. on the Closing Date) and submit a hard copy and a CD of the bid package to SDG&E and the Independent Evaluator at the addresses below by close of business on the day following the Closing Date.

サンディエゴガス&エレクトリックカンパニー
電気・ガス調達部
RAMの勧誘担当者宛
8315 センチュリーパークコート、CP-21D
サンディエゴ、カリフォルニア州92123-1548

 

バーバラ・サンズ
PAコンサルティンググループ
1700 Lincoln Street Suite 4600
コロラド州デンバー80203

1 For additional information please visit: http://docs.cpuc.ca.gov/PUBLISHED/FINAL_DECISION/123021.htm.

2 For additional information please visit: http://www.cpuc.ca.gov/NR/rdonlyres/D68F1B4C-D188-4F02-BF70-CC42BFBB0B71/0/E4414FinalResolution.pdf

RAM Schedule And Deadlines

本RFOには以下のスケジュールと期限が適用されます。SDG&Eは、いつでも独自の裁量でこのスケジュールを改訂する権利を留保します。応募者は、最新のスケジュールおよびRFOまたは募集プロセスへの変更の可能性について、RFOウェブサイトにアクセスする責任があります。

いいえ。

Item

日付

1.

RFO発行済み

2011 年 10 月 17 日

2.

Pre-bidders Conference

27,2011年10月

3.

SDG&E begins accepting bids

2011 年 11 月 1 日

4.

質問提出期限

Question submittal cut-off date

Answers to all questions will be posted on the website no later than 11/10/11

2011 年 11 月 2 日

5.

登録締切日

Those intending to bid must register to receive a username/password in order to upload electronic ofers.

10,2011年11月

6.

決算日

15,2011年11月

7.

NOTIFICATION TO WINNING BIDDERS

2012 年 1 月 31 日

8.

BIDDERS ACCEPTANCE/WITHDRAWAL

Letter due from Winning bidders indicating:

  • Withdrawal from SDG&E's solicitation OR
  • Accetance of standing as a winning bid; withdrawal of participating in any other solicitation and evidence of withdrawal notice to all other solicitors.

2012 年 2 月 10 日

9.

SDG&E issues appreciation notices to unsuccessful respondents

2012 年 3 月 12 日

10.

Executes PPAs for targeted 20MW

2012 年 3 月 12 日

11.

SDG&E submits Tier 2 Advice letter with PPAs to CPUC for approval

April 26, 2012 (45 days after PPA execution)

12.

Anticipated CPUC aproval
(prior to any appeal and/or suspension)

2012 年 5 月 26 日

関連情報

1.29 MB
PDF
RFO
RFO
36.63 KB
DOC
プロジェクト説明フォーム
プロジェクト説明フォーム
56.93 KB
XLS
Baseload Form
Baseload Form
56.64 KB
XLS
ピークフォーム
ピークフォーム
57.79 KB
XLS
Off-Peak Form
Off-Peak Form
176.68 KB
DOC
モデルPPA
モデルPPA