2028-2031 Firm Zero-Emitting Integrated
Resource Planning Reliability RFO 

 

San Diego Gas & Electric Company (“SDG&E”) seeks through this 2028-2031 Firm Zero-Emitting Integrated Resource Planning (“IRP”) Reliability Request for Offers (“RFO”) reopening to procure resources to meet electric system reliability needs as required by California Public Utilities Commission ("CPUC") Decision (“D.”)21-06-035, D.23-02-040 and D.24-02-047 (together, the “Decisions”).

The Decisions require SDG&E to solicit offers from owners and operators for the purchase of eligible system-level resource adequacy (“RA”). Through this RFO, SDG&E is seeking eligible system-level resource adequacy to come online by June 1, 2028, as described in more detail below; provided that, SDG&E will consider offers for resources that may come online by June 1, 2031 pursuant to the requirements set forth in D.24-02-047.

このウェブサイトでは、市場募集の概要を提供しています。応募者の皆様には、この募集要項のあらゆる側面を十分に理解していただくため、下記から入手可能な、関心のある資源の種類に関連する募集要項および関連文書をダウンロードされることを強くお勧めします。

368.51 KB
PDF
SDGE 2028-2031 Firm Zero Emitting IRP Reliability RFO Protocol Reopening
SDGE 2028-2031 Firm Zero Emitting IRP Reliability RFO Protocol Reopening

最新ニュースとアップデート

New Rolling Submission Process

To encourage broader participation and flexibility, SDG&E is now accepting offers on a rolling basis. This open solicitation will remain active 追って通知があるまで, allowing developers to submit proposals at any time. SDG&E will open the submission process on July 1, 2025. The first offer window will close on the last business day of the month, July 31, 2025, at 5:00 PM PPT. SDG&E will begin reviewing offers from the first offer window on the first business day of the following month, August 1, 2025. Also, on the first business day of the following month, August 1, 2025, SDG&E will open the second offer window at 9:00 AM PPT, and close that offer window on the last business day of August, at 5:00 PM PPT. This schedule, with each offer window opening on the first business day of the month at 9:00 AM PPT and closing on the last business day of the month at 5:00PM PPT, with offer review beginning on the first business day of the following month, will continue until further notice.

募集対象製品および提出書類

In accordance with the CPUC Decisions, SDG&E is issuing its 2028-2031 Firm Zero-Emitting IRP Reliability RFO to solicit offers from owners and operators for the purchase of eligible system-level RA to come online by June 1, 2028, and, as described in more detail in the RFO Protocol, SDG&E will accept and consider offers for resources that may come online by June 1, 2031.

これらの決定では、とりわけ、SDG&Eに対し、以下に定めるカテゴリーでより詳細に規定されているように、合計619.5メガワット(MW)の正味適格容量(NQC)を調達することが求められています。 

リソースの種類 2023 2024 2025 2026 2027 2028 トータル

Firm zero-emitting resources

-

- - - - 41.4 41.4

Long-duration storage resources*

-

- - - - 41.4 41.4
Any other type of non-fossil-fueled resource 82.7 247.6 62.3 72.0 72.0 - 536.6
トータル 82.7 247.6 62.3 72.0 72.0 - 619.5
Zero-emitting resources required by no later than 2025** - - 103.1 - - - 103.1

*The LLT resource requirements are equally divided among long-duration storage and firm, zero-emitting generation resources.

**The zero-emitting resources required to replace Diablo Canyon must be procured by 2025, but may occur in any of the years 2023-2025; therefore, the columns do not add to the total.

To meet the requirements, SDG&E seeks to execute agreements for projects that qualify as LLT resources that have the following characteristics:  

  • Generation capacity that has no on-site emissions or is eligible under the requirements of the renewables portfolio standard program and has at least an 80 percent capacity factor. The resource must not be use limited or weather dependent. No storage projects shall qualify under this provision.

SDG&E will consider offers to meet the June 1, 2028, firm, zero emitting resource requirements, in the capacity targets discussed in Table 1, above.  For this requirement, SDG&E will accept and consider offers for projects that have, at a minimum, expected online dates of as discussed above no later than June 1, 2031, but will give priority to offers for projects with expected online dates by June 1, 2028. 

Firm, zero-emitting resources must be generation capacity that has no on-site emissions or is eligible under the requirements of the Renewables Portfolio Standard program and has at least an 80 percent capacity factor. The resource must not be use limited or weather dependent. No storage projects shall qualify under this provision. Additional resource requirements are set forth later in this Protocol.

Participation in this RFO requires the completion of the Offer Form, marked up pro forma agreement and/or confirm templates, credit application, and other documents as applicable. These documents are available via the links below. Failure to provide the listed information may result in an offer being deemed non-conforming and thus may disqualify the offer from further consideration.  

 

オファーフォーム 仮契約書 その他の文書

Firm Zero Emitting Products Offer Form

再生可能資源に関するプロフォーマ契約

Project Description Form, Credit Application, DBE Subcontracting Goal and Reporting (if applicable), Electric Interconnection / Repowering Information, Site Control Information and Permitting Status. 
141.17 KB
XLSX
Firm Zero Emitting Products Offer Form
Firm Zero Emitting Products Offer Form
221.61 KB
DOCX
再生可能資源に関するプロフォーマ契約
再生可能資源に関するプロフォーマ契約
52.91 KB
DOCX
再生可能資源プロジェクト説明フォーム
再生可能資源プロジェクト説明フォーム
127.29 KB
PDF
借入申込書
借入申込書

DBE(少数派・少数派企業)下請け目標および報告(該当する場合) 
Electric Interconnection/Repowering Information provided by Respondent
Site Control Information and Permitting Status provided by Respondent

RFOスケジュール

本RFOに適用される主な期限は以下のとおりです。SDG &Eは、いつでも独自の裁量でこのスケジュールを改訂する権利を留保します。応募者は、最新のスケジュールおよびRFOまたは募集プロセスへの変更の可能性について、RFOウェブサイトにアクセスする責任があります。

いいえ イベント 日付
1 RFO Re-Issued

For each subsequent month, the submission window will open at 9:00 AM Pacific Prevailing Time on the first day of the month.
1年2025月XNUMX日
2 PowerAdvocateへのアクセス登録/RFOフォームおよびドキュメントのダウンロード期限 なし
3 決算日:

オファーは、太平洋標準時午後5時までにPower Advocate®にアップロードされ、受信されなければなりません。
The last business day of each month
4 SDG&Eが提案評価プロセスを開始 The first business day of each month/td>
5 候補者選定および通知 SDG&E will notify respondents within 60 days of the closing date for the month in which the offer was submitted whether their offer was shortlisted.
6 最終選考に残った応募者の承諾/辞退
最終選考に残った応募者から以下の内容を示す書簡が送付される予定です。
a. SDG&Eの入札からの撤退、または
b. 最終選考に残った候補者の承認および最終選考承認料を含む
最終選考通過通知後5営業日
7 SDG&Eが契約交渉を開始 TBD
8 契約交渉完了予定日* TBD
9 SDG&E社が承認のためカリフォルニア州公益事業委員会に協定書を提出 TBD

*Negotiation time will vary depending on proposal specifics, including proposed contract modifications. CPUC filing requirements may also affect negotiation milestones.

提案書の提出 

提案書は、RFPプロトコルに記載されている指示に従ってPowerAdvocate経由で提出する必要があります。入札を希望するものの、PowerAdvocate®のアカウントをまだお持ちでない応募者は、まず登録してユーザー名とパスワードを作成し、イベント(イベントコード230776)へのアクセス権を取得する必要があります。PowerAdvocate®アカウントをお持ちのユーザーは、以下の方法でアクセスをリクエストできます。  

https://www.poweradvocate.com/pR.do?okey=230776&pubEvent=true

RFOコミュニケーション

このIRP信頼性RFOに関するすべての質問やその他の連絡事項は、[email protected]宛てに電子メールで送信し、 [email protected](独立評価者)にもCCで送信してください。