Large Generation Interconnections

Large Generators (above 20 MW)

Generators above 20 MW are considered to be Large Generators and must follow the LGIP (Large Generation Interconnection Procedure) for Distribution System Interconnections.

Attachment F
Large Generator Interconnection Procedures

Attachment G
Large Generator Interconnection Agreement

Applying for Interconnection

To Apply for a Large Generator Interconnection, fill out the form provided. Please read the supplemental documents that outline the interconnection process.

SDG&E LGIP Study Process Summary

SDG&E LGIP Process Supplemental Materials

Contact Information

Customer Generation
San Diego Gas & Electric
8316 Century Park Court, CP52F
San Diego, CA  92123

Office:  (858) 654-8213

E-mail: [email protected]