CPUC Filings

SDG&E's Response to 8/1/08 Assigned Commissioner Ruling 8/18/08
SDG&E's Answer and Motion to Dismiss
Appendices 1-4
Appendices 5-7
Appendices 8-9
   
SDG&E's Phase 2 Reply Brief
06/13/08
SDG&E's Phase 2 Reply Brief  
SDG&E maps, titled "100' ROW ABDSP 041408" (Maps referenced by link on Reply Brief page 26)
   
Active Parties' Phase 2 Reply Briefs  
   
SDG&E's Phase 2 Opening Brief 05/30/08
SDG&E's Phase 2 Opening Brief
SDG&E Exhibit SD-78, titled "Enhanced Northern & DEIR Southern Within ROWs 4-11-08" (Map referenced by link on Brief page 28)
 
Active Parties' Phase 2 Opening Briefs  
   
SDG&E's Phase 2 Rebuttal Testimony 03/28/08
Cover Page and Table of Contents
Chapter 1 SDG&E Response to Phase 2 Testimony of the Center for Biological Diversity and The Sierra Club Updated on April 15, 2008
Chapter 2 SDG&E Response to Phase 2 Testimony of the Division of Ratepayer Advocates
Chapter 3 SDG&E Response to Phase 2 Testimony of the Imperial Irrigation District
Chapter 4 SDG&E Response to Phase 2 Testimony of the Mussey Grade Road Alliance Fire Analysis – Safety and Environmental
Chapter 5 SDG&E Response to Phase 2 Testimony of Powers Engineering
Chapter 6 SDG&E Response to Phase 2 Testimony of the Rancho Penasquitos Concerned Citizens
Chapter 7 SDG&E Response to Phase 2 Testimony of UCAN Updated on April 15, 2008
   
SDG&E's Phase 2 Direct Testimony
03/12/08
Chapter 1 Overview and Summary, Updated on March 14, 2008 and April 15, 2008
Chapter 2 Scope of the Project and Alternatives Updated on April 15, 2008
Chapter 3 Cost Estimates, Updated on March 14, March 25, 2008, April 4, 2008 and April 15, 2008
Chapter 4 Greenhouse Gas Emissions Updated on April 15, 2008
Chapter 5 Fire Risk Updated on April 15, 2008
Chapter 6 SDGE's Enhanced Northern Route, Updated on March 14, March 25, 2008, March 27, 2008 and April 15, 2008
Chapter 7 SDGE's Proposed Route Updated on March 27, 2008 and April 15, 2008
Chapter 8 SDGE's Modified Southern Route Updated on March 25, 2008, March 27, 2008 and April 15, 2008
Chapter 9 Aspen's Northern Route, Updated on March 14, March 25, 2008 and March 27, 2008
Chapter 10 Aspen's Southern Route, Updated on March 14, March 25, 2008 and March 27, 2008
Chapter 11 Economic Comparison of Alternatives, Updated on March 14 and March 25, 2008
Chapter 12 Feasibility and Cost-Effectiveness Considerations of Non-Sunrise Alternatives Updated on April 15, 2008
Chapter 13 Strategic Decisions Group, updated on March 14, 2008 and March 27, 2008
Chapter 14 Cost Cap, Updated on March 14, 2008
Chapter 15 EMF Design
   
   
SDG&E's Phase 1 Reply Brief 11/30/07
SDG&E's Phase I Opening Brief 11/09/07
   
Phase I Hearings Exhibit List 08/31/07
 
Exhibit #  Document Title
SD-1 SDG&E CPCN Application Volume 1
SD-2 SDG&E Purpose and Need Volume 2Public
SD-3C SDG&E Purpose and Need Volume 2 – Confidential(not posted)
SD-4 Amended Application of SDG&E Volume I of II
SD-5 SDG&E August 4, 2006  Purpose and Need Volume 2 Part 1 – Public, Updated on 11/27/06 and 1/19/07
SD-6 SDG&E August 4, 2006  Purpose and Need Volume 2 Part 2 – Public, Updated on 11/27/06 and 1/19/07
SD-7C SDG&E August 4, 2006  Purpose and Need Volume 2 Part 1 – Confidential, Updated on 11/27/06 and 1/19/07 - (not posted)
SD-8C SDG&E August 4, 2006  Purpose and Need Volume 2 Part 2 – Confidential, Updated on 11/27/06 and 1/19/07 -(not posted)
SD-9 Proponent’s Environmental Assessment (PEA) Part 1
SD-10 Proponent’s Environmental Assessment (PEA) Part 2
SD-11 Proponent’s Environmental Assessment (PEA) Appendix A – B
SD-12 Proponent’s Environmental Assessment (PEA) Appendix C through H
SD-13 Supplement to 8/4/06 SDG&E PEA
SD-14 SDG&E January 26, 2007 Chapter VII Supplemental Testimony, Updated on 5/7/07
SD-15 SDG&E June 15, 2007 Rebuttal Testimony Volume 1 of 2 – Public, Updated on 11/7/07
SD-16 SDG&E June 15, 2007 Rebuttal Testimony Volume 2 of 2 – Public, Updated on 7/6/07
SD-17C SDG&E June 15, 2007 Rebuttal Testimony Volume 1 of 2 – Confidential, Updated on 11/7/07 -(not posted)
SD-18C SDG&E June 15, 2007 Rebuttal Testimony Volume 2 of 2 – Confidential, Updated on 7/6/07 -(not posted)
SD-19 500 kV Transmission Lines in California (Illustrative Map)
SD-20 (Exhibit not introduced)
SD-21 (Exhibit not introduced)
SD-22 Prepared Exhibit of Linda P. Brown as Requested by ALJ Weissman at the June 26, 2007 Prehearing Conference – July 6, 2007
SD-23 Rebuttal Testimony of Linda Brown to Rancho Penasquitos Concerned Citizens (RPCC) – June 22, 2007
SD-24 SDG&E Cross-Examination Exhibit: Qualifications of Ali Yari
SD-25 SDG&E Cross-Examination Exhibit: Qualifications of Mike McClenahan
SD-26 SDG&E's January 26, 2007 Chapter VII Supplemental Testimony, Updated on 5/7/07, 7/20/07 and 7/25/07
SD-27 SDG&E June 15, 2007 Rebuttal Testimony Volume 2 of 2 – Public, Updated on 7/6/07, 7/20/07 and 7/25/07
SD-28C SDG&E June 15, 2007 Rebuttal Testimony Volume 2 of 2 – Confidential, Updated on 7/6/07, 7/20/07 and 7/25/07 -(not posted)
Errata 7/25/07
  Errata  
Errata 7/20/07
  Errata  
  Errata to Jan Strack's June 15, 2007 Prepared Rebuttal Testimony  
  Chapter VII – January 26, 2007 Supplemental Testimony, Updated May 7, 2007  
  Chapter VII Exhibits – January 26, 2007 Supplemental Testimony, Updated May 7, 2007  
Rebuttal Testimony 6/22/07
  Jan Strack Testimony  
  James Avery Testimony  
  Linda Brown Testimony  
  Frank Thomas Testimony  
  Victor Kruger Testimony  
  Hal Mortier Testimony  
  William Massey Testimony  
  William Kemp Testimony  
Testimony Workshop 2/02/07
  SDG&E's Testimony Workshop Presentation  
  SDG&E / CAISO Joint Exhibit Presentation  
SDG&E's Supplemental Testimony 1/26/07
  Exhibit A  
  Exhibit B  
  Exhibit C  
  Exhibit D  
  Exhibit E  
  Exhibit F  
  Exhibit G  
  Exhibit H  
  Exhibit I  
  Exhibit J  
Correction to Amended Application 01/19/07
Active Parties 10/13/06 Workshop Report 11/08/06
Workshop Report
Amended Sunrise NOA

SDG&E's Submission in Response to Assigned Commissioner's 9/13/06 PHC Directive

10/02/06
  10/03/06
10/03/06

Supplement to the Application to the CPUC for the Sunrise Powerlink

09/01/06
   

Amended Application to the CPUC for the Sunrise Powerlink

08/04/06
   

Proponent’s Environmental Assessment

08/04/06
 

Chapter 1: Executive Summary

Chapter 2: Project Description

Chapter 3: Alternatives To The Proposed Project

Chapter 4: Environmental Setting

Chapter 5: Desert Link Impacts

Chapter 6: Central Link Impacts

Chapter 7: Inland Valley Link Impacts

Chapter 8: Coastal Link Impacts

Chapter 9: Mitigation Monitoring, Compliance, And Reporting Program

Chapter 10: Growth Inducing Impacts

Chapter 11: Cumulative Impacts

Chapter 12: Public Involvement

Chapter 13: Acronyms

Chapter 14: List of Preparers

 
TABLES  
 
Chapter 2.0 Table 2.3-1: Sunrise Power Link Project Plan of Service
  Table 2.4-1: Standard SDG&E Proposed APMs
  Table 2.7-1: Potential Permits and Approvals
Chapter 3.0 Table 3.3-1: Alternatives Eliminated From Full Evaluation
  Table 3.4-2: Sunrise Power Link Project Plan of Service
Chapter 4.0 Table 4.1-1: Land Uses and Zoning crossed
  Table 4.1-2: Generalized Land Use Designation Definitions
  Table 4.1-3: Agricultural Land Designations
  Table 4.1-4: Applicable Planning Documents, Ordinances, and Policies
  Table 4.2-1: Special Status Plants and Covered Species Potentially Occurring in the PSA
  Table 4.2-2: Special Status Wildlife and Covered Species Potentially Occurring in the PSA
  Table 4.3-1: Sensitivity Analysis for Cultural Resources
  Table 4.3-2: Native American Contacts
  Table 4.3-3: Terminology for Culture History in the San Diego Area
  Table 4.4-1: Examples of Outdoor Day-Night Average Sound Levels in dB(A) measured in various places
  Table 4.4-2: Existing Background Noise within the PSA
  Table 4.5-1: Specially Managed Recreation Areas Near the Proposed Project and Alternative Alignments
  Table 4.5-3: Central Link Recreational Resources by Jurisdiction along PSA
  Table 4.5-4: Inland Valley Link Recreational Resources by Jurisdiction along PSA Route
  Table 4.5-5: Coastal Link Recreational Resources by Jurisdiction along PSA
  Table 4.6-1: Surface Water Resources Crossed by the Proposed Project
  Table 4.6-2: Hydrological Features in the Proposed Project
  Table 4.6-3: Hydrological Resources of the Alternative Alignments and Segment Options
  Table 4.6-4: Possible Locally Generated Tsunami along the Southern California Coast
  Table 4.6-5: Permits and Agencies associated with Project Approvals
  Table 4.7-1: PSA Elevations
  Table 4.7-2: Geologic Conditions in the PSA
  Table 4.7-3: Soils and Selected Soil Properties Located within the PSA
  Table 4.8-1: Historical Population Trends
  Table 4.8-2: Regional Ethnicity
  Table 4.8-3: Ethnicity of Census Tracts Crossed by the Project, 2000 Census Tracts 88.34-169.02
  Table 4.8-4: 2000 Census Housing
  Table 4.8-5: 2000 Census Unemployment Rates
  Table 4.8-6: Employment by Industry, Imperial and San Diego Counties, 2003
  Table 4.8-7: Census 2000 Median Household Income
  Table 4.8-8: Census 2000 Estimated Poverty Level in the Region of Influence
  Table 4.9-1: Key Observation Point Locations by Project Link
  Table 4.10-1: Summary of Roadway Characteristics along the Alignment Corridor
  Table 4.10-2: Bus Routes in PSA
  Table 4.11-1: Temperature and Precipitation Data for PSA
  Table 4.11-2: Annual Wind Data for PSA
  Table 4.11-3: 2006 Federal Air Quality Designations
  Table 4.11-4: 2004 State Air Quality Designations
  Table 4.11-5: Salton Sea Air Basin Measured Air Quality Statistics
  Table 4.11-6: San Diego Air Basin Measured Air Quality statistics
  Table 4.11-7: Ambient Air Quality Standards
  Table 4.12-1: Utility Service Providers by Jurisdiction
Chapter 11.0 Table 11.1-1: Cumulative-Approved and Pending Projects Sunrise Project
Chapter 12.0  Table 12.1-1:  Consultation and Presentations
 
FIGURES  
 
Chapter 2.0 Figure 2.1-1: Project Vicinity
  Figure  2.1-2: SDG&E Service Area
  Figure  2.1-3: Jurisdiction
  Figure  2.1-4: Proposed Project Facilities
  Figure  2.3-1A: Proposed Project
  Figure  2.3-1B: Proposed Project Desert Link
  Figure  2.3-1C: Proposed Project Desert Link – ABDSP
  Figure  2.3-1D: Proposed Project Central Link
  Figure  2.3-1E: Proposed Project Inland Valley Link
  Figure 2.3-1F: Proposed Project Ramona Link
  Figure 2.3-1G: Proposed Project Coastal Link
  Figure 2.3-1H: Proposed Project Coastal Link – Segment Options
  Figure 2.3-1I: Other System Upgrades
  Figure 2.3-2A: 500 kV Single Circuit Steel Pole
  Figure 2.3-2B: 500 kV Single Circuit Steel H-Frame
  Figure 2.3-2C: 500 kV Single Circuit Lattice Tower
  Figure 2.3-2D: 500 kV Single Circuit Lattice Tower w/69 kV or 92 kV Underbuild
  Figure 2.3-2E: 230 kV Double Circuit Steel Pole
  Figure 2.3-2F: 230 kV Double Circuit Lattice Tower
  Figure 2.3-2G: 230 kV Single Circuit Steel Cable Pole
  Figure 2.3-2H: 69 kV Double Circuit Steel Pole
  Figure 2.3-2I: 92 kV Single Circuit Steel Cable Pole
  Figure 2.3-2J: 69 kV Single Circuit Steel Cable Pole
  Figure 2.3-2K: 69 kV Single Circuit Wood Cable Pole
  Figure 2.3-2L: Typical 230 kV Duct Bank Coastal Link
  Figure 2.3-2M: Typical 230 kV Double Circuit Duct Bank Inland Valley Link
  Figure 2.3-2N: Typical 69/92 kV Duct Bank Desert Link
  Figure 2.3-2O: Typical 230 kV Manhole Inland Valley Link
  Figure 2.3-2P: Typical 92 kV Manhole Desert Link
  Figure 2.3-2Q: Typical 69 kV Manhole Desert Link
  Figure 2.3-3A: Central East Substation 500/230/12 kV Equipment One Line Diagram
  Figure 2.3-3B: Central East Substation 500/230 kV Switchyard General Arrangement
  Figure 2.3-3C: Central East Substation 500/230 kV Switchyard – Section – A – A –
  Figure 2.3-3D: Central East Substation 500/230 kV Switchyard – Sections – B – B & D
  Figure 2.3-3E: Central East Substation 500/230 kV Switchyard – Section – C – C –
  Figure 2.3-3F: Central East Substation
  Figure 2.3-3G: Central East Substation Landscape Plan
Chapter 3.0 Figure 3.3-1A: Corridor Analysis – A
  Figure 3.3-1B: Corridor Analysis – B
  Figure 3.3-1C: Corridor Analysis – C
  Figure 3.3-1D: Corridor Analysis – D
  Figure 3.3-2: Macro – Analysis Corridors
  Figure 3.4-1A: Proposed Project & Alternatives Desert Link
  Figure 3.4-1B: Proposed Project & Alternatives Desert Link – ABDSP
  Figure 3.4-1Ci: Proposed Project & Alternatives Central Link – Central East Substation
  Figure 3.4-1Cii: Proposed Project & Alternatives Central Link – Central South Substation
  Figure 3.4-1D: Proposed Project & Alternatives Inland Valley Link
  Figure 3.4-1E: Proposed Project & Alternatives Ramona Link
  Figure 3.4-1F: Proposed Project & Alternatives Coastal Link
  Figure 3.4-1G: Proposed Project & Alternatives Coastal Link – Segment Options
  Figure 3.4-1H: Regional Location Desert Link
  Figure 3.4-1I: Regional Location Desert Link – ABDSP
  Figure 3.4-1J: Regional Location Central Link
  Figure 3.4-1K: Regional Location Inland Valley Link
  Figure 3.4-1L: Regional Location Coastal Link
  Figure 3.4-3: Alternative 500/12 kV Substation
Chapter 4.0 Figure 4.1-1A: Land Use Desert Link
  Figure 4.1-1B: Land Use Central Link
  Figure 4.1-1C: Land Use Inland Valley Link
  Figure 4.1-1D: Land Use Coastal Link
  Figure 4.1-1E: Land Use Reconductor Area
  Figure 4.1-1F: Zoning Desert Link
  Figure 4.1-1G: Zoning Central Link
  Figure 4.1-1H: Zoning Inland Valley Link
  Figure 4.1-1I: Zoning Coastal Link
  Figure 4.1-1J: Zoning Reconductor Area
  Figure 4.1-2A: Agriculture Desert Link
  Figure 4.1-2B: Agriculture Central Link
  Figure 4.1-2C: Agriculture Inland Valley Link
  Figure 4.1-2D: Agriculture Coastal Link
  Figure 4.1-2E: Agriculture Reconductor Area
  Figure 4.4-1A: Proposed Noise Monitoring Locations Desert Link
  Figure 4.4-1B: Proposed Noise Monitoring Locations Central Link
  Figure 4.4-1C: Proposed Noise Monitoring Locations Inland Valley Link
  Figure 4.4-1D: Proposed Noise Monitoring Locations Coastal Link
  Figure 4.6-1: Hydrologic Regions
  Figure 4.6-2A: Waters of the U.S. & Groundwater Basins Desert Link
  Figure 4.6-2B: Waters of the U.S. & Groundwater Basins Central Link
  Figure 4.6-2C: Waters of the U.S. & Groundwater Basins Inland Valley Link
  Figure 4.6-2D: Waters of the U.S. & Groundwater Basins Coastal Link
  Figure 4.7-1A: Geology Desert Link
  Figure 4.7-1B: Geology Central Link
  Figure 4.7-1C: Geology Inland Valley Link
  Figure 4.7-1D: Geology Coastal Link
  Figure 4.7-2A: Soils Desert Link
  Figure 4.7-2B: Soils Central Link
  Figure 4.7-2C: Soils Inland Valley Link
  Figure 4.7-2D: Soils Coastal Link
  Figure 4.7-3A: Fault Zones Desert Link
  Figure 4.7-3B: Fault Zones Central Link
  Figure 4.7-3C: Fault Zones Inland Valley Link
  Figure 4.9-1A: Key Observation Point Locations Desert Link
  Figure 4.9-1B: Key Observation Point Locations Desert Link – ABDSP
  Figure 4.9-1C: Key Observation Point Locations Central Link
  Figure 4.9-1D: Key Observation Point Locations Inland Valley Link
  Figure 4.9-1E: Key Observation Point Locations Ramona
  Figure 4.9-1F: Key Observation Point Locations Coastal Link
  Figure 4.9-2: D1 KOP D1 Existing Condition
Chapter 5.0 Chapter 5 Simulations
Chapter 6.0 Chapter 6 Simulations
Chapter 7.0 Chapter 7 Simulations
Chapter 8.0 Chapter 8 Simulations
 
 
Archived Filings
  Application to CPUC for Sunrise Powerlink 12/14/05
   
  Various Filings 01/31/06