NEM Documents

Processes & Guides

  • NEM Application Process Guide
    • Start Here: This guide covers the basic process of creating a My Partners account, accessing DIIS and submitting an application for NEM. 
  • NEM - DIIS User Guide
    • ​Description:  This user guide (212 pages) gives detailed information about the Distribution Interconnection Information System (DIIS). 

Systems Generating 30kW or Less

When applying, use DIIS for the fastest and most accurate process.  Submitting a paper-based or email-based application will require manual processing and will take longer time to process.

Systems Generating More than 30kW 

When applying, please use DIIS for the fastest and most accurate process. Using a paper-based or email-based application will require manual processing and will take longer time to process.  

NEM Aggregation and Virtual NEM 

When applying, please use DIIS for the fastest and most accurate process.  Using a paper-based or email-based application will require manual processing and will take longer time to process.

  • NEM - REC Compensation Form
    • Decription:  Net Energy Metering (NEM), Virtual Net Energy Metering (NEM-V), and Virtual Net Energy Metering for Multi-family Affordable Housing (VNM-A) Renewable Energy Credits Compensation Agreement.

References and Forms