Form 142-05203
Interconnection Application Form
Form 142-0541
Customer Generation Agreement
Form 142-0542
Generation Facility Interconnection Agreement (3rd Party Inadvertent Export) *
Form 142-0543
Generating Facility Interconnection Agreement (3rd Party Non-Exporting) *
Form 142-0544
Generating Facility Interconnection Agreement (Inadvertent Export) *
Form 142-0545
Generating Facility Interconnection Agreement (Continuous Export)
Form 142-05202
Generating Facility Interconnection Agreement
Self-Generation Gas and Electric Datasheet
This form is necessary to gather information for the proposed installation of a self-generation system.
Generating Facility Interconnection Application
The application is used to request the interconnection of a Generating Facility to SDG&E's Distribution System (over which the CPUC has jurisdiction).
Letter of Authorization (LOA)
One LOA is required for each third party i.e. consulting engineer, vendor, or contractor.
Sample Warning Plaques
Example of a warning plaque which SDG&E and the local permitting agencies require to be placed on each customer's meter panel and on the visible and or lockable disconnect to be installed adjacent to the meter panel.
Sample One-line Electrical Diagram
Example of a one-line diagram.
Sample Efficiency Monitoring Data Summary Sheet
Sample of a data request SDG&E requires annually to review your system operating efficiency.