*SDG&E is at 1.41% of its Net Energy Metering Cap as of March 31, 2013
Once the Cap has been reached, Schedule NEM may be closed to new customers.
|
Current Installed Cap (MW) |
x 100% |
= Current percent of max cap |
Calculation: |
||
|
170.7 MW |
x 100% |
= 28.1% |
|
Remaining NEM allotment of max cap: 606.7 - 170.7 = 436 MW 5.0% of Cap X 28.1% = 1.41%* *SDG&E is at 1.41% as of March 31, 2013 |
||
Cap Formula: (Current SDG&E Cap – 5.0%) x 12,134.2 MW = 606.7 MW
Installed PV Capacity Through March 31, 2013: 170.7 MW
Available Capacity Under the Cap: Cap – Installed PV Capacity;
606.7 MW – 170.7 MW = 436 MW
Percentage of MW Cap Installed:
(Currently Installed MW / SDGE Cap) x 100% = % MW
Installed currently: 170.7 MW / 606.7 MW x 100% = 28.1%
Percentage of MW Cap Available: 100% - % Cap installed;
100% - 28.1% = 71.9%
Percentage of 5.0% Cap Installed: 28.1% x 5.0% = 1.41%
Percentage of 5.0% Cap Available: 5.0% - 1.41% = 3.59%
Cap History (pdf)
For more information regarding Interconnection Applications, Electrical Standards, and Permission to Operate, please call our Net Energy Metering department at 858-636-5585 or an email to netmetering@semprautilities.com.
For more information regarding NEM Billing, Rates, Solar Rebate Programs, and Meter Access Issues, please call us at 1-800-411-7343.
SDG&E and San Diego Gas & Electric are registered trademarks of San Diego Gas & Electric Company.
© 1998-2013 San Diego Gas & Electric Company. The Trademarks used herein are the property of their respective owners. All rights reserved.